E. De Lucia LNF-INFN June 4 th 2013 Jagiellonian University Krakow Development of CGEM technology for ultra-light tracking detectors.

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

KLOE II Inner Tracker - FEE Status Antonio Ranieri RD51 Collaboration Meeting Paris October 2008 INFN-Bari S ervizio E lettronico L aboratori F rascati.
Salvatore Fiore University of Rome La Sapienza & INFN Roma1 for the KLOE collaboration LNF Spring School “Bruno Touscheck”, Frascati, May 2006 CP/CPT.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Status Update on Mechanical Prototype in Rome November 6,
July 2003American Linear Collider Workshop Cornell U. Development of GEM-based Digital Hadron Calorimetry Andy White U.Texas at Arlington (for J.Yu, J.Li,
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
Status of KLOE-2 Inner Tracker JOINT-GEM meeting Helsinki 15 July 2010 G.Bencivenni.
SPHENIX GEM Tracker R&D at BNL Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
1 The GEM Readout Alternative for XENON Uwe Oberlack Rice University PMT Readout conversion to UV light and proportional multiplication conversion to charge.
Status report on MURAY telescope R&D
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Test Beam the μ-RWELL Test Beam the μ-RWELL G. Bencivenni (a), R. de Oliveira (b), M. Gatta (a), G. Felici (a), G. Morello (a), M. Poli Lener (a) (a),
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
F.Murtas1IMAGEM DDG GEM technology for X-ray and Gamma imaging IMAGEM l Detector setup l First results on X-ray imaging l First results on Gamma ray imaging.
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
M. Bianco On behalf of the ATLAS Collaboration
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Status of the Cylindrical‐GEM project for the KLOE‐2 Inner Tracker Danilo Domenici (INFN-LNF) on behalf of the KLOE-2 collaboration Villa Olmo, Como –
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
TEMPLATE DESIGN © CONFIG. 1: 12mm(Drift) / 12mm(T1) / 12mm(T2) / 12mm(Induction) CMS Endcap Resistive Plate Chamber Muon.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
January 7th, USTC, Hefei 1 A CGEM Prototype for BESIII Inner Drift Chamber Upgrade R. Baldini Ferroli, (INFN-LNF) for a China-Italy Collaboration.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Danilo Domenici On behalf of the KLOE-2 IT subgroup Vienna Conference on Instrumentation 2013.
The interaction of the Laboratori Nazionali di Frascati– INFN with TE-MPE-EM Workshop G. Bencivenni LNF-INFN Frascati - Italy.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
The Cylindrical GEM detector for the KLOE-2 Inner Tracker G. Bencivenni, LNF-INFN, Italy on behalf of the KLOE-IT group 1 LABORATORI NAZIONALI DI FRASCATI.
GEM detectors activity at the Laboratori Nazionali di Frascati INFN G.BencivenniLNF-INFN.
Danilo Domenici – LNF On behalf of the KLOE-2 Collaboration.
Danilo Domenici on behalf of the KLOE-2 Inner Tracker sub-group Novosibirsk.
Performances of a GEM-based TPC prototype for the AMADEUS experiment Outline: GEM-TPC in AMADEUS experiment; Prototype design & construction; GEM: principle.
Trigger & Tracking detector for CMS
Erika De Lucia for the KLOE-2 Inner Tracker Group.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
(On Behalf of CMS Muon Group)
Activity of CERN and LNF Groups on Large Area GEM Detectors
FCAL R&D towards a prototype of very compact calorimeter
Dept. of Physics and Space Sciences, Florida Institute of Technology
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
LABORATORI NAZIONALI DI FRASCATI
CMS muon detectors and muon system performance
Numerical simulations on single mask conical GEMs
Numerical simulations on single mask conical GEMs
MWPC’s, GEM’s or Micromegas for AD transfer and experimental lines
Pre-installation Tests of the LHCb Muon Chambers
A DLC μRWELL with 2-D Readout
Presentation transcript:

E. De Lucia LNF-INFN June 4 th 2013 Jagiellonian University Krakow Development of CGEM technology for ultra-light tracking detectors

KLOE at DAFNE  -factory Precision Kaon and Hadron Physics with KLOE Rivista del Nuovo Cimento Vol.31, N.10 (2008) Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 2 Frascati φ-factory DAφNE: an e + e - √s = MeV = M φ Best performance in 2005: L peak = 1.4 × cm -2 s -1 ∫ Ldt = 8.5 pb -1 /day KLOE has acquired 2.5 fb √s=M φ ( ) pb -1 √s=1 GeV

KLOE at DAFNE  -factory Precision Kaon and Hadron Physics with KLOE Rivista del Nuovo Cimento Vol.31, N.10 (2008) Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 3 Frascati φ-factory DAφNE: an e + e - √s = MeV = M φ Best performance in 2005: L peak = 1.4 × cm -2 s -1 ∫ Ldt = 8.5 pb -1 /day KLOE has acquired 2.5 fb √s=M φ ( ) pb -1 √s=1 GeV

KLOE at DA  NE  -factory 6 m 7m Lead/scintillating fiber 98% coverage of solid angle 88 modules (barrel + end-caps) 4880 PMTs (two side read-out) Lead/scintillating fiber 98% coverage of solid angle 88 modules (barrel + end-caps) 4880 PMTs (two side read-out) 4 m diameter × 3.3 m length 90% helium, 10% isobutane 12582/52140 sense/tot wires All-stereo geometry 4 m diameter × 3.3 m length 90% helium, 10% isobutane 12582/52140 sense/tot wires All-stereo geometry Electromagnetic Calorimeter Drift Chamber  r  = 150  m  z = 2 mm  V = 3 mm  p /p = 0.4 %  r  = 150  m  z = 2 mm  V = 3 mm  p /p = 0.4 %  E /E =5.4%/  t = 54 ps/  E /E =5.4%/  t = 54 ps/ 50 ps(calib)  50 ps(calib) KS = 0.6 cm KL = 340 cm K  = 95 cm B = 0.52 T Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 4   K S K L

KLOE at DA  NE  -factory 6 m 7m Lead/scintillating fiber 98% coverage of solid angle 88 modules (barrel + end-caps) 4880 PMTs (two side read-out) Lead/scintillating fiber 98% coverage of solid angle 88 modules (barrel + end-caps) 4880 PMTs (two side read-out) 4 m diameter × 3.3 m length 90% helium, 10% isobutane 12582/52140 sense/tot wires All-stereo geometry 4 m diameter × 3.3 m length 90% helium, 10% isobutane 12582/52140 sense/tot wires All-stereo geometry Electromagnetic Calorimeter Drift Chamber  r  = 150  m  z = 2 mm  V = 3 mm  p /p = 0.4 %  r  = 150  m  z = 2 mm  V = 3 mm  p /p = 0.4 %  E /E =5.4%/  t = 54 ps/  E /E =5.4%/  t = 54 ps/ 50 ps(calib)  50 ps(calib) B = 0.52 T Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 5 KS = 0.6 cm KL = 340 cm K  = 95 cm   K S K L

KLOE at DA  NE  -factory 6 m 7m Lead/scintillating fiber 98% coverage of solid angle 88 modules (barrel + end-caps) 4880 PMTs (two side read-out) Lead/scintillating fiber 98% coverage of solid angle 88 modules (barrel + end-caps) 4880 PMTs (two side read-out) 4 m diameter × 3.3 m length 90% helium, 10% isobutane 12582/52140 sense/tot wires All-stereo geometry 4 m diameter × 3.3 m length 90% helium, 10% isobutane 12582/52140 sense/tot wires All-stereo geometry Electromagnetic Calorimeter Drift Chamber  r  = 150  m  z = 2 mm  V = 3 mm  p /p = 0.4 %  r  = 150  m  z = 2 mm  V = 3 mm  p /p = 0.4 %  E /E =5.4%/  t = 54 ps/  E /E =5.4%/  t = 54 ps/ 50 ps(calib)  50 ps(calib) B = 0.52 T Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 6 K L in Calorimeter K S   0  0  KS = 0.6 cm KL = 340 cm K  = 95 cm   K S K L

