Venus Observations Flight Readiness Review Delta FRR (HST Program 12433) 19 January 2011.

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

Superior Solar Conjunction Planning May 8, 2014 Dan Ossing STEREO Mission Operations Manager (240)
1 Winter Launch Block Modeling and Results MMS Flight Dynamics Team MIWG 8 Feb. 20, 2014.
Two-Gyro Performance: Scheduling and Acquisitions Merle Reinhart.
Chandra User’s Committee Meeting (6/27/04) P. Slane (Chandra Mission Planning) Constrained and Coordinated Observations Chandra Mission Planning Response.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
IMPACT Report SSMO Receiving Review– January 23, 2007.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 2: Managing Hardware Devices.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
Backup and Recovery Part 1.
Feb. 25, How the Rest of Hubble works (some of it, anyway) Computers and Communications.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
FRR: Venus Proposal P. 1October 16, 2013 Flight Readiness Review (FRR): Venus Proposal October 16, 2013.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
An Overview of the Recent HST Safings An Overview of the Recent HST Safings Ken Sembach TIPS Presentation September 20, 2007.
Venus Observations Flight Readiness Review (HST Program 8659) 21 January 2003 Post-FRR release – 24 Jan 2003.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
Module 9 Planning a Disaster Recovery Solution. Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server.
Windows Vista Inside Out Chapter 22 - Monitoring System Activities with Event Viewer Last modified am.
1 Description and Benefits of JWST Commanding Operations Concept TIPS/JIM Meeting 17 July 2003 Vicki Balzano.
IES Flight Software J. Hanley / P. Mokashi May 29, 2013.
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
Computer Emergency Notification System (CENS)
Servicing Mission 4 ObservatoryOperationsSupport ObservatoryOperationsSupport June ’08 MSR Chris Long.
Implementation of Travel Time in the CHART ATMS ITS America Annual Conference May 3, 2010 Scott Dalrymple.
1 SMOV Proposal Process Initial Submission through Flight George Chapman Merle Reinhart Tony Roman February 21, 2001.
Two-Gyro Science Impact and Observer Information Ken Sembach STUC Meeting 18-November November-2004.
Venus Observing Program History v In 1991, GO 2393 (PI: Bertaux) proposed to observe Mars and Venus with GHRS and was approved by the TAC, but the Venus.
STARDUST 20 Nov 2003CERR - Charles Love1 of 7 STARDUST Project CRITICAL EVENTS READINESS REVIEW COMET P/WILD 2 ENCOUNTER ISA Status Charles Love JPL:
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Two-Gyro All-sky Scheduling Study TIPS April 15, 2004
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
NERC Lessons Learned Summary LLs Published in September 2015.
Venus Observations Flight Readiness Review (HST Program 12433) 22 December 2010.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Jan 2008 LMSSC - 1 SWEA Plume Impingements Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
NICMOS Suspend Event STB 632 “MECH_2_MAX_RETRIES_EXCEEDED” 2008/069.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
NERC Published Lessons Learned Summary
GLAST Large Area Telescope:
MODIS Instrument Operations Team (IOT): Bryan Breen & Tony Salerno
SDO Flight Dynamics Subsystem
Launch and On-orbit Checkout
STScI Ground System Development Status:
<Your Team # > Your Team Name Here
Presentation transcript:

Venus Observations Flight Readiness Review Delta FRR (HST Program 12433) 19 January 2011

2010/2011 Venus Observation P Jan 2011 ¤Changes are in blue ¤Changed pages are: 3,10-12,16,25-27,48-57, 64 Changed Pages

2010/2011 Venus Observation P Jan Venus ObservationTony Roman Merle Reinhart 2.0 FSW, S/C H/W Changes and Implementation Brian Vreeland 2.1FSW and/or S/C H/W Functional Changes 2.2FSW Software Structure/Resource Changes 2.3Supporting Ground System Changes 2.4Supporting Documentation Changes 2.5Release Messages 2.6Unit and Build Level Testing/Results 2.7System Level Testing/Results 3.0Engineering Test / Installation 3.1Overview and Initial ConditionsBen Teasdel 3.2Script ReviewBen Teasdel 3.3Standalone Testing Mike Wenz / Steve Arslanian 3.4Timeline ReviewBen Teasdel 3.5MEGGBen Teasdel Changed Pages

