© 1Spatial 2012. All rights reserved. The cloud roadmap for MapRoad data validation GIS Ireland 2012 Barry Doyle, Roscommon County Council and Chris Tagg,

Slides:



Advertisements
Similar presentations
Combining OS and OSM Data - A Case Study for geospatial data integration Name: Du Heshan Supervisor: Dr Suchith Anand.
Advertisements

Copyright 2007 EcoSys Management LLC All Rights Reserved. Confidential and Proprietary Information. 1 Integrating Financial Management with Project Management.
NetPay provides best and effective solution for company Managers to maintain their employee scheduling task (including staff in/out details, overtime,
Components of GIS.
PRIME 2 Shortest Path Routing Simon McCabe Chief Technology Officer IMGS.
Fax: Post: PO Box 168 Richmond 3121 Richmond Town Hall – 333 Bridge Road, Richmond Collingwood Town Hall.
Overview of IS Controls, Auditing, and Security Fall 2005.
 Permitting Routing › Definition › Permits Type › Permitting Process  Project Purpose › Proposed Solution  GIS › Definition › Functions › Benefits.
Importing Transfer Equivalencies: How to Maximize Efficiency How Columbia College Office of Registrar improved productivity through third party solutions.
Integrate Autodesk® Topobase™ with other systems and get more value out of your data Sebastian BaumhekelClaudia Zeh Programmer/SW EngineerTechnical Consultant.
Dr Gordon Russell, Napier University Unit Data Dictionary 1 Data Dictionary Unit 5.3.
T-FLEX DOCs PLM, Document and Workflow Management.
Copyright © 2005 Bruce Kessler All Rights Reserved Ch. 2 GeoDatabase Basics Laying the foundations.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
SE 555 Software Requirements & Specification Requirements Management.
11 3 / 12 CHAPTER Databases MIS105 Lec14 Irfan Ahmed Ilyas.
Noise Mapping For The Environmental Noise Directive WHAT IT MEANS FOR SCOTLAND Dr Bernadette McKell, October 2006.
GIS in a nutshell Faris Alsuhail What is GIS? “A geographic information system (GIS) integrates hardware, software, and data for capturing, managing,
USING GIS TO FOSTER DATA SHARING AND COMMUNICATION SEAN MURPHY IVS BURLINGTON, VT.
1 Alternate Title Slide: Presentation Name Goes Here Presenter’s Name Infrastructure Solutions Division Date GIS Perfct Ltd. Autodesk Value Added Reseller.
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
Product Offering Overview CONFIDENTIAL AND PROPRIETARY Copyright ©2004 Universal Business Matrix, LLC All Rights Reserved The duplication in printed or.
Managing Data Interoperability with FME Tony Kent Applications Engineer IMGS.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2013 OUR ROADS – PLANNING FOR THE FUTURE/ROLE IN NATIONAL AND LOCAL DEVELOPMENT HODSON.
Functional Model Workstream 1: Functional Element Development.
Warren County Middle School Business And Information Technology Program “ A Different Approach”
Parcel Data Models for the Geodatabase
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2014 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2014.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
 Explain the role of a system analyst.  Identify the important parts of SRS document.  Identify the important problems that an organization would face.
OVERVIEW- What is GIS? A geographic information system (GIS) integrates hardware, software, and data for capturing, managing, analyzing, and displaying.
Geographic Information System GIS This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF GIS Geographic Inf o rmation.
Copyright 2010, The World Bank Group. All Rights Reserved. COVERAGE, FRAMES & GIS, Part 2 Quality assurance for census 1.
Using ArcView to Create a Transit Need Index John Babcock GRG394 Final Presentation.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure the evidence is.
1Spatial Source Data Validation Analysis. High Performance Monitoring System (HPMS) Field manual analysis describing how data is collected and submitted.
Implementing the Standard on digital recordkeeping.
Difference Between Raster and Vector Images Raster and vector are the two basic data structures for storing and manipulating images and graphics data on.
ArcGIS Data Reviewer: An Introduction
Georgia Electronic Voting System Testing and Security Voting Systems Testing Summit November 29, 2005.
Intelligent Flood Maps forAutomatic Flood Determinations.
Exploring Spatial Data Infrastructure in an Open Source World Jacqueline Lowe UNC-Asheville National Environmental Modeling and Analysis Center Jacqueline.
What's New in eCognition Essentials 1.1 Christian Weise.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2014 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2014.
Pro-West & Associates Utilities On The Move Kendis Scharenbroich GIS Consultant Pro-West & Associates.
1 Ian Skinner Crash information Systems Integrating geographical and statistical analysis for maximum benefit.
Road Information System / Road Data Bank 10 April 2013 Lars Bergman M. Sc. In Civil Engineering Long Term Planning Swedish Transport Administration.
The SCDB Landgate Western Australia Lou Teeuwissen Manager SCDB DCDB National Workshop Sydney
Accurate Information … Informed Decisions Data from automated and manual sources in a central, secure repository providing easy regulatory and ad hoc reporting,
Land Services Group The South Australia Story DCDB National Workshop Sydney 28 – 30 July 2010 Presented by Mauri Trinca.
UNIT 3 – MODULE 4: Database Management. INTRODUCTION Managing data is a critically important function. It enables strategic searching & manipulation of.
The information systems lifecycle Far more boring than you ever dreamed possible!
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
TASMANIAN JURISDICTIONAL UPDATE DCDB National Workshop28-30 July 2010 Andrew Tomes Manager - Spatial Data & Julian Gill Program Leader - Cadastral & Transport.
Esri UC 2014 | Technical Workshop | Address Maps and Apps for State and Local Government Allison Muise Nikki Golding Scott Oppmann.
RPA – Robotic Process Automation
The training simulator Final Conference, Athens, Greece 16 September 2011.
TUGIS March 15, 2016 Next Generation 911 Data Management TUGIS 2016.
AAtom ERP.
Figure 9.8 User Evaluation Form
Introduction to GIS GIS in Cadastral Management
Physical Structure of GDB
Automatic Digitizing.
Maximize the value of your cloud
Positional Accuracy Assessment
Reportin Integrates with Microsoft Office 365 to Provide an End-to-End Platform for Financial Teams That Simplifies Report Creation and Management OFFICE.
In-service Usage, Performance Monitoring & Management Service
The pursuit of perfection
Presentation transcript:

