Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
Auditing, Assurance and Governance in Local Government
Managing a Successful Mechanical System project Following design – what next?
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
U.S. Green Building Council Cascadia Chapter
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Commissioning: The Most Important Component of LEED ® by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
Building Commissioning
School of Computing, Dublin Institute of Technology.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
ENERGY CONSERVATION TEAM (Facility Audits and Recommissioning )
Purpose of the Standards
Software Engineering Institute Capability Maturity Model (CMM)
4. Quality Management System (QMS)
ACG CxA WORKSHOP WEBINAR CxA Workshop St. Petersburg, Florida 8:00 AM 13 October 2008Renaissance Vinoy Resort CxA Workshop St. Petersburg, Florida Renaissance.
ACG CxA WORKSHOP WEBINAR Facility Commissioning Group AABC Commissioning Group - CxA Workshop Las Vegas, Nevada – MGM Grand April 22, 2008 Jim Magee, CxA.
4. Quality Management System (QMS)
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
PMI Bluegrass May 2012 Lunch Presentation: Commissioning Building Systems Commissioning for Project Managers.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Introduction to Software Quality Assurance (SQA)
9 Closing the Project Teaching Strategies
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.
From Research Prototype to Production
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
QUALITY MANAGEMENT STATEMENT
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
the Basic Commissioning (Cx) Process
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Project Management Processes
TechStambha PMP Certification Training
(Additional materials)
UNIT V QUALITY SYSTEMS.
AABC Commissioning Group - CxA Workshop Las Vegas, Nevada – MGM Grand
Engineering Processes
CMGT 380 Green Building Practices and LEED Certification
Regulatory Oversight of HOF in Finland
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Project Management Processes
Software Reviews.
Presentation transcript:

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Key D efinitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning (Cx): A quality assurance centered process of documentation, training, adjustment, testing, and verification, performed specifically to ensure that the finished facility operates in accordance with the owner’s documented project requirements and the construction documents. It begins in predesign and continues through design, construction, and the life of the facility. (BCA draft document, 2004.) Commissioning (Cx): A quality assurance centered process of documentation, training, adjustment, testing, and verification, performed specifically to ensure that the finished facility operates in accordance with the owner’s documented project requirements and the construction documents. It begins in predesign and continues through design, construction, and the life of the facility. (BCA draft document, 2004.) Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Owner: Owner:  Financially or Politically Committed  Users  Operations & Maintenance staff Key concept is Taking Responsibility for Quality. Key concept is Taking Responsibility for Quality. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning Authority (CA): An individual (or firm), representing the facility owner, who leads the Commissioning effort until project completion. Commissioning Authority (CA): An individual (or firm), representing the facility owner, who leads the Commissioning effort until project completion. Key concept is Leading. Key concept is Leading. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning Team: A body of subject matter experts who assist the Commissioning Authority in carrying out the Commissioning Process. Commissioning Team: A body of subject matter experts who assist the Commissioning Authority in carrying out the Commissioning Process. Key concept is Managing. Key concept is Managing. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning Provider (CP): When the facility owner separates out the duties of the CA. Commissioning Provider (CP): When the facility owner separates out the duties of the CA.  An independent third-party commissioning firm  An A/E firm  The general contractor, or  Owner's in-house personnel Selected by the CA, to assist the Commissioning Team in handling the technical requirements of the Commissioning process Key concept is Doing. Key concept is Doing. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Owner’s Project Requirements a.k.a. Design Intent Document: Owner’s Project Requirements a.k.a. Design Intent Document:  D etailed technical document developed under the leadership of and primarily by the Commissioning Authority from discussions with the facility owner that states concepts, budget, and performance criteria to which the completed project must conform.  The basis for Building Commissioning. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Basis of Design: A document that records the concepts, calculations, decisions, and product selections to meet the Owner’s Project Requirements and to satisfy applicable regulatory requirements, standards, and guidelines. The document includes both narrative descriptions and lists of individual items that support the design process. (ASHRAE Draft Guideline 0-200X, The Commissioning Process, dated August 2002.) Basis of Design: A document that records the concepts, calculations, decisions, and product selections to meet the Owner’s Project Requirements and to satisfy applicable regulatory requirements, standards, and guidelines. The document includes both narrative descriptions and lists of individual items that support the design process. (ASHRAE Draft Guideline 0-200X, The Commissioning Process, dated August 2002.)  Technical expression of the less technical Owner's Project Requirements. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning Plan (CxP): A document prepared by the Commissioning Authority that outlines the following: Commissioning Plan (CxP): A document prepared by the Commissioning Authority that outlines the following:  Organization of the Cx Team  Member responsibilities  Schedule of Cx events  Allocation of Cx resources, and  Documentation requirements of the Cx process. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning (Cx): A planned and integrated systematic process to ensure, through documented verification, that all Building Systems perform interactively according to the Owner's Project Requirements. Commissioning (Cx): A planned and integrated systematic process to ensure, through documented verification, that all Building Systems perform interactively according to the Owner's Project Requirements.  Commissioning procedures require a collaborative team effort and begin in the predesign phase, continue through the design and construction phases into the initial occupancy phase, including the training of O&M staff. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Recommissioning (ReCx): A periodic event in the life of an existing building that reapplies the original commissioning plan in order to return or keep the facility operating according to the original design intent/owner’s project requirements while accounting for current operating and code requirements. Recommissioning (ReCx): A periodic event in the life of an existing building that reapplies the original commissioning plan in order to return or keep the facility operating according to the original design intent/owner’s project requirements while accounting for current operating and code requirements. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Retrocommissioning (RetroCx) a.k.a. Existing Building Commissioning: Retrocommissioning (RetroCx) a.k.a. Existing Building Commissioning:  RetroCx is an initiative in the life of an existing building that has never been commissioned.  Employs a total facilitycomponent and systems deficiency analysis to create a Commissioning Plan and subsequent project that returns the facility to its original design intent/owner’s project requirements while accounting for current operating and code requirements. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Continuous Commissioning (CCx) a.k.a. Ongoing Commissioning: Continuous Commissioning (CCx) a.k.a. Ongoing Commissioning:  Upon completion of commissioning or retrocommissioning, Owner continues to collect and compare baseline data on selected building systems against post-commissioning results to ensure that the monitored systems function optimally throughout their design lives.  Made possible because of the initial commissioning process. Key Definitions

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Why Commission?