2010/2011 Venus Observation P Jan 2011 Agenda 4.0 Monitoring and System Impacts Wayne Burdick 4.1On-orbit Validation / Monitoring 4.2System Impacts 4.3Supporting Operations Changes 4.4Supporting PRD Changes 4.5Training Module Changes 5.0 Constraints and Restrictions Review Wayne Burdick 5.1CARD 5.2OLD 6.0 Contingency Planning Wayne Burdick 6.1 Vehicle Contingencies 6.2Other Contingencies 7.0 Engineering Support RequirementsWayne Burdick 7.1Personnel 7.2Communications / Data 7.3CCS 8.0 Liens / IssuesWayne Burdick 9.0 Forward PlanWayne Burdick 10.0 ActionsWayne Burdick

2010/2011 Venus Observation P Jan 2011 Engineering Team STScI - Tony Roman, Merle Reinhart, Alan Welty, Charles Proffitt OTA - Mike Wenz, Dennis Crain, Art Bradley DMS / I&C– Ben Teasdel and Jessica Regalado FSW – Brian Vreeland, Norm Roy, Shirley Duhaney, Suzanne Benedict, Susan Lien, Vicki van Duyl, Anthony Wells, Clive Caldwell, Linda Mitchell Payload FSW - Dennis Garland PCS – Dave Murphy EPS – Stan Krol SI – Scott Swain, Steve Arslanian Thermal – Josh Abel Safing – Ed Moy Operations – Lynn Bassford, Joe Cooper Systems Management – Wayne Burdick

2010/2011 Venus Observation P Jan 2011 Objectives & Overview Explain Venus observing strategy. Review areas of special concern with Venus observations and explain how these concerns are being addressed. Determine if the implementation is correct and complete. Why is Venus Special ? At its farthest, Venus gets to be about 47 degrees from the Sun. HST is normally not permitted to point within 50 degrees of the Sun.

2010/2011 Venus Observation P Jan 2011 Venus Observing Program History In 1995, HST observed Venus with GHRS and WFPC2 (GO 4518 and GO 5783). In 1996, two GO Venus proposals (6607 and 6771) were approved by the TAC; and there was one GTO/WF2 program (6851) to observe Venus. All of these were cancelled by the STScI Director shortly after phase 2 submission. In 1997, there was a GTO/STIS program (7581) to observe Venus. Much implementation work was done, but the program was then withdrawn by the PI. In 2003, HST observed Venus with STIS (GO 8659). NASA program is now planned for: December 27-28, 2010 ( ) January 22, 2011 January 27, 2011

2010/2011 Venus Observation P Jan 2011 Goals & Strategies Scientific Goals Coordinated observing with ESA’s Venus Express mission. Map variations in SO 2, SO, S 2, and other UV absorbers. Constrain models of Venus atmosphere and climate evolution Observing Strategy Observe while Venus is near maximum elongation Observe while HST is in Earth’s shadow A window of 9-14 minutes per orbit Three visits of 2 orbits each. Originally to have also been coordinated with Atkatsuki mission, but that spacecraft failed to achieve Venus orbit

2010/2011 Venus Observation P Jan 2011 Target Visibility GS Pair Acq at Venus+5D Slew to Venus Target Visibility Shadow GS Pair Acq at Venus+5D Observing Strategy Details Initial GS Acq at Venus+5D A pointing 5.5 degrees from Venus and 51.6 degrees from the Sun. Minimizes slew distance to Venus Precautionary measure to protect against large pointing error after slew Observe Venus Slew to Venus +5D Single GS Acq at Venus OBAD Target Visibility Slew to Venus Shadow GS Pair Acq at Venus+5D Observe Venus Slew to Venus +5D Single GS Acq at Venus OBAD

2010/2011 Venus Observation P Jan 2011 Target Visibility GS Pair Acq at Venus+5D Slew to Venus Target Visibility Shadow GS Pair Acq at Venus+5D Observing Strategy Details Single GS Acq at Venus Saves about a minute versus pair acquisition Venus science observation Visit 01: two 153s exposures, Visit 02: two 58s exposures, Visit 03: 116s and 2.5s exposures STIS auto wave cal disabled Observe Venus Slew to Venus +5D Single GS Acq at Venus OBAD Target Visibility Slew to Venus Shadow GS Pair Acq at Venus+5D Observe Venus Slew to Venus +5D Single GS Acq at Venus OBAD