The KLOE-2 Project: Physics & Collider  The KLOE-2 project aims at improving the successful and fruitful results achieved by the KLOE Collaboration in Kaon and Hadron Physics and extending the physics program to :  -physics from search for particles from “hidden sectors” that might explain dark matter  The project will exploit the new interaction scheme implemented on the Frascati DAFNE phi-factory collider with the SIDDHARTA experiment in 2008/09 with: Larger beam crossing angle and crab-waist sextupoles Luminosity increase up to a factor of  3 Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 7

The KLOE-2 Project: Physics & Collider  The KLOE-2 project aims at improving the successful and fruitful results achieved by the KLOE Collaboration in Kaon and Hadron Physics and extending the physics program to :  -physics from search for particles from “hidden sectors” that might explain dark matter  The project will exploit the new interaction scheme implemented on the Frascati DAFNE phi-factory collider with the SIDDHARTA experiment in 2008/09 with: Larger beam crossing angle and crab-waist sextupoles Luminosity increase up to a factor of  3 Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 8

The KLOE-2 Project: detector upgrades 2nd phase /step-1 2nd phase /step-1 now : CCAL LYSO + APD Increase acceptance for  ’s from IP (21°→10°) INNER TRACKER 4 layers of cylindrical triple GEM Better vertex reconstruction near IP Larger acceptance for low pt tracksQCALT W + scintillator tiles + SiPM/WLS quadrupoles coverage for K L decays 1st phase/step-0 1st phase/step-0 : LET & HET LYSO+SiPMs & Scint+PMTs Lepton taggers for  -physics Technical Design Report - arXiv: Technical Design Report LNF - 10/14(P) INNER TRACKER CCAL HET E>400MeV, 11m from IP LET MeV inside KLOE KLOE Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 9

KLOE-2 Inner Tracker Upgrade For fine vertex reconstruction of K s, η and η’ rare decays and K s - K L interference and QM tests:   rφ  200 µm and  z  500µm  low material budget:<2%X 0  5 kHz/cm 2 rate capability K S →  vertex resolution will improve of about a factor 3 from present 6mm  4 CGEM layers with radii 13/15.5/18/20.5 cm from IP and before DC Inner Wall  700 mm active length  XV strips-pads readout (  25  stereo angle)  2% X 0 total radiation length in the active region with Carbon Fiber structure 3 mm 2 mm Cathode GEM 1 GEM 2 GEM 3 Anode Read-out Cylindrical Triple GEM Cylindrical GEM (CGEM ) detector is the solution Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 10

The GEM is a 50 μm thick copper- coated kapton foil, with high density of holes (70 μm , 140 μm pitch) manufactured with standard photo-lithographic technology [F. Sauli, NIM A386 (1997) 531] Gas Electron Multiplier (GEM) Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 11 By applying a difference of potential ( V) between the two copper sides, in presence of external Drift and Collection fields, an electric field as high as ~100 kV/cm is produced into the Holes, acting as Multiplication Stages for ionization electrons released in the drift gas gap Conversion & Drift Collection

 Gains up to 1000 can be easily reached with a single GEM foil.  Higher gains (and/or safer working conditions) are usually obtained by cascading two or three GEM foils G  e  Vgem Gas Electron Multiplier (GEM) Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 12