© 1Spatial All rights reserved. The cloud roadmap for MapRoad data validation GIS Ireland 2012 Barry Doyle, Roscommon County Council and Chris Tagg, 1Spatial

MapRoad Background  GIS application used by Local Authorities to manage road related data such as the road itself, road condition data, road maintenance data, accident data, bridge data, and traffic data.  Desktop based \ Runs on top of MapInfo.  Functionality available through a number of modules.  To be used for the planning, creation, estimation of Works Programmes.  Developed, Implemented, Supported by LGMA (Previously LGCSB). 2

Road Network Module  Main module used to manage and maintain the Road Schedule. (Roads taken in charge by the Council).  Roads are represented as road segments, with nodes identifying start and end points.  Attribution stored against road segments and nodes. 3

4

Project Drivers 5  Recognition of need to improve accuracy of Road schedule.  Various issues identified including:  Accuracy issues (Originally digitised from OSi 6” map series)  Connectivity issues (Road to Road / Road to node)  Geometric issues  Support evidence based grant submissions.  Upgrade to MapRoad 2.3.

Online Validation Service 6 Baseline assessment Kickbacks, spikes, dup points Continuous network Accurate alignment Quantitative benefit analysis

Results  Automated workflow reduced number of non- conformances from 12, 312 to only 161 7

Benefits  Validation  Service gives a picture of data prior to any processing  Can be used to identify internal process issues and define business cases  Identification of all issues and errors  MapRoad specific  Geometric  Identification of errors that couldn’t be identified manually  Time and resource savings  Auto-correction  Re-alignment with OSi large scale vectors 8

Benefits  Future Proof  Utilisation for other purposes e.g. INSPIRE  Easy integration with OSi PRIME2  Flexible  Rules can be added or modified within a relatively short timeframe  The cloud approach  No implementation costs (hardware / software /development)  Subscription cost model 9

10 Barry Doyle Chris Tagg