2010/2011 Venus Observation P Jan 2011 Venus Appearance at Observation Apparent magnitude: /- 0.2 Surface brightness: +1.5 (average for 1 square arcsecond of illuminated portion of disk) Apparent diameter Visit 1: 28.5 arcseconds Visit 2: 21.4 arcseconds Visit 3: 20.4 arcseconds Phase angle Visit 1: 97.3 degrees Visit 2: 89.9 degrees Visit 3: 79.4 degrees

2010/2011 Venus Observation P Jan 2011 Vital Statistics Observation Science Exposure Time Angle to Sun Limb (degrees) Sunlit Time inside SAZ While Slewing Away from Venus Guide Star January s per orbit 46.32m 20s January s46.02m 30s Dec 28, 2010 orbit 1153s46.22m 14s (after GS time adjust) S in FGS1 on centerline Dec 28, 2010 orbit 2153s46.23m 2s (after GS time adjust) S in FGS1 ~50” from centerline Jan 22, 2011 orbit 158s46.11m 57sS8OF in FGS1 12” from centerline Jan 22, 2011 orbit 258s46.11m 50sS8OF in FGS1 on centerline Jan 27, 2011 orbit 1116s45.73m 12sS8L in FGS1 20” from centerline Jan 27, 2011 orbit 22.5s45.73m 2sS8L in FGS2 42” from centerline

2010/2011 Venus Observation P Jan 2011 Areas of Concern Guide star acquisition failure Spacecraft or instrument problem shortly before scheduled observing time FGS exposure to Venus HST being exposed to sunlight while pointed within the Solar Avoidance Zone (SAZ) HST safing while pointed within the SAZ

2010/2011 Venus Observation P Jan 2011 Guide Star Acquisition Failure Concern If attitude error is greater than the search radius, the guide star acquisition could fail resulting in the loss of the science. Precautions The chances are minimized by the short 5 degree slew to Venus. Too late to perform guide star acquisition test. Stars are in solar avoidance zone. Science exposures will proceed even if GS acquisition fails. Special commanding specified to ignore “take data” flag. AQEXPIRE timer adjusted via SMS edit. Detector is protected because HST is in shadow CCD is utilized for observation

2010/2011 Venus Observation P Jan 2011 Problem Shortly Before Observation Concern An unrelated problem may threaten the Venus observing window. In 1995, the Venus observation was originally lost due to an unrelated safing; but it was quickly replanned and executed successfully. The 2003 Venus observations were delayed from 2001 due to the failure of the STIS side 1 electronics. Remedy Second choice coordination opportunity with Venus Express on January 23, 2011

2010/2011 Venus Observation P Jan 2011 FGS Exposure To Venus Concern If the attitude error is large enough (> 300 arcseconds), an FGS could possibly see Venus and cause potential bright light exposure to the FGS photo-multiplier tubes. Precautions Choose a guide star that is as far as possible from Venus. The chosen guide stars are: »Visit 01 : magnitude 12.4 and 15.5 arcminutes from Venus. »Visit 02 : magnitude 11.7 and 16.8 arcminutes from Venus. »Visit 03 : Orbit 1: magnitude 11.2 and 13.8 arcminutes from Venus. Orbit 2: magnitude 11.5 and 12.5 arcminutes from Venus.

2010/2011 Venus Observation P Jan 2011 FGS Exposure To Venus FGS PMT can tolerate and return to normal performance. Goodrich assessed PMT damage should a worst-case event occur resulting in an attempted acquisition of Venus with an FGS (ref: Goodrich Memo A16-ST-2254) Goodrich reports the short-term effect of the Venus acquisition would be the temporary incapacitation of the PMTs due to dark count elevation. While the exact value is not available for the given intensity, literature quotes range from several to 48 hours for recovery (for any target). Goodrich performed a relative assessment of the long-term effects of Coulomb draw (charge depletion) while attempting to acquire Venus with an FGS. While it is hard to determine exactly how the FGS would behave if it attempted to perform an acquisition on Venus, depending on how long it spends with Venus in the FOV, you could see a decrease in reliability from 1-3%.

