D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
A Silicon Disk Tracker in forward direction for STAR News since November 2000 Physics Capabilities capabilities Requirements / Potential Technologies Possible.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
J. Brau LCWS 2006 March, J. Brau LCWS Bangalore March, 2006 C. Baltay, W. Emmet, H. Neal, D. Rabinowitz Yale University Jim Brau, O. Igonkina,
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades Jan 2005 Lawrence Berkeley Lab Welcome.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
ACES Mar 2007Geoff Hall1 System level requirements for upgraded tracker.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
SUMMARY AND DISCUSSION SAVERIO D’AURIA. SUMMARY Expertise from various experiments and from people with different background We tried to factorize what.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Detector building Notes of our discussion
 Silicon Vertex Detector Upgrade for the Belle II Experiment
BaBar Silicon Tracker Perspective
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Vertex Detector Mechanical R&D Design Questions and Issues
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
SiD Electronic Concepts
Silicon tracker and sensor R&D for sPHENIX
Grounding, Power Distribution
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
Presentation transcript:

D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost

D. Lissauer, BNL. 2 Detectors: General Considerations LHC SLHC  s 14 TeV 14 TeV L Bunch spacing  t 25 ns 12.5 ns  pp (inelastic) ~ 80 mb ~ 80 mb N. interactions/x-ing ~ 20 ~ 100 (N=L  pp  t) dN ch /d  per x-ing ~ 150 ~ 750 charge particles ~ 450 MeV ~ 450 MeV Track density 1 10 Pile-up noise in cal 1 ~3 Dose central region 1 10

D. Lissauer, BNL. 3 Inner Tracking Assumption is that the inner tracker will need to be re-built using higher granularity detectors in a harder radiation environment in order to preserve the current pattern recognition, momentum resolution, b-tagging capability.  Radiation increase by ~ 10.  To keep Occupancy constant granularity has to increase by a factor 10. Small Radius Region: Vertex detector (r < ~20cm) aim for a pixels size factor ~ 5-8 smaller than today (50x400  m 2  ~ 50 x ~ 50  m 2 )  benefit b-tagging,  -tagging R&D: Pixels Sensor Technologies Super rad-hard electronics to achieve small pixel size

D. Lissauer, BNL. 4 Inner Tracking Intermediate Radius: ~20<r<~60 cm Aim for cell sizes 10 times smaller than conventional Si strip detectors. benefit: momentum-resolution and pattern recognition R&D: Lower cost/channel compared to present Si strip detectors Si macro-pixels of an area ~1mm 2 : pads or shorter strips ? Single sided two dimensional readout (new concepts) Large Radius: ~60<r Large area Si detectors. Could use present day ‘radiation resistant’ strip technology, or new single sided technology R&D: Similar to intermediate radius – less demanding except for cost.

D. Lissauer, BNL. 5 Inner Tracking Engineering/Integration: Aim at a factor of ~10 more channels but with less material. This means that the System aspects have to be integrated and understood from the start. R&D: new light weight materials for stable structures. Power & Power distribution. Multiplexing of readout. cooling. alignment. installation and maintenance aspects. (replacement of existing infrastructure) Activation: 250  Sv/h – implications for access and maintenance Timescale : Need ~ 8-10 years from launch of R&D ~ 4-6 years of R&D and prototyping, ~4 years to build,

D. Lissauer, BNL. 6 R&D Scope 1.Simulation: Detector geometry, readout granularity. 2.Support Structure: Integrated Support of the ID, “Mass less”. 3.Cooling: Thermal management of the system. 4.Si Detector: Technology, Contact with industry. 5.Readout: Technology,Power, Connections. 6.Module Layout: Technology, Integration at the module level. 7.System Infrastructure: Cabling, Multiplexing, 8.Optical Links: Power consideration,multiplexing, Rad hard. 9. Power Supplies: Location, distribution, Cabling. 10.Radiation Hardness: Radiation hardness of ALL components. 11.Assembly/Installation: Assembly and installation above ground and in pitt. 12.System Tests: Validation of the performance at the system level.