Novel Idea: a Cylindrical GEM detector

The CGEM project : three years of R & D 1)Construction and characterization of a CGEM prototype NSS Conf. Rec. Vol. I (2009) )Construction and characterization of a CGEM prototype built using 3 GEM foils (354 x 330 mm 2 ) spliced together. Axial strips single view (TB 2008) NSS Conf. Rec. Vol. I (2009) ) new concept for XV readout and study operation in magnetic field 2) Construction of 100 x 100 mm 2 planar chambers equipped with new concept for XV readout and study operation in magnetic field (TB 2009). NIMA 628 (2011) 194 NIMA 628 (2011) 194 3) Construction and characterization of two large planar chambers 300x700 mm with the new single-mask photolitographic technique Physics Procedia 37(2012) 522 3) Construction and characterization of two large planar chambers 300x700 mm with the new single-mask photolitographic technique equipped with final XV readout (TB 2010). Physics Procedia 37(2012) 522 Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 14 X pitch 650µm V pitch 600µm XV strips on the same plane CGEM The CGEM is a low-mass, fully cylindrical and almost dead-zone-free detector

The CGEM project : three years of R & D Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 15 1)Construction and characterization of a CGEM prototype NSS Conf. Rec. Vol. I (2009) )Construction and characterization of a CGEM prototype built using 3 GEM foils (354 x 330 mm 2 ) spliced together. Axial strips single view (TB 2008) NSS Conf. Rec. Vol. I (2009) ) new concept for XV readout and study operation in magnetic field 2) Construction of 100 x 100 mm 2 planar chambers equipped with new concept for XV readout and study operation in magnetic field (TB 2009). NIMA 628 (2011) 194 NIMA 628 (2011) 194 3) Construction and characterization of two large planar chambers with the new single-mask photolitographic technique Physics Procedia 37(2012) 522 3) Construction and characterization of two large planar chambers with the new single-mask photolitographic technique equipped with final XV readout (TB 2010). Physics Procedia 37(2012) 522 CGEM The CGEM is a low-mass, fully cylindrical and almost dead-zone-free detector  (GEM)  200µm Residuals (mm) V GEM (V) Efficiency(%) KLOE B-field ResX  190µm ResY  350µm

Building the Final Detector

Quality check s on GEM foils 1) HV test in N 2 environment RH<10% 2) Optical inspection Good HV sector have I < 600V Discharge rate measured over ~1h GEM holes have 70µm diameter and 140µm pitch Over-etching Scratches Missing holes few sectors with current > 1 V Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 17

Building the Cylindrical GEM 3 foils spliced - Epoxy glue distributed on a 2mm wide line Vacuum bag envelope at 0.9 bar CGEM with fiberglass rings: gap spacers and mechanical support Electrode wrapped on cylindrical mold & covered with Mylar Transpirant tissue is placed around to distribute vacuum 1) 2) 3) 4) 5) Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 18

Building the cylindrical Anode Foil wrapped on the mold for cylindrical shape X pitch 650µm V pitch 600µm XV strips on the same plane 2) 3 foils spliced w/o overlap: 6 cm kapton strips are glued on the back of head-to-head joints 1k strips 1M pads 1) ~1mm dead zones ~1m Delay (ns) V Strip# Shorts  Anode Quality Control with a 100 ps precision Time Domain Reflectometer NIMA 698 (2013) Transmission line length and its damages evaluated by measuring the delay of the reflected signal Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 19

Manufacturing a Cathode Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 20 We place an inner cylindrical kapton layer on the mold Nomex honeycomb 3 mm thick is glued on the back of the cathode Cathode (made by 3 foils) is wrapped around the mold and closed with a vacuum bag Final cathode is ready with both internal and external fiberglass rings

Detector assembly: Anode+GEM3+GEM2+GEM1+Cathode The GEM is placed on the Machine with its mold Everything is aligned with an axial precision of ≈0.1mm/1.5m The Anode Readout is moved down around the GEM Anode GEM Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 21

The 1 st CGEM layer completed FEE tails 21 on each side HV tails on the two sides Layer2 w Custom Gastone FEE FEE is supported by 2 fiberglass outer rings Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 22