2010/2011 Venus Observation P Jan 2011 HST FOV – Visit 01

2010/2011 Venus Observation P Jan 2011 HST FOV – Visit 02

2010/2011 Venus Observation P Jan 2011 HST FOV – Visit 03 Orbit 1

2010/2011 Venus Observation P Jan 2011 HST FOV – Visit 03 Orbit 2

2010/2011 Venus Observation P Jan 2011 HST in the Sun Concern While slewing away from Venus, HST will be exposed to sunlight and pointed inside the SAZ for up to 3m 2s. HST’s maximum previous exposure to sunlight while pointed inside the SAZ was 2m 30s (2003 observation). Pointing inside the SAZ while HST is in sunlight can be tolerated for at least 15 minutes before the temperature of the paint inside the OTA would become a contamination issue. (EM-MOSES-1267 and EM-MOSES-1268) TCS has analyzed limits and has confirmed duration can be tolerated. Precautions Guide star search radius was reduced in order to save seconds of acquisition time.

2010/2011 Venus Observation P Jan 2011 HST Safing Concern HST must not enter inertial hold safe mode while pointed within the SAZ. Precautions Modifying the inertial hold safe mode response such that any condition that would normally lead to inertial hold without closing the AD leads to software sun point safe mode instead. This was done in both prior HST observations of Venus.

2010/2011 Venus Observation P Jan Venus Observations GSACQ Adjustments Merle Reinhart

2010/2011 Venus Observation P Jan 2011 GSACQ Adjustments ¤Idea is to compress the time allowed for the single-star GSACQs to minimize the time in sunlight within 50° of the sun and/or provide more science exposing time. ¤Obvious places for a time compression are Spiral Search time Move back to the target attitude (GS Offset via #43 command) ¤STIS will ignore the TDF via special commanding. Thus, need to ensure if the GSACQ fails, that we are back at the target attitude for the science exposure. This implies a reasonable setting of the AQEXPIRE timer in the SMS call to the GSACQ PLCP. ¤The AQEXPIRE changes are done as an SMS Edit. If edit were to not occur, the only effect would be if the GSACQ failed, the spacecraft would not be maneuvered back to the target position prior to the initiation of the Track51 for the exposure.

2010/2011 Venus Observation P Jan 2011 GSACQ Time Reduction Specifics – Jan 22 Visit ¤Orbit #1 OBAD with Trackers 2 & 3 immediately prior to single-star gsacq Assumed error after the OBAD at the start of the gsacq is 20” »Time for spiral search = 32s (-40s) At the target position, the guide star is 12” from the pickle centerline »Time for 32” decenterline maneuver = 36s (-19s) Time for AQEXPIRE to fire and complete is 39s »31s for maneuver + 8s for other overheads Final GSACQ time = 344s + (-40s + -19s + 39s) = 324s AQEXPIRE value = 324s – 39s – 3s = 282s ¤Orbit #2 OBAD with Trackers 2 & 3 immediately prior to single-star gsacq Assumed error after the OBAD at the start of the gsacq is 20” »Time for spiral search = 32s (-40s) At the target position, the guide star is <1” from the pickle centerline »Time for 21” decenterline maneuver = 32s (-23s) Time for AQEXPIRE to fire and complete is 35s »27s for maneuver + 8s for other overheads Final GSACQ time = 344s + (-40s + -23s + 35s) = 316s AQEXPIRE value = 316s – 35s – 3s = 278s

2010/2011 Venus Observation P Jan 2011 GSACQ Time Reduction Specifics – Jan 27 Visit ¤Orbit #1 OBAD with Trackers 1 & 2 immediately prior to single-star gsacq Assumed error after the OBAD at the start of the gsacq is 20” »Time for spiral search = 32s (-40s) At the target position, the guide star is 20” from the pickle centerline »Time for 41” decenterline maneuver = 39s (-16s) Time for AQEXPIRE to fire and complete is 43s »35s for maneuver + 8s for other overheads Final GSACQ time = 344s + (-40s + -16s + 43s) = 331s AQEXPIRE value = 331s – 43s – 3s = 285s ¤Orbit #2 OBAD with Trackers 1 & 2 immediately prior to single-star gsacq Assumed error after the OBAD at the start of the gsacq is 20” »Time for spiral search = 32s (-40s) At the target position, the guide star is 42” from the pickle centerline »Time for 62” decenterline maneuver = 46s (-9s) Time for AQEXPIRE to fire and complete is 49s »41s for maneuver + 8s for other overheads Final GSACQ time = 344s + (-40s + -9s + 49s) = 344s AQEXPIRE value = 344s – 49s – 3s = 292s

