Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Structure of DNA and Proposed Sustainable Development Criteria for CDM Projects In Bangladesh CDM Designated National Authority (DNA) Durbar Conference.
The Global Carbon Market: Where the sky is the limit.
The Sustainable Carbon Credit Originator We are an international company that originates high quality carbon credits by initiating, developing or.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
CDM and SSN: A winning combination. SSN and CDM Creating partnerships between South, South and North countries through the opportunity of the Clean Development.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE Date: 8-9 April, 2008 Venue: LGED Bhaban, Dhaka Presented.
JBIC’s New Operation for Environmental Projects “GREEN” Takahiro Hosojima Chief-representative in Rio de Janeiro Japan Bank for International Cooperation.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Orientation Workshop on March 25 th – 26 th, 2004.
What Goes Into a Good PIN and a PCF Project? PCF Training Workshop on Project Formulation under the Clean Development Mechanism Hanoi, Vietnam September.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Project Development Guidelines and CDM Activities in Pakistan
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
The Danish CDM Project Development Facility Financing CDM in Indonesia Erik Dugstad, Sr. Economist, ECON Analysis Agus Sari, Climate change specialist,
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Presentation to RGGI Stakeholder Group September 21, 2005.
CPI Energy Phils., Inc. 39 San Miguel Avenue, 17th Floor One Magnificent Mile Bldg. Ortigas Center, Pasig City 1605 Metro Manila, Philippines Tel. +63.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January Capacity Development for CDM Second National Workshop.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Preparation and review of the Project 1. Project ideas reviewed by PCF 2. PCN prepared by project sponsor 3. Host country endorsement sought 4. Further.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
What JCF observed in its
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
CDM Activity Cycle under the Marrakech Accords
Presentation transcript:

Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005

Development Alternatives 2 MITIGATION OPTIONS IN THE ENERGY SECTOR IDENTIFIED ARE :  Improvements in energy efficiency through upgrading currently employed technologies  Introduction of advanced technologies that are more efficient  Use of renewable energy sources wherever feasible to bring down the carbon content of the grid, to provide sustainable energy, and as a decentralised energy source at remote areas

Development Alternatives 3 MITIGATION POTENTIAL Greenhouse Gas Mitigation OptionsMitigationPotential (million tons) Long-term Marginal Cost ($/ton of carbon equivalent) Carbon Demand-side energy efficiency Supply-side energy efficiency Electricity transmission and distribution Renewable electricity technologies Fuel switching (gas for coal)85-20 Forestry Methane Enhanced cattle feed Anaerobic manure digesters Low methane rice varietiesmarginal5-20 Cultivation practicesmarginal0-20 Nitrous Oxide Improved fertilizer applicationmarginal0-20 Nitrification inhibitorsmarginal20-40 Source: Based on modeling exercises reported in Rana, A. and Shukla, P.R. (2001), Ghosh et al. (2001); Garg A. Shukla, P.R. (2002), and ALGAS (1998)

Development Alternatives 4 What is CDM Developed Country Total GHG Emissions } Emissions to be reduced Developing Country Total GHG Emissions No emission reduction commitments Investments Carbon Credits

Development Alternatives 5 CDM PROJECT ELIGIBILITY Such activities should be  Approved by the Govts. of the participating Parties  be host country driven  May involve private / or public entity  Environmental integrity is a must  Economic efficiency for cost effectiveness  Equity Implementation of such projects should result in social, environmental, economic and technological well-being - the four pillars of sustainable development

Development Alternatives 6 Types of CDM Projects Energy  Renewables: Wind, solar, hydro, biomass, geothermal  Power Generation: Combined Cycle turbines, clean coal technology  Fuel Switching: Natural Gas, methane, biomass & biogas  Co-generation: Sugarcane, chemical processes

Development Alternatives 7 Types of CDM Projects Industry  Efficiency: Boilers. Motors, lighting  Cogeneration-chemical, metellurgy, paper  Retrofits  Production Process  Waste Fuel Recovery – including landfills

Development Alternatives 8 PROJECT CONCEPTUALIZATION IDENTIFICATION AND ORGANIZATION TARGET BENEFICIARIES AND NETWORKING PARTICIPATORY PROJECT DEVELOPMENT -identify stakeholder, position, interest expected argument -choose appropriate technologies PROJECT FUND SOURCING / FINANCING PROJECT PLANNING -integrating sustainable development goals of the region / site specific PROJECT IMPLEMENTATION -an agreed time frame -an agreed monitoring and verification arrangement; the organization to monitor -establish emission baseline PERIODIC MONITORING AND EVALUATION -emission reduction PROJECT CYCLE