The four CGEM Layers of Inner Tracker Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 23

CGEM Layers Validation Tests

Setup for cosmic-ray muons & 90 Sr Tests  Each layer instrumented with: Final custom Global Interface Boards (GIB) and Transition Boards (TB) and ROD  The DAQ System uses the Final custom Global Interface Boards (GIB) and Transition Boards (TB) and ROD JINST 8 T04004 (2013) Final HV cables and Custom HV distribution Final Signal cables & Gastone FEE Final Signal cables & Gastone FEE NIMA 604 (2009) Trigger: 2 scintillators (Top - Bottom) External Tracking System provided by three Planar Triple-GEM chambers PGEMs (Top - 2 Bottom) Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 25

Validation Test with 90 Sr Source (I) S1S2S3S4S5S6S7S8S9S10S11S12  S1-S12 HV Sectors  Source Scan positioning 90 Sr inside CGEM on each HV sector Source on S1 X-view Fired Strips Unrolled Anode Foil: X-view Strips S1S2 Source on S2 X-view Fired Strips FEE Boards All X-view Strip illuminated with 90 Sr   Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 26

Validation Test with 90 Sr Source (II) The profile of the source in 6 different positions is reconstructed by triggering the DAQ with a clock signal This fast test allows to check the cabling and the uniformity of the detector Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 27 Layer 1 has 6 HV sectors only Layer 1 Source Scan

Cosmic-ray muons setup 1.Trigger with Coincidence of 2 scintillators Top AND 2 scintillators Bottom 2.Require External Tracking provided by 3 Planar Triple-GEM 10x10 cm 2 3.Select events in CGEM Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 28

Layer 1 validation with cosmic-ray muons  Selecting events using External Tracking provided by 3 Planar Triple-GEM Front view 3D view Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 29 GASTONE Board Threshold not optimized

Layer 1 validation with cosmic-ray muons  Selecting events using External Tracking provided by 3 Planar Triple-GEM Unrolled Anode Foil ( ,  ) coordinate system ( ,  ) coordinate system Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 30 1 st X and V strip positions are not at the edge of trigger- illuminated area 

Layer 2 Validation with cosmic-ray muons  Selecting events using External Tracking provided by 3 Planar Triple-GEM 3D view Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 31

Layer 2 Validation with cosmic-ray muons  Selecting events using External Tracking provided by 3 Planar Triple-GEM Z vs X (Lego View) 3D view PGEMs misalignment & Masked Channels Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 32 GASTONE Board Threshold not optimized

Layer 3 validation with cosmic-ray muons  Selecting events using External Tracking provided by 3 Planar Triple-GEM Front view 3D view Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 33 GASTONE Board Threshold not optimized

Layer 3 validation with Cosmic-ray muons Unrolled Anode Foil ,  coordinate system  Selecting events using External Tracking provided by 3 Planar Triple-GEM Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 34

KLOE-2 Inner Tracker assembled Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 35

Inner Tracker Integration on Beam Pipe Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 36

Conclusions  The GEM-based detector lightness and flexibility have been exploited to build a low-mass (X 0 ≈ 2%), fully cylindrical and almost dead-zone-free Inner Tracker as an upgrade of the KLOE detector  After three years of R&D and more than one year of construction we have completed the 4 Cylindrical GEM layers of KLOE-2 Inner Tracker  The detectors have been extensively tested showing good operational stability and fulfilling the expected performance The final assembly of the KLOE-2 Inner Tracker, the first Cylindrical GEM ever built, has been completed on March, 14th.  Detectors Integrated on DAFNE beam-pipe, cabling ongoing these days  Commissioning of the Inner Tracker will start soon after, together with DAFNE commissioning Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 37

Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 38 Thank you

CGEM Material Budget 39 Material Radiation Length (cm) Copper1,43 Polyimide - Kapton28,6 Carbon fiber28 Argon14000 Isobuthane17000 Epoxy - Araldite ,5 Honeycomb - Nomex1250 Fiberglass - FR416 Air30500 Aluminum8 Gold0,33 Thickness (µm) Radiation Length (%) Copper31,68E-04 Polyimide501,40E-04 Copper31,68E-04 GEM foil564,76E-04 Copper32,10E-04 Polyimide501,75E-04 Honeycomb30002,40E-04 Polyimide501,75E-04 Copper32,10E-04 Cathode foil31061,01E-03 Gold0,13,03E-05 Copper52,45E-04 Polyimide501,75E-04 Copper51,05E-04 Epoxy12,53,73E-05 Polyimide1254,37E-04 Epoxy12,53,73E-05 Polyimide501,75E-04 Copper32,10E-04 Gold0,13,03E-05 Anode Foil2631,48E-03 Carbon fiber903,21E-04 Honeycomb50002,40E-04 Carbon fiber903,21E-04 CF Shield32009,54E-04 Total 1 Layer4,93E-03 Total 4 Layers1,97E-02 The KLOE-2 requirement of X0 < 2% is fulfilled Gas (90% Ar – 10% iC4H10)90006,29E-05

Large-area GEM foils for KLOE-2 IT  The wide request of Large Detectors by the GEM community, including KLOE-2 Inner Tracker, started the development of a new GEM production procedure  A Single-Mask etching technique has been developed by TE-MPE-EM CERN workshop, allowing GEM foils as large as 450x2000mm 2 to be realized. Larger foils are obtained with GEM foils spliced together Starting material 50 μm Kapton foil with 5μm Copper clad Hole opened with top side metal etching are used as self-mask for the kapton etching Bottom side metal etching. Top side metal is preserved with Cathodic Protection technique Back to kapton etching for 30 s to get cylindrical shaped hole Photoresist coating, Single Mask laid down and exposed to UV light Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 40

The GEM is a 50 μm thick copper- coated kapton foil, with high density of holes (70 μm , 140 μm pitch) manufactured with standard photo-lithographic technology [F. Sauli, NIM A386 (1997) 531] Gas Electron Multiplier (GEM) Starting material 50 μm Kapton foil with 5μm Copper clad Double side metal etching with a standard printed circuit technology Double side kapton etching with polymer solvent. The hole has bi-conical shape Photoresist coating, Double Mask laid down and exposed to UV light Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 41

By applying a difference of potential ( V) between the two copper sides, in presence of external Drift and Collection fields, an electric field as high as ~100 kV/cm is produced into the holes, acting as multiplication stages for ionization electrons released in the drift gas gap Gains up to 1000 can be easily reached with a single GEM foil. Higher gains (and/or safer working conditions) are usually obtained by cascading two or three GEM foils G  e  Vgem Gas Electron Multiplier (GEM) Conversion & Drift Collection Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 42

IT FEE: Gastone Board Mixed analog-digital circuit Low input equivalent noise, low power consumption and high integrated chip 4 blocks: 1. charge sensitive preamplifier 2. shaper 3. leading-edge discriminator 4. monostable Technology0.35 CMOS -no radhard Sensitivity (pF)20 mV/fC Z IN 400 Ω (low frequency) C DET 1 – 50 pF Peaking time90 – 200 ns (1-50 pF) Noise (erms)800 e e - /pF Channels/chip64 ReadoutLVDS/Serial Power consum.≈ 0.6 mA/ch 128-channel Custom GASTONE Board [NIMA 604 (2009)] Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 43

Off-detector electronics and DAQ [JINST 8 T04004 (2013)] Data from the detector are collected using the front-end Gastone boards interconnected to the GIB Boards. Finally, the data are written to the storage disks. The data are then delivered to the ROD using Optical fibers connection. A VME CPU board collects data from the ROD and sends them to the Farm on-line system through TCP/IP Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 44