2010/2011 Venus Observation P Jan FSW, S/C H/W Changes and Implementation FSW – Brian Vreeland

2010/2011 Venus Observation P Jan FSW, S/C H/W Changes and Implementation 2.1 FSW and/or S/C H/W Functional Changes Venus Observation SPC Macros (DCR 1552) Load File – QVENUS0_0.TAB Contains 2 Macros Activation Macro at SPC Address (Jump Table Addr 1) Perform BMIC management for the modified Tables Modify the Sunpoint Sun Cosine Limit from 46 to 42 degrees Modify six Safe Test Responses from Inertial Hold to Software Sunpoint (w/o Load Shed) SBREHE - High Mode Body Rate Error SSPCLEXE – SPC List Exhaust SBMICE - BMIC SEMBOPE - Earth-Moon Protection SMHGATCT - HGA Torque Limit SNELEAKE - Neon Leak tests Other Inertial Hold Test Responses Close AD in addition to IH and are not changed in macro SPSEAPSE - PSEA Power Supply Failure SSUNAPRE - Sun Aperture SSBOPE - Sun Bright Object Protection Thermally safe if Aperture door is closed and HST is at 46 degress

2010/2011 Venus Observation P Jan FSW, S/C H/W Changes and Implementation 2.1 FSW and/or S/C H/W Functional Changes (cont…) Restoration Macro at SPC Address (Jump Table Addr 2) Perform BMIC management for the modified Tables Restore the Sunpoint Sun Cosine Limit from 42 to 46 degrees Restores six Safe Test Responses from Software Sunpoint to Inertial Hold Installation and Usage Procedure “IP-219_Venus_Observation_Macros.docx” 3 Sections Load, Dump and Compare QVENUS0_0.TAB, to verify the load Execute the Activation Macro as required Execute Restoration Macro as required

2010/2011 Venus Observation P Jan FSW, S/C H/W Changes and Implementation 2.2 FSW Structure/Resource Changes – None 2.3 Supporting Ground System Changes - None 2.4 Supporting Documentation Changes - None 2.5 Release Messages SSM212 IP-219_Venus_Observation_Macros.docx PNM_ TXT 2.6 Unit and Build Level Testing/Results None Needed

2010/2011 Venus Observation P Jan FSW, S/C H/W Changes and Implementation 2.7 System Level Testing/Results Software Simulation Environment 8 FVS tests run to verify proper configuration after macro execution VENOBS1 – Venus Observation Test 1 - Nominal Case VENOBS2 – Venus Observation Test 2 - SPC List Exhaustion VENOBS3 – Venus Observation Test 3 - BMIC Failure VENOBS4 – Venus Observation Test 4 - High Body Rate Error VENOBS5 – Venus Observation Test 5 - Earth/Moon Protection Error VENOBS6 – Venus Observation Test 6 - HGA Torque Limit VENOBS7 – Venus Observation Test 7 - Sun Cosine Limit VENOBS8 – Venus Observation Test 8 - Neon Leak Case Verified that Software Sunpoint commanded versus Inertial Hold Hardware Test Environment Lab Configuration CCS / PRD O07300R1S PCSSIM 51A On-Orbit Patches Installed Gyro Installation Procedure Verification using VSSNOR and IP Completed in LMB

2010/2011 Venus Observation P Jan FSW, S/C H/W Changes and Implementation 2.8 H/W Interfaces Impact & Verification Matrix N/A 2.9 CPM2 & 3 Update Recommendation N/A

2010/2011 Venus Observation P Jan Engineering Test / Installation 3.1 Overview and Initial Conditions SSM486 Flight Software Version 3.4 or higher and currently executing in VSS with H-format programmable telemetry enabled 3.2 Script Review Section A – Load, dump, compare Venus Observation SPC Macro Table Load Load Venus Observation SPC Macro Table load (1 min) Dump the SPC table 1 (5 min) Compare the Venus Observation SPC Macros Table with the dump (1 min) Section B – Venus Observation Macro Activation Activate Venus Observation Macro 1 (1 min) Section C – Venus Observation Restoration Verify Special Processor not active (1 min) Activate post Venus Observation Macro 2 ( 1min)