D. Lissauer, BNL. 7 1.Simulation Tracker configuration: Overall optimization of the tracker. Number of layers in the inner, middle and outer radius. Sensor geometry: For each layer determine the detector granularity, readout geometry. Optimal readout: Analog.vs. digital, speed of the readout. Data Compression: Study possible data compression schemes.

D. Lissauer, BNL. 8 Space – Boundary Conditions – Simulation: detector geometry, readout granularity TRT SCT Pixel

D. Lissauer, BNL. 9 2.Support Structure Conceptual design: –beam pipe support –Vertex detector support –Intermediate Si tracker support –Outer Layer Support –Assembly Technology: –Materials –Optimal Configuration –Assembly –FEA Calculations Services/Cooling interface: –Integration of the Support structure and the services/cooling. –Interface to the Thermal Shield.

D. Lissauer, BNL Thermal Management Conceptual Design –Cooling capacity –Cooling method »Evaporative Cooling »Binary ICE –Operating temperature »Pixels and SCT run at –7 0 C Thermal enclosures –Heat Shields and thermal divisions Cooling Control Prototype Cooling System

D. Lissauer, BNL Si Detector - I Issues: –Cost – Detector /Readout –Connectivity –Radiation hardness –Optimal temperature operation Detector Technology: –Inner Radius Candidate Technologies: »3D – readout »Integrated readout and Pixel in one wafer »Cryogenics detectors –Middle and Outer Radius: »2D Single sided detectors »“Macro pixel Detectors” »Si Strips Wafer Size –Wafer Size – aim to go to higher Wafers to reduce cost as well as number of detectors. Presently 6” are used should be able to go to 8” and possibly 12”.

D. Lissauer, BNL Readout Issues: –Multiplexing Technology: –ATLAS SCT readout used the DMILL process – will not be available to upgrade –PIXEL has used IBM deep sub-micron need to investigate the limit of the radiation hardness of this process. New readout chip development: –Tools

D. Lissauer, BNL Module Layout - I Issues: -Module layout and interface to readout electronics. -Interface to services. -Production Cost. -Industrial Solution vs. Assembly at inst. Technology:

D. Lissauer, BNL Cabling/ Multiplexing/ Grounding. Issues: -Cable routing. -Multiplexing. -Production Cost. -Industrial Solution.

D. Lissauer, BNL Optical Links Issues: -Development of new fast optical Links – Power. -New technology – Industrial solution. -Production Cost.

D. Lissauer, BNL Power Supplies Issues: -Location of power supplies. -Optimal Multiplexing of power and implication on Noise, Cable, cost etc. -New readout technology moves toward low voltage, implication is that we will need very large currents unless we can “Ladder” the power.

D. Lissauer, BNL Radiation Hardness Issues: -Testing of all components to new levels.

D. Lissauer, BNL Assembly /Installation Issues: -Replacing present ID with new one – while the rest of the experiment stay in tact more or less. -E.g: Cable routing when the Muon chambers are in place? Do we need to remove BIL, BIS Chambers? -Max amount of cables services we can route?

D. Lissauer, BNL System Tests Issues: -Ideas on multiplexing, power dist. Etc. all need to be confirm in a ‘realistic” condition. -Cooling systems need to be tested and developed. -Combine test of the whole system needs to be done to validate both the concept and the “system” aspects. -ATLAS was (is) very weak on this point.