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Better Buildings Building owners are finding that the energy, water, and productivity savings achieved by commissioned buildings can offset the cost of the commissioning process. Studies indicate 8 to 20 percent savings in building operating costs over those in a non-commissioned building*. Better Buildings Building owners are finding that the energy, water, and productivity savings achieved by commissioned buildings can offset the cost of the commissioning process. Studies indicate 8 to 20 percent savings in building operating costs over those in a non-commissioned building*. * Source: Building Commissioning Guide, Version 2.2, GSA/DOE, dated July 30, 1998 Why Commision?

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Better People Aside from achieving documented costs savings and cost avoidance, commissioning enhances customer satisfaction and assures proper ongoing training of the facility Operations & Maintenance personnel. Better People Aside from achieving documented costs savings and cost avoidance, commissioning enhances customer satisfaction and assures proper ongoing training of the facility Operations & Maintenance personnel. Why Commision?

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Better Stewardship Better Stewardship  Sustainablity  Reduce resource depletion of energy, water and raw materials  Create built environments that are livable, healthy and productive  LEED ® Certification Why Commision?

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004  Engage a Cx team that does not include individuals directly responsible for project design or construction management.  Review the Design Intent and the Basis of Design docs.  Incorporate Cx requirements into the construction documents.  Develop and utilize a Cx plan.  Verify installation, functional performance, training, and operation and maintenance documentation.  Complete a Cx report. * Leadership in Energy and Environmental Design-- U.S. Green Building Council Why Commision? For LEED ® 2.1 Certification Prerequisite

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004  Cx authority independent of the design team to review design prior to the construction documents phase.  Independent Cx authority to review construction documents near completion of the construction document development and prior to issuing the contract documents for construction..  Independent Cx authority to review contractor submittals relative to systems being commissioned.  Provide the owner with a single manual that contains the information required for re- commissioning building systems.  Have a contract in place to review building operation with O&M staff, including a plan for resolution of outstanding Cx-related issues within one year after construction completion. * Leadership in Energy and Environmental Design-- U.S. Green Building Council Why Commision? For LEED ® 2.1 Certification Additional Credit

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning Tasks Within Project Phases

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning Tasks Within Project Phases  Planning 1. Bring on Commissioning Authority / Commissioning Provider. 2. Establish Owner's Project Requirements / Design Intent Document. 3. Review Record Drawings & Historical Data. 4. Select Commissioning Team. 5. Develop Schedule of Cx Meetings. 6. Develop Commissioning Budget. 7. Develop Commissioning Plan. 8. Issue final Commissioning Report.  Design 1. Repeat items under Planning Phase if Cx process is initiated in this phase. 2. Validate the Design Intent Document. 3. Develop a draft Construction Cx Plan. 4. Develop Specifications for Cx Construction Phase. 5. Review design documents for adherence to Design Intent Document.

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning Tasks Within Project Phases  Construction 1. Repeat appropriate items under Planning Phase if Cx process is initiated in this phase. 2. Revalidate Design Intent Document. 3. Develop or finalize Construction Cx Plan. 4. Develop and execute prefunctional checklists. 5. Develop Functional Performance Test (FPT) plan. 6. Validate operator training plan.  Acceptance 1. Execute FPTs. 2. Monitor operator training. 3. Schedule & conduct deferred FPTs. 4. Validate maintenance schedules and draft recommissioning plan.

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 What Does Commissioning Cost?

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning(Cx) (New Construction) 0.5 to 1.5 Percent of Total Construction Cost Retrocommissioning(RetroCx) (Existing Construction) 3.0 to 5.0 Percent of Total Operating Cost Source: Building Commissioning Guide, Version 2.2, DOE/GSA, July 30, 1998 What Does Commissioning Cost?

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 The Economics of Commissioning * Based on research findings from University of Wisconsin, ASERTTI Training Module, 1998 If planned correctly and implemented early enough in the design process, commissioning can be included with little or no cost impact*. Without Commissioning With Commissioning Design Phase Costs Construction Phase CostsFirst Year Warranty Period Costs Design Phase Costs Construction Phase Costs First Year Warranty Period Costs What Does Commissioning Cost?

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 The Economics of Commissioning An Initial Budget Setting Thumb-Rule-- 2 % - 3 % of mechanical construction cost plus 1 % - 2 % of electrical construction cost (Source: BCA. Based on six science building projects) What Does Commissioning Cost?

Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 Commissioning— Results in a comfortable, healthy working environment that promotes productivity. Results in a comfortable, healthy working environment that promotes productivity. Achieves both capital cost avoidance and annual operating cost reduction. Achieves both capital cost avoidance and annual operating cost reduction. Increases facility maintainability and reliability via training of Facility Management Personnel. Increases facility maintainability and reliability via training of Facility Management Personnel. Improves the overall quality of the completed initiative. Improves the overall quality of the completed initiative. Conclusion