2010/2011 Venus Observation P Jan Engineering Test / Installation 3.3 Standalone Testing Objective To validate Venus macro installation and back-out procedure in an operational scenario without impact to operations. The Standalone Testing was performed using STScI- provided test SMS. DSTIF Test Bed Configuration DMU (only one), DIUs (test configuration), CPM2 PCS Simulator, Version 51A 486 FSW Configuration (current on-orbit) FSW 3.4A installed BMIC enabled Telemetry ‘H’ Format Safemode tests and macros enabled for the SMS testing CCS Ground Test Configuration Ground System Software – CCS Version Database – O07300R1S

2010/2011 Venus Observation P Jan Engineering Test / Installation 3.3 Standalone Testing (continued) The STScI generated test SMS was run twice. Executed IP-219, Venus Observation SPC Macros, to patch the Safemode Responses and change the Sun Cosine Limit to support the Venus Observation During the first run of the SMS, the acquisitions were allowed to complete nominally. All of the acquisitions performed as expected. During the second run of the SMS, the acquisitions were forced to run long in the PCS Simulator to allow the AQEXPIRE timer to fire off. The setting of the AQEXPIRE parameter in the GSACQ blocks was verified to be long enough to allow enough time for the acquisitions to stop and maneuver the vehicle to the Target attitude before the Moving Target tracking slews were commanded. Executed IP-219, Venus Observation SPC Macros, to back out the Macro changes. If the AQEXPIRE command fires off while the #43 (Vehicle Offset Maneuver) command is being executed a Command Reject will occur. This is the same situation detailed in Ops Note It takes a very unique failure case for this to occur. The Vehicle will be at the correct target location if this happens and there are no Health and Safety concerns. The acquisition will terminate correctly.

2010/2011 Venus Observation P Jan Engineering Test / Installation STIS Venus Observations Test SMS (STISITDF) was generated and delivered to the SISE to validate special commanding and confirm the CCD observations with the TDF response disabled, allowing the exposure to continue regardless of the results of the GSAcq All external CCD exposures are normally taken with TDF response enabled. Test SMS was executed on VSTIF on NSSC-1 FSW BQ STIS FSW CS5.01/MIE4.4 (ov0008)CS5.01/MIE4.4 Bus monitor tool enabled for logging STIS Ops Benches in Safe mode prior to test start SMS was executed twice, once with TDF enabled and once with TDF disabled SMS transitioned STIS from Safe to Operate and then performed two CCD images. One with TDF response disabled and one with TDF Response Enabled. CCD Images were then dumped and headers reviewed to verify CCD Shutter performance.

2010/2011 Venus Observation P Jan Engineering Test / Installation STIS Venus Observations Summary STIS CCD Shutter opens and closes normally regardless of TDF state when TDF response in disabled. Additional manual testing of STIS CCD shutter response to TDF state toggling while exposure in progress was also performed. CCD Shutter remained open.

2010/2011 Venus Observation P Jan Engineering Test / Installation 3.4 Timeline Review 1 st Opportunity to load Venus Observation 356/20:28 – 20:55 2 nd Opportunity to load Venus Observation 356/21:56 – 22:37 1 st Opportunity to activate Macro 361/19:40 – 19:56 2 nd Opportunity to active Macro 361/21:36 – 22:01 Slew to Venus+5º starts at 361/22:30 Slew away from the Venus activities starting at 362/02:03 1 st Opportunity to restore via Macro 362/02:35 – 02:42 2 nd Opportunity to restore via Macro 362/03:35 – 03:40

2010/2011 Venus Observation P Jan Engineering Test / Installation – MEGG review PLACE HOLDER 1 st opportunity to load Venus Observation Macros

2010/2011 Venus Observation P Jan Engineering Test / Installation – MEGG review 2 nd opportunity to load Venus Observation Macros 1 st op. for NSSCI load

2010/2011 Venus Observation P Jan Engineering Test / Installation – MEGG review 1 st opportunity to Activate Macro 1

2010/2011 Venus Observation P Jan Engineering Test / Installation – MEGG review 2 nd opportunity to Activate Macro 1

2010/2011 Venus Observation P Jan Engineering Test / Installation – MEGG review

2010/2011 Venus Observation P Jan Engineering Test / Installation – MEGG review

2010/2011 Venus Observation P Jan Engineering Test / Installation – MEGG review 1 st opportunity to execute restore macro 2 2 nd opportunity to execute restore macro 2