D. Lissauer, BNL. 20 Tracker Upgrade Schedule –ATLAS will start running in ’07 and for the first 5 years will operate with the present ID. –After ~ 5 years the LHC Luminosity will be upgraded and a new and improved ID will be needed. –Even if there is no Luminosity upgrade we expect that the ID will need to be upgraded. –The time scale is: Formal proposal’04 –Identify Collaborators in the US and outside. R&D – “directed” Generic’04-’09 Proposal for ATLAS Upgrade’09-’10 Production of New ID Tracker’10-’13 Installation of new ID Tracker’14

D. Lissauer, BNL. 21 Tracking Cost estimate The estimate is very preliminary and is based on the following assumptions: The active components of the tracker are all Si. The inner radius has upgraded Si Pixel detectors, followed by Si Strip detectors, in the outer radius we use single sided 2-D Si detectors. The estimate was done by scaling the cost of the ATLAS Si detector as well as information from CMS, and the CDF/D0 upgrade cost. In scaling the costs we had to make assumptions on how the main cost drivers will scale with the number of channels, the area and the expected time evolution. The R&D and final design will have to be driven by optimizing the cost to performance of the overall system.

D. Lissauer, BNL. 22 Tracking Cost estimate –Mechanics: The mechanics does not scale with the number of channels. One has to keep the services and the total weight to a minimum. The cost estimate assumes there is added complexity due to light weight: –Si Detectors: Scale with the detector area. The optimization of the number of layers and exact location has not been finalized. The total amount of Si will be factor of ~ 5-10 greater than the present ATLAS detector. Possible cost reduction: Si detectors: Cost is driven largely by wafer size. Industry is moving toward larger wafers. Minimize the the amount of Si: by using advances in detector technology. For example single sided 2D readout can be used in the medium and larger radii where the segmentation needs are dominated by tracking accuracy rather than occupancy.

D. Lissauer, BNL. 23 Tracking Cost estimate –On detector read out electronics: The readout electronics cost is driven by the number of channels. Take advantage of the reduction in the feature size of the electronics. (ATLAS design used ATMEL/DMILL rad hard technology that has a conservative feature size of 1.2 Micron in the Strips. CMS and ATLAS pixels are using sub micron technology of 0.25 micron) Present industry standard is 0.18 moving toward 0.13 microns. Expect that by the time we go into production the standard feature size will be as low as 0.08 microns. Allowing for a substantial reduction in the power and space needed for the electronics and allowing for finer granularity without an increase in power and space needed. The reduction in power has important implication also on the cooling and services that will be needed.

D. Lissauer, BNL. 24 Tracking Cost estimate –Module integration: Module integration costs include costs of Hybrids and the components assembly. In the case of the Pixel detectors the cost of bump bonding Si is a significant part of the module integration. Significant cost reductions are possible assuming one of the integrated developments matures in time. They integrate the readout and the active detector on the same wafer eliminating the need for individual bonds. – Cables & Data Links: Assumed a higher level of multiplexing compared to the present solutions. In particular the amount of power cables that need to be reduced for physics (reduced mass), space and cost reasons. –Power Supplies: Power supplies will need to be optimized and serve a larger number of modules. This has implication on coherent noise and very detailed system integration will be needed to achieve this.

D. Lissauer, BNL. 25 Tracking Cost estimate –Cooling: (Additional) The needed cooling capacity will scale with the number of channels, but we have taken advantage of the lower power requirements of the lower feature size electronics. A large part of the external cooling can be reused. –Off detector electronics: (Read out Drivers) We have to take advantage of advances and reduction in the cost of electronics. We assume that a factor of 10 more data 10 years from now will cost factor of ~ 1.5 more than present cost. The Tracker cost for one detector thus estimated to be between M$. (assuming the full detector is built in the US) These numbers are only given as a rough estimate. We are not ready for an engineering estimate, which will have to be done after R&D has progressed and better optimization done. What should be the US part?

D. Lissauer, BNL. 26 Conclusions –Tracker Upgrade is a complex technical problem. –The R&D plan needs significant effort – in many areas. –An ATLAS wide collaboration will need to be established for the execution of the project. –U.S. should plan a significant role in the ATLAS Tracker upgrade. –With ATLAS detector still not completed and installed. Preparations for Physics on going we need to find the right balance for this effort.

D. Lissauer, BNL. 27 ATLAS