Test with 90 Sr Source (III)  S1-S12 HV Sectors  Source Scan positioning 90 Sr on each HV sector S1 S2S3S4S5S6S7S8S9S10S11S12 Unrolled Anode Foil: V-view Strips FEE Boards Source on S1 V-view Fired Strips S1 Source on S3 V-view Fired Strips S3 V-view Strips not illuminated with 90 Sr   Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 45

(1) CGEM prototype: test-beam MDTs Efficiency ε = 99.6% Spatial Resolution  (GEM) =  (250µm) 2 – (140µm) 2  200µm Gas: Ar/CO 2 = 70/30 Fields: 1.5/2.5/2.5 /4 kV/cm V GEM : =1140V, gain~2·10 4 [NIMA 604 (2009)] FEE: 16-channels GASTONE [NIMA 604 (2009)] Trigger: 2x8-MDT stations -- External Tracking 10 GeV pion beam CERN-PS T9 area [NSS Conf. Rec.(2009)] Proto0.1: Ø=300mm,L=350mm; 1538 axial strips, 650 µm pitch Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 46

(2) XV readout and magnetic field 40° X pitch 650 µm V pitch 650 µm 1000 µm A 10x10 cm 2 Planar GEM w/650 µm pitch XV strips has been realized and tested in magnetic field. The readout is a kapton/copper multilayer flexible circuit: X-view will provide r-φ coordinate in CGEM V-view: pads connected by internal vias and with ~40°stereo angle XV crossing will provide z coordinate in CGEM readout w/GASTONE FEE prototype X strip V pad vias common V backplane ground Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 47

(2) XV readout and magnetic field Ar/CO 2 =70/30 and B=0.5 T average Lorentz angle α L = 8°- 9°  The effect of the magnetic field is twofold: a displacement (dx) and a spread of the charge over the readout plane (effect visible only on the “bending plane”) Garfield Simulation dx = 700  m dx = 700  m  dx = 200  m Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 48

(2) XV readout : test beam Gas: Ar/CO 2 = 70/30 Fields: kV/cm V GEM : =1140V, gain~2·10 4 FEE: GEMs partially equipped with 22 GASTONE boards Trigger: 6 scintillators with SiPM (3 upstream, 3 downstream) External Trackers: 4 planar GEMs w/650 µm pitch XY strips  H4 beam-line at CERN-SPS: 150 GeV pions  Goliath Magnet: dipole field up to 1.5T in a ~3x3x1m 3  Semi-permanent setup for RD51 users BEAM X Y X-Y GEMs X-V GEM Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 49

(2) B-induced displacement i.Align the setup with B = 0 ii.Turn on B field iii.Track reconstruction using the 4 X-Y GEMs (likewise oriented) iv.Measure the displacement on the X-V GEM (reversed wrt the other GEMs) D = 2  dx D = 2  dx  tan(θ L ) = D ∕ 2r ( r = effective detector thickness)  In our configuration the magnetic field effect is mainly present on the X-view Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 50

(2) B-induced displacement  Distribution of dx = D (measured displacement)/2 as a function of B field The black open squares are from GARFIELD simulation Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 51

(2) Spatial resolution: X-view KLOE B - field CGEM r-φ resolution Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 52

(2) Spatial resolution : Y coordinate  The Y coordinated is measured from the crossing of X and V views CGEM z resolution KLOE B - field Erika De Lucia -- Symposium at Jagiellonian University, June Krakow 53

X Y The Large area planar prototype 300x700 mm using new singl- mask technique was tested at CERN-PS T9, equipped with the final X-V readout strips-pads Gas: Ar/CO 2 = 70/30 Fields: kV/cm V GEM : =1140V, gain~2·10 4 Final DAQ and electronics chain test External tracking: 4 planar GEMs, 650 μm pitch XY strips Trigger: 4 scintillators (2 upstream, 2 downstream) (3) Large area XV chamber 54 Erika De Lucia -- Symposium at Jagiellonian University, June Krakow