2010/2011 Venus Observation P Jan Engineering Test / Installation – MEGG review

2010/2011 Venus Observation P Jan Engineering Test / Installation 3.4 Timeline Review Venus Visit st Opportunity to activate Macro 022/14:20- 14:50 2 nd Opportunity to active Macro 022/15:16 – 15:46 Slew to Venus+5º starts at 022/16:45 Slew away from the Venus activities starting at 022/18:46 1 st Opportunity to restore via Macro 022/ 19:00 – 19:07 2 nd Opportunity to restore via Macro 022/19:19 – 20:03 Venus Visit st Opportunity to activate Macro 027/12:00 – 12:19 2 nd Opportunity to active Macro 027/12:28 -12:41 Slew to Venus+5º starts at 027/14:58 Slew away from the Venus activities starting at 027/17:04 1 st Opportunity to restore via Macro 027/ 17:18 – 17:48 2 nd Opportunity to restore via Macro 027/19:00 – 19:47

2010/2011 Venus Observation P Jan nd opportunity to Activate Macro 11 st opportunity to Activate Macro 1

2010/2011 Venus Observation P Jan 2011

2010/2011 Venus Observation P Jan st opportunity to execute restore macro 2 2 nd opportunity to execute restore macro 2

2010/2011 Venus Observation P Jan 2011

2010/2011 Venus Observation P Jan nd opportunity to Activate Macro 1 1 st opportunity

2010/2011 Venus Observation P Jan 2011

2010/2011 Venus Observation P Jan st opportunity to execute restore macro 2

2010/2011 Venus Observation P Jan nd opportunity to execute restore macro 2

2010/2011 Venus Observation P Jan Monitoring and System Impacts 4.1 On-Orbit Validation / Monitoring DMS will validate successful load of the (safemode) configuration macro PCS will monitor OBAD acq PI will validate data prior to Jan observations 4.2 System Impacts PCS, SI, EPS: None DMS, I&C Mat LEI turned off for a 9 hour window THERMAL: Waiver of CARD (see Section 5.1) SAFING: Temporary modification to responses of six safemode tests In FSW, reducing the Sunpoint Sun protection threshold limit to provide margin for Venus Observation PSEA BOD circuitry provides redundancy against Sun in the boresight within 38º

2010/2011 Venus Observation P Jan Monitoring and System Impacts 4.3 Supporting Operations Changes None 4.4 Supporting PRD Changes None 4.5 Subsystem Training Module Changes None

2010/2011 Venus Observation P Jan Constraints and Restrictions Review 5.1 CARD One waiver is required: HST Sun Pointing Limits The HST sun angle as measured from the +V1 axis should not go below 50°. Excursions could raise the OTA baffle temperatures above their bake-out temperatures and out-gassing may result. 46° is required for the Venus observation EM MOSES 1067 outlines the thermal impacts to prolonged sun angles <50° A nominal Venus Observation as outlined here should not violate any temperature limits An inertial hold safemode at sun angles <50° has the potential to violate OTA baffle temperature limits All contingency procedures comply with the CARD 5.2 OLD No operations limitations violated or waivers required in the procedures All activities for installation handled by FSW code design and procedure

2010/2011 Venus Observation P Jan Contingency Planning 6.1 Vehicle Contingencies HST safing while pointed within the SAZ Concern If HST were to enter inertial hold safe mode while pointed within the SAZ, that could violate thermal temperature limits on the OTA baffles After 15 minutes in sunlight at 46° sun angle the OTA baffles exceed their 121°C bake-out temperature limit (EM MOSES 1067) Precautions Redirecting certain safemode tests such that conditions that would normally lead to inertial hold leads to software sun point safe mode instead to prevent Sun in boresight CDH Safing event Still activate observation macro Allow SMS to continue No observation

2010/2011 Venus Observation P Jan Contingency Planning 6.1 Vehicle Contingencies FGS exposure to Venus Concern If the attitude error is large enough, an FGS could possibly see Venus and cause potential bright light exposure to the FGS photo-multiplier tubes. Precautions Choose guide stars that are as far as possible from Venus The chosen guide star is magnitude 12.4 and will be about 15.5 arcminutes from Venus

