CERN LBNE Test Experiment. Plan view of Bat 887 2.

Slides:



Advertisements
Similar presentations
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Advertisements

LBNE Reconfiguration Jim Strait, LBNE Project Director Fermilab Community Advisory Board August 23, 2012.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
New results from the CHORUS Neutrino Oscillation Experiment Pasquale Migliozzi CERN XXIX International Conference on High Energy Physics UBC, Vancouver,
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Burst noise investigation for cryogenic GW detector TITECH NAOJ Daisuke TATSUMI 2nd Symposium ‐ New Development in Astrophysics through Multi-messenger.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Kansas Tobacco Prevention for Specific Populations.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Template for DUSEL Meeting with Potential Experiments.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Laser Calibration of a Liquid Argon TPC G. Sinnis J. Danielson W. Sondheim.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
LBNF CAD models, Drawings and Component list
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
SBN Far Detector Installation & Integration
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Tanzania JAS: Proposed work program for Joint Analysis /Programming
INSTALLATION SEQUENCE
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Opening Executive Session M.C.
IHEP group Shashlyk activity towards TDR
Warm structure requirements :
Pressure vs height (solid CPA plane)
ALICE Offline Week, CERN
The DBD: Outline and Scope
Chris Smith California Institute of Technology EPS Conference 2003
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
Test Beamline System Requirements and Charge to PDR Committee
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
DS20k Integration Workshop
Presentation transcript:

CERN LBNE Test Experiment

Plan view of Bat 887 2

Side section view Bat 887 3

End section view Bat 887 4

Initial Layout In the WA105 cryostat

Possible Configuration 2 APA 4 CPA 2.5m drift to limit space charge >5m active length Sample charge at different drift distances

Bat 887 layout m clearance from top of containment vessel to hook height 12.4 m 9.5 m 7.35 m Bridge crane and hook height Containment vessel and cryostat Pit A 5 m from working surface Crane bridge is offset 45° from the walls of the cryostat Roof truss work 14.2 m

Moving CPA over Cryostat and rotation 9 Assume that there are 2 lifting devices from the crane bridge and they can be operated at the same time to rotate the TPC planes. The planes would be lifted on edge horizontally over the cryostat. One lifting device would be lowered while the other is stationary to perform the rotation of the object.

Sample Timeline CERN MTP approved June 2014 Building architectural design available June 2014 Start Construction of NA Hall extension Jan 2015 Beneficial Occupancy of Experimental Hall January 2016 Outfitting of the Hall, Construction of the cryostat and cryogenics Jan2016-Jan 2017 Install Spring 2017 Run 2017 (These are physicist numbers and prone to delay!)

Detector Development Goals Cold test a full scale TPC cell. – Demonstrate reliable operation of the pre- production TPC elements Demonstrate that the calibration measurements and analysis can achieve the required accuracy. Measure calibration data to be used to model the final detector performance

Detector Development Goals Demonstrate the implementation of an external pump configuration. – Demonstrate operation – Achieve safety Buy-In (FNAL) Prepare safety support for final detector Demonstrate operation with cold Ullage and improved electronegative contamination mitigation

Detector development Goals Validate the vibration isolation strategy for use in the final detector. – Both Pump and mechanical support related

Far Detector Calibration Measure the performance of the detector with charged particles of known type and energy. Measure the shower parameters for hadronic and electromagnetic showers. This should be used to define the shower reconstruction precision. Determine how the digitization and reconstruction depends on energy deposition, drift distance, and contaminations.

NEXT STEPS

Discussion with Marzio Nessi at Neutrino 2014 Next step is the drafting of an Expression of Interest – This should be presented to the CERN SPSC (SPS and PS experiments Committee) – The next meeting is Tuesday 21 and Wednesday 22 October – For this to happen a draft should be shown at the next collaboration meeting. Draft by July 30 th

Content of the EOI Summary of the goals of the experiment – Refine the goals listed last talk – Include the energy and particle type plots from Jon – Include the figures of the TPC inside the Cryostat. Additional documents needed: – Requirements for the cryostat – ???

Plan of Action? Need to decide on a starting configuration. I will write a few page draft of the goals and a goals document. Need to solicit input from Tom and Jon on the Goals! Jack will draft a 2 page configuration document? David/Jack will draft the cryostat requirements document? Need from Tom/Jon some estimate of needed event samples?

Big open questions Do we need to rotate the detector in the cryostat? How to approach the LArIAT collaboration? – Joint effort? LBNE experiment?

MOU preparation First step is to list what we need from CERN and what we will provide to the experiment. – Propose I, David, Jack and Christos try to do this in parallel and present this at the next meeting. The template for the MOU is at: –

MOU MOU is almost all boiler plate. We need to provide text for 5 ANEXES (Appendices) ANNEXES Annex 1:List of the Sub-units (systems) and/or deliverables provided by participating institutes Annex 2:Organization and Management structure of the Collaboration and persons currently holding management positions Annex 3:List of Institutes, Funding Agencies and Representatives Annex 4:Value of deliverables, grouped by Funding Agency and/or sub-units (systems) and payment profile Annex 5:Work Schedule and Project Milestones MOU also calls for the appointment of a Team Leader – With our proposed organization this will be Christos

Comments from Marzio The EOI is much more important than the MOU. We can work with him to produce the MOU in a day. – Probably assumes we have all the inputs. CERN can at some level operate with a DRAFT MOU initially – Need to understand this a bit.