CDM PROJECT CYCLE Project Idea Note (PIN) / Project Concept Note (PCN) Host / Investor approval PDD Validation Registration Monitoring Financing & Implementation VerificationCertification DNA; Investor PD/CCC OE EB PD OE EB Participation EIA Baseline & ER M&V Plan On-site Inspection Review Monitoring GHG Reductions Verification Report PD/CCC Implementin g Agencies Baseline & Additionality M&V Plan EIA St. Consul Contracts 9

Development Alternatives 10 CDM PROJECTS Some Important Aspects  Participation is voluntary, approved by each party involved  Additional to any that would occur in the absence of certified project activity  Project fulfills the criteria of financial additionality  Reduction of emissions should be real, measurable and should have long time benefits  Project should contribute to the sustainable development of the host country

Development Alternatives 11 CDM PROJECT CYCLE Project Idea Note (PIN) / Project Concept Note (PCN) Host / Investor approval DNA; Investor PD/CCC Implementin g Agencies

Development Alternatives 12 PIN/PCN  Name of the project  Ownership details of project sponsors  Project Description  Status of Project Clearances  Financing details of the projects  Total CDM contribution sought  IRR and DSCR with & without CDM revenue  Estimate of GHG abetment  Sustainable development criteria  Project Risks

Development Alternatives 13 CDM PROJECT CYCLE Project Idea Note (PIN) / Project Concept Note (PCN) Host / Investor approval PDD DNA; Investor PD/CCC Implementin g Agencies Baseline & Additionality M&V Plan EIA St. Consul Contracts

Development Alternatives 14 PROJECT DESIGN DOCUMENT  Project Description  Promoter Details  Baseline  Additionality  Sustainable Development Criteria  Monitoring Plan  Financial Status

Development Alternatives 15 CDM PROJECT CYCLE Project Idea Note (PIN) / Project Concept Note (PCN) Host / Investor approval PDD Validation Registration DNA; Investor PD/CCC OE EB Participation EIA Baseline & ER M&V Plan PD/CCC Implementin g Agencies Baseline & Additionality M&V Plan EIA St. Consul Contracts

Development Alternatives 16 Validation of CDM Projects  Validation is a process of independent evaluation of a project activity by a designated Operational Entity (OE) against the requirements of the CDM on the basis of the PDD. Registration  Registration is the formal acceptance of a validated project as a CDM project by the Executive Board.  Registration is the prerequisite for verification, certification and issuance of the CERs

Development Alternatives 17 CDM PROJECT CYCLE Project Idea Note (PIN) / Project Concept Note (PCN) Host / Investor approval PDD Validation Registration Monitoring Financing & Implementation DNA; Investor PD/CCC OE EB PD Participation EIA Baseline & ER M&V Plan PD/CCC Implementin g Agencies Baseline & Additionality M&V Plan EIA St. Consul Contracts

Development Alternatives 18 MONITORING  Project Participants, as part of the PDD provide a monitoring plan:  Based on previously approved methodology/new methodology  Determined by DoE as appropriate to circumstances of the project activity  Reflects good monitoring practice  A monitoring report in accordance with monitoring plan is to be submitted to the DoE for verification

Development Alternatives 19 CDM PROJECT CYCLE Project Idea Note (PIN) / Project Concept Note (PCN) Host / Investor approval PDD Validation Registration Monitoring Financing & Implementation VerificationCertification DNA; Investor PD/CCC OE EB PD OE EB Participation EIA Baseline & ER M&V Plan On-site Inspection Review Monitoring GHG Reductions Verification Report PD/CCC Implementin g Agencies Baseline & Additionality M&V Plan EIA St. Consul Contracts

Development Alternatives 20 Verification  Verification is the periodic independent review and determination by DoE of the monitored reductions by sources of greenhouse gases that have occurred as a result of the CDM project activity Certification  Certification is the written assurance by the DoE that the project activity achieved the reductions in anthropogenic emissions by sources of GHGs as verified

Development Alternatives 21 ISSUANCE OF CERTIFIED EMISSION REDUCTIONS  Certification Report constitutes request to EB for issuance of CERs equal to verified amount of reductions of GHGs

Development Alternatives 22 MINIMUM TRANSACTION COST ASSOCIATED WITH CDM PROJECT CYCLE CDM project cycle stages where costs are incurred Cost Estimates (Rupees) Pre-operational phase design PIN/PDD Preparation6 lakhs Validation (to be paid to DOE)4-10 lakhs* Registration (to be paid to CDM EB) 2.25 – 7.5 lakhs* Operational phase Monitoring & Verification (to be paid to DOE) 10 lakhs * Certification (to be paid to CDM EB) 2% of the CER value Risk mitigation1% - 3% of CER value

Development Alternatives 23 Bundling  Effective way to reduce transaction costs  Several projects bundled together to share transaction costs and CER benefits  Projects should have:  Similar technology  Be in the same geographical area  Preferably have the same project owner, but not necessary

Development Alternatives 24