ComPASS all hands meeting, 10/05-06/2009 How Can ComPASS EM Codes Solve the SRF Problems at JLab? Haipeng Wang, ISRFST, Jefferson Lab Webex presentation.

Slides:



Advertisements
Similar presentations
Superconducting RF Cavities for Particle Accelerators: An Introduction Ilan Ben-Zvi Brookhaven National Laboratory.
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
RF Modeling efforts on Ion Source at SNS Sung-Woo Lee.
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Normal-Conducting Photoinjector for High Power CW FEL Sergey Kurennoy, LANL, Los Alamos, NM, USA An RF photoinjector capable of producing high continuous.
X-Ray Pulse Compression Using Deflecting Cavities - Studies at LBNL Derun Li Center for Beam Physics, LBNL LHC IR Upgrades Workshop FNAL, Chicago, IL October.
D. Li and R. Rimmer, RF Workshop, Fermilab, MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer* Lawrence.
DUAL FEED RF GUN DESIGN FOR LCLS Liling XIAO, Zenghai LI Advanced Computations Department Stanford Linear Accelerator Center Nov , SLAC-LCLS Injector.
SLAC is focusing on the modeling and simulation of DOE accelerators using high- performance computing The performance of high-brightness RF guns operating.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
Rong-Li Geng Toward Higher Gradient and Q 0 LCWS2013, U. of TokyoNov , 2013, R.L. Geng1.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
ICFA Mini-Workshop Daresbury, Sep. 1-3, 2010 SRF Crab Cavity Development at JLab for SPX Project of APS Haipeng Wang for the team of R. Rimmer, P. Kneisel,
Tungsten Calorimeter Model Calculations and Radiation Issues Pavel Degtiarenko Radiation Control Group, Jefferson Lab.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Study of Absorber Effectiveness in the ILC Main Linacs K. Bane, C. Nantista and C. Adolphsen SLAC, March 26, 2010 Goal: Compute the HOM monopole losses.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
JLAB waveguide couplers R. Rimmer for JLab SRF Institute.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
March 2, 2011 TJRPhysics Processes Missing from our Current Simulation Tools 1 Tom Roberts Muons, Inc. This is the current list − Please help us to complete.
Group 6 / A RF Test and Properties of a Superconducting Cavity Mattia Checchin, Fabien Eozénou, Teresa Martinez de Alvaro, Szabina Mikulás, Jens Steckert.
ILC Damping Rings Mini-Workshop, KEK, Dec 18-20, 2007 Status and Plans for Impedance Calculations of the ILC Damping Rings Cho Ng Advanced Computations.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Review 09/2010 page RF System for Electron Collider Ring Haipeng Wang for the team of R. Rimmer and F. Marhauser, SRF Institute and Y. Zhang, G. Krafft.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
HOM Studies: Beam Dynamics, Cavity-to-cavity coupling, multipacting, and field emission.
COMPASS All-Hands Meeting, FNAL, Sept , 2007 Accelerator Prototyping Through Multi-physics Analysis Volkan Akcelik, Lie-Quan Lee, Ernesto Prudencio,
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
UK-Jlab-TechX Designs for the LHC Crab Cavity Dr G Burt Lancaster University / Cockcroft Institute.
Multipacting Simulation for the Muon Collider Cooling Cavities* L Ge, Z Li, C Ng, K Ko, SLAC R.B. Palmer, BNL D Li, LBNL The muon cooling cavity for the.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ILC 07 May 30-June 3, 2007 N.Solyak 1 MULTIPACTORING SIMULATIONS IN CAVITIES AND HOM COUPLERS Nikolay Solyak, Ivan Gonin, Jiajian Li Fermilab.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Wakefield/Impedance Considerations for APS and LHC Crab Cavities Haipeng Wang Thomas Jefferson Lab, Newport News Virginia, USA ICFA Beam Dynamics Mini-Workshop.
Multipacting Simulation for the PITZ RF Photo Gun Igor Isaev Unwanted Beam Workshop 2012 Humboldt-University Berlin, The PITZ RF Photo Gun.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Laser heating and laser scanning microscopy of SRF cavities
Cost Optimization Models for SRF Linacs
G. Cheng, R. Rimmer, H. Wang (Jefferson Lab, Newport News, VA, USA)
Coupler RF kick simulations.
T5.2: Harmonization - Material and Component Reference
Odu/slac rf-dipole prototype
MICE RF Cavity Simulations and Multipactor
Objectives for experimental proposal (from Francois):
Summary, Working Group 4 Superconducting RF
Update of CLIC accelerating structure design
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
Physics Processes Missing from our Current Simulation Tools
Parallel 3D Finite Element Particle-In-Cell Simulations with Pic3P*
PARALLEL FINITE ELEMENT MODELING TOOLS FOR ERL DESIGN AND ANALYSIS
Cost Optimization Models for SRF Linacs
Introduction to Jefferson Lab
ERL Main-Linac Cryomodule
V. Akcelik, L-Q Lee, Z. Li, C-K Ng, L. Xiao and K. Ko,
Multipacting Simulation for the Muon Collider Cooling Cavities*
CEPC 650MHz High Efficiency Klystron R&D
Cryomodule design modifications for C75
Multiphysics simulations of impedance effects in accelerators
PARALLEL FINITE ELEMENT MODELING TOOLS FOR ERL DESIGN AND ANALYSIS
V. Akcelik, L-Q Lee, Z. Li, C-K Ng, L. Xiao and K. Ko,
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
ELIC: An Electron – Light Ion Collider based at CEBAF
Presentation transcript:

ComPASS all hands meeting, 10/05-06/2009 How Can ComPASS EM Codes Solve the SRF Problems at JLab? Haipeng Wang, ISRFST, Jefferson Lab Webex presentation to ComPASS all hands meeting, September 5-6, 2009 Review of original work plans on EM at JLab in ComPASS proposal As code users to work with code developers, how these work plans are addressed our SRF problems at JLab. Story telling how these codes have solved or to solve our BBU problems at CEBAF and FEL. Stress out the multipactoring, RF-thermal cooling, and ERL efficiency simulations and problem solutions in next two years.

ComPASS all hands meeting, 10/05-06/2009 Original ComPASS NP work plans on EM at JLab FY07 EM: Provide Low Loss cavity shape for the 12 GeV Upgrade for benchmark of Omega-3P, on its simulated modes, and heat generation due to the rf surface resistance by comparing to commercial codes, analytical estimates and experimental data. FY08 EM: Supply a 12 GeV CEBAF Upgrade SRF cavity design and measurement data for rf heat generation analysis and cavity thermal modeling for codes benchmark. Benchmark T3P and VORPAL simulations in short and long range wakefields with JLab SRF cavities’ simulations and measurement. Provide experimental data for 3D multipactoring analysis for VORPAL and Pic3P. FY09 EM: Benchmark self-consistent 3D multipactoring simulations against experimental data. Verify model of HOM damping against experimental data. Comparison of HOM power generated in the JLab FEL SRF cavities to VORPAL and T3P’s predictions. FY10 EM: Benchmark self-consistent low energy beam simulation against experimental data for a DC (or RF) gun in photoinjector. VORPAL or T3P is used to determine the effects of HOM heating on energy recovery in an ERL and the design of ELIC crab cavities. FY11 EM: Use VORPAL, Omega3P, T3P, Pic3P to design and optimize high gradient and high current SRF structures for ERLs, ELIC and injectors and to support the design of electron cooling for ELIC. Use VORPAL, Pic3P to simulate the performance of the photoinjector.

ComPASS all hands meeting, 10/05-06/2009 Actual funding was cut in half and cycles was one year delay FY07 EM: Provide Low Loss cavity shape for the 12 GeV Upgrade for benchmark of Omega-3P, on its simulated modes, and heat generation due to the rf surface resistance by comparing to commercial codes, analytical estimates and experimental data. FY08 EM: Supply a 12 GeV CEBAF Upgrade SRF cavity design and measurement data for rf heat generation analysis and cavity thermal modeling for codes benchmark. Benchmark T3P and VORPAL simulations in short and long range wakefields with JLab SRF cavities’ simulations and measurement. Provide experimental data for 3D multipactoring analysis for VORPAL and Track3P. FY09 EM: Benchmark self-consistent 3D multipactoring simulations against experimental data. Verify model of HOM damping against experimental data. Comparison of HOM power generated in the JLab FEL SRF cavities to VORPAL and T3P’s predictions. FY10 EM: Benchmark self-consistent low energy beam simulation against experimental data for a DC (or RF) gun in photoinjector. VORPAL or T3P and Pic3P is used to determine the effects of HOM heating on energy recovery in an ERL and the design of ELIC crab cavities. FY11 EM: Use VORPAL, Omega3P, T3P, Pic3P to design and optimize high gradient and high current SRF structures for ERLs, ELIC and injectors and to support the design of electron cooling for ELIC. Use VORPAL, Pic3P to simulate the performance of the photoinjector. Done, but not fully completed yet. Start to work on these.

ComPASS all hands meeting, 10/05-06/2009 Linkages between code users and code developers SRF Problems Multipactoring in cavity/coupler Dynamic Lorentz Force Detune (DLFD) Magnetic shielding in CM Pit/bump in H-enhancement Field Emission (FE) Thermal/magnetic quench HOM damping and power handling ERLs in ER efficiency klystron/