2010/2011 Venus Observation P Jan Contingency Planning 6.1 Vehicle Contingencies FGS exposure to Venus Analysis Goodrich assessed PMT damage should a worst-case event occur resulting in an attempted acquisition of Venus with an FGS (ref: Goodrich Memo A16-ST-2254) Goodrich reports the short-term effect of the Venus acquisition would be the temporary incapacitation of the PMTs due to dark count elevation. While the exact value is not available for the given intensity, literature quotes range from several to 48 hours for recovery (for any target). Goodrich performed a relative assessment of the long-term effects of Coulomb draw (charge depletion) while attempting to acquire Venus with an FGS. While it is hard to determine exactly how the FGS would behave if it attempted to perform an acquisition on Venus, depending on how long it spends with Venus in the FOV, you could see a decrease in reliability from 1-3%. Response If SEs determine that there is a large attitude error, Software Sunpoint may be commanded via COP 6.01

2010/2011 Venus Observation P Jan Contingency Planning 6.1 Vehicle Contingencies Code Red GSFC Inclement Weather Situation Venus observation will be executed from SMS If potential weather situation is predicted, an early execution of the configuration macro will be performed during good weather If sudden storm occurs, SEs will make best effort to support from SMOR or via phone

2010/2011 Venus Observation P Jan Engineering Support Requirements 7.1 Personnel Test Conductor – DMS Ben Teasdel FSW- Norm Roy Systems Management- Wayne Burdick STIS - Steve Arslanian PCS - Dan Smith Normal SE on-call personnel FOT - normal shift 7.2 Communications / Data FOT will be briefed before the test. Circuit assignments: R/T Ops COORD Primary circuit for Test Conductor and FOT HST COORD Backup loop to FOT Ops Requests (OR’s) – “Load Venus Observation Macros” – “Venus Observation Patch” Venus Observation Patch Venus Observation Patch 3 Flash Reports will be issued following completion of the test. FRR Material is available on EDOCS web site

2010/2011 Venus Observation P Jan Engineering Support Requirements 7.3 CCS Prime Ops on “F” string Back-up Ops on “D” string CCS Release PRD O07300R1S FSW loads have been delivered to both prime and back-up strings

2010/2011 Venus Observation P Jan Liens/Issues None

2010/2011 Venus Observation P Jan Forward Plan Ops Briefing Jan 19 th PI to analyze data from December observation prior to this briefing to ensure observation was successful and enable refinements of January observation to improve data gathering.

2010/2011 Venus Observation P Jan Actions

2010/2011 Venus Observation P Jan 2011 Backup Information

2010/2011 Venus Observation P Jan 2011 Target Visibility GS Pair Acq at Venus+5D Slew to Venus Target Visibility Shadow Single GS Acq at Venus Observe Venus Slew to Venus+5D Observe Venus+5D GS Pair Acq at Venus+5D Observing Strategy Details Target Visibility Shadow Slew to Venus Single GS Acq at Venus Observe Venus Slew to Venus+5D Observe Venus+5D GS Pair Acq at Venus+5D –Display as seen from HST

2010/2011 Venus Observation P Jan 2011 –Sun –Venus –Earth HST’s View of Venus (t = 0) –Venus is in Earth occultation. The Sun is not. HST would be pointed at Venus+5D at this time. –Sun –Venus –Venus+5D –Earth –Sun –Venus –Venus+5D –Earth

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 5 min) –The Sun is moving toward setting.

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 10 min) –The Sun is moving toward setting. The terminator becomes visible on the Earth.

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 15 min) –The Sun is very close to setting.

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 20 min) –The Sun has set. HST is now in the Earth’s shadow.

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 25 min) –Venus is very close to rising. At about this time, HST will begin its slew from Venus+5D to Venus

2010/2011 Venus Observation P Jan 2011 HST’s view of Venus (t = 30 min) –Venus has risen. At about this time, HST will complete its slew to Venus; and the guide star acquisition will begin.

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 35 min) –At about this time, the guide star acquisition will finish; and the science observation will begin.

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 40 min) –At about this time, the science observation will finish; and the slew to Venus+5D will begin.

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 45 min) –The Sun is very close to rising.

2010/2011 Venus Observation P Jan 2011 HST’s View of Venus (t = 50 min) –The Sun has risen. HST is now out of the Earth’s shadow. The slew to Venus+5D finishes a couple of minutes after sunrise.