Reduction in losses incurred in power distribution.

Slides:



Advertisements
Similar presentations
Partnerships in Power Franchisees
Advertisements

Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
17 th UPDEA CONGRESS IMPROVEMENT IN THE MANAGEMENT OF ELECTRICAL INFRASTRUCTURES FOR A BETTER PERFORMANCE OF AFRICAN POWER UTILITIES By Mr. Cheikh KA (SENELEC,
EESE O&E Committee Update & Next Steps May 14, 2010.
Rebuild Massachusetts and PHEEP Energy Information Services Project Presentation to DCAM, EOEA, HUD January 4, 2006.
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
 Capacity Development; National Systems / Global Fund Summary of the implementation capacities for National Programs and Global Fund Grants For HIV /TB.
Who is NEMA? NEMA is the association of electrical equipment and medical imaging manufacturers, founded in 1926 and headquartered in Arlington, Virginia.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
©2002, Pearson Education Canada 1.1 c h a p t e r 1 1 MANAGING THE DIGITAL FIRM: CANADA AND BEYOND CANADA AND BEYOND.
1 Methodology for customer relationship management Author : Ricardo Chalmeta From : The Journal of Systems and Software (2006) Report : Yu-Juan Chiu Date.
Introduction to Business Information Systems Data and Information.
WEST AFRICAN POWER INDUSTRY CONVENTION(WAPIC) AND METRING,BILLING AND CRM/CIS CONFERENCE ABUJA JUNE 2004 The Reform Relay.
HDA’s revised strategic direction and Annual Performance Plan 2013/14 March 2013.
PERFORMANCE AUDIT REPORT ON MANAGEMENT OF PRIMARY HEALTH CARE (A CASE STUDY ON HEALTH CENTERS) 8/16/20151 Dr. Anna Nswilla CDHSMoHSW.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
- FEDARENE - European Federation of Agencies and Regions for Energy and the Environment.
Article 5 of the Energy Services Directive Edward Green.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Presentation to Energy & Technology/Planning & Development Committees Considerations on Establishing Municipal Utilities Joint Informational Forum Legislative.
Eleventh Edition 1 Introduction to Information Systems Essentials for the Internetworked E-Business Enterprise Irwin/McGraw-Hill Copyright © 2002, The.
‘Developing the appraisal process in the wider context of the Sport and Fitness sector of Higher Education’. Welcome & Introductions.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Evaluation Assists with allocating resources what is working how things can work better.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Commissioning Self Analysis and Planning Exercise activity sheets.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
Monitoring as a key tool to improve energy policy & markets Cristina Cifuentes, Commissioner, ACCC/AER.
ROLE OF INFORMATION IN MANAGING EDUCATION Ensuring appropriate and relevant information is available when needed.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Low Voltage Smart Grid System Enables Near Real Time Energy Balancing as a Tool for Detecting and Managing Energy Losses Jan Olwagen Senior Engineer Utillabs.
Author name Country ID Session X – Block Y – Question Z Barcelona May Geographic information system (GIS) and their role in power utility.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
1 PILOT CASE: Installation of remote control systems for energy management in public buildings participating in “Championship” GRANOLLERS-LAG: Local Working.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
Northwest Power and Conservation Council 1 Distribution System Efficiency Potential & Conservation Voltage Reduction Power Committee April 2009.
1 SUB–THEME N°5: IMPROVED MANAGEMENT OF POWER INFRASTRUCTURE FOR BETTER PERFORMANCE OF AFRICAN POWER UTILITIES 17 th UPDEA CONGRES ( Union of Producers,
Local Intelligent Networks and Energy Active Regions in Flanders Carlo Mol - VITO.
2014 – 2015, a busy year 30 th September launch of 1 st Call 16 th December Programme approved by Commission Launch of 2 nd Call 5th January 1st Call.
“DEVELOPMENT OF A NATIONAL ICT POLICY ICT Policy in the ECTEL Member States Mr. Donnie Defreitas MSc, (Hav.), ECTEL Caribbean Internet Forum Bay Gardens.
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
International Seminar on Official Statistics : meeting Productivity and New Data Challenges Tianjin, China, October 2013 DAW Chaw Chaw Assistant.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Session 2: Developing a Comprehensive M&E Work Plan.
Energy Community Secretariat 1 25 th Customer Working Group Meeting ECS, Vienna 10 October 2013 CIRED C ONFERENCE 2013 R OUND T ABLE R EPORT Jasmina Trhulj.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Smart Grids and Meters Workshop November 2015 بسم الله الرحمن الرحيم Electricity Loss Sudan - Khartoum The Arab Union of Electricity (AUE) The Sudanese.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
Agriculture in Australia Agriculture in Australia utilises a large proportion of the country’s natural resources. Agricultural activity is undertaken on.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Governance, risk and ethics. 2 Section A: Governance and responsibility Section B: Internal control and review Section C: Identifying and assessing risk.
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Road Investment Decision Framework
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Donor Coordination Process
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
An-Najah National University
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
Organisational NRW Management
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Presentation transcript:

Reduction in losses incurred in power distribution

2 Introduction The key mission of the Distribution function is to purchase and sell electrical and gas power. This is accounted for on a monthly basis through purchases from electricity producers through the electricity conveyance network and sales to two categories of users:  Users, supplied under Medium Voltage (MV) regime and who billed on a monthly basis.  Users, supplied under Low Voltage (LV) regime, who billed on a quarterly basis. The quantities of power procured during a given month are not sold out. As a result, the control of energy losses is a daily challenge to be addressed. Introduction Formula for losses Short-term actions Loss components Long-term actions Conclusion Synchronous measurements  Implementation  Organisation  Means and accountability

3 Introduction This analysis seeks to: Gather knowledge on the origin of losses; Come up with actions to be taken to ensure reduction in such losses, for:  A better productivity of the distribution network as a whole;  The increase in the billing ratio;  A better control of investment decisions. Introduction Formula for losses Conclusion Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

4 The formula for losses Purchases For MV users For LV users Losses Sales Introduction Formula for losses Losses = Purchases - Sales Losses Rate of losses = Purchases Conclusion Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

5 The formula for losses Introduction Formula for losses Conclusion Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

6 Loss components Technical losses MV technical losses (lines+transformers) (L MV ) LV technical lossess (L LV ) Technical losses to due exchanges (L Transit ) Losses due to the gap between purchases and sales Energy fraud or theft Level of management quality (Lmanagement) Non-technical losses: Loss components Introduction Formula for losses Conclusion Other actions Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

7 Actions to undertake Introduction Formula for losses Enforcement of daily management rules and procedures by the various stakeholders, Monitoring, control and reporting on management actions Actions to be undertaken must revolve around two (2) key thrusts: Conclusion Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

8 Purchase control Sales control Daily actions Short-term actions Perform the monthly adversarial recording of meter readings at the level of MV/LV stations, Read the meter at the upstream MV feeder, Record the inter DD and inter agency exchange points Ensure the smooth functioning of meters; Ensure reliable meter reading; Process reported cases efficiently; Set up anti-fraud brigades; Secure facilities; Process with diligence claims concerning meter-reading /billing. Sum up actions to be undertaken; Facilitate the implementation of the short and medium term action plan; Prioritise actions that help optimise results. Introduction Formula for losses Conclusion Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

9 Introduction Conclusion Synchronous measurement Why synchronous? The reading (PD substations and users) is performed concurrently, that is simultaneously Formula for losses Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

10 Synchronous measurement Introduction Conclusion Splitting Distribution Directorates (DDs) into regions : North, Highlands and South; Splitting DDs into rural or urban localities; Listing the number of substations per DD and determine each DD’s weight ; Determine the number of substations or feeders which will be measured. The implementation strategy involves: Formula for losses Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

11 Synchronous measurement Introduction Conclusion Once the sample determined by the heads of the Distribution Directorate, the reading campaign can be launched. Action 1 Install meters on the outlet of PD substation transformers and consider them as « virtual Medium Voltage users ». One may thus compare the energy recorded by the feeder meter with the sums of energy recorded on the meters for all MV users and potential MV users. Action 2 Install meters on the outlet of PD substation transformers. We will thus be able to find out “the procurement by the substation”. To compare the energy recorded by the meter(s) of the substation with the sum of energy recorded on the meters for all LV users. Formula for losses Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

12 Organisation of synchronous measures HV/MV substation E MV Station PD Substation Joint substation E1E3E4En MV Station E2 Identify the problematic switchyard (the most disrupted) Energy E = ∑ of energies (En)+technical and non-technical MV losses Compute the consumption of these substations for the month (∑En); Feeder 3Feeder 4Feeder 1Feeder 2 List the substations linked to the targeted feeder Install the meter downstream of the MV/LV transformer for at least one month (Winter and Summer time); Perform the first reading on the fist day of the month for all the substations linked to this feeder; Perform the last reading on the last day of the month for all the stations linked to this feeder; Record the index of the totalizing meter (E); Assess the MV losses

13 Synchronous measurements PD substation (MV/LV) E3e1 E3= ∑ ei E3=LV Sales + Losses LV Technical + Losses LV non-technical eie2e4 Feeder 2 Problematic feeder Introduction Conclusion Categorise abnormalities noted (management, fraud, …); Quantify the energy lost per category (using the specific consumption of the sample); Assess the energy to make up for Formula for losses Short-term actions Loss components Synchronous measurements  Implementation  Organisation  Means and accountability Long-term actions

14 Synchronous measurements Introduction Conclusion SDx DCM DD Commercial Agency Decision-making Work coordination company- wide Supervision of works in the field (1 st entity in charge) Monitoring and collection of data ensuing from the measurement campaign For a successful campaign of synchronous measures conducted within each Distribution company, one should have all the required (human, logistic…) resources. Formula for losses Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

15 Long-term actions Introduction Conclusion Upgrading of the electricity distribution network to:  Ensure the accuracy of measurements (decrease in human interventions through the dematerialization of the reading process);  Identify reading problems (remote surveillance of meters);  Reduce the rate of losses incurred by Distribution Directorates;  Improve services provided to customers;  Control inter-utility, inter-Distribution Directorate and inter- commercial agency exchange flows;  Put in place a measurement system for all public distribution stations;  Develop services provided to customers (reviews and studies) Remote reading MV remote reading LV remote reading Objectives for 2013 Objectives for 2016 Formula for losses Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

16 Long-term actions Introduction Conclusion The active participation in meetings planned by local authorities (town planning, infrastructure and housing development, land selection, etc.…); The holding of meetings with (neighbourhood, professional associations…) and local authorities depending on the problem to be solved (fraud, safety, energy control, etc.…). Other actions An effective action plan requires notably the implementation of a communication plan at the level of each Distribution Directorate and this must translated into: Formula for losses Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability

17 Conclusion Introduction Conclusion The losses of distributed and unaccounted for power can impact the financial profitability of Distribution utilities and service quality. It is relevant therefore to measure on an ongoing basis the indicators identified in the measurement analyses undertaken. Formula for losses Short-term actions Loss components Synchronous measurements Long-term actions  Implementation  Organisation  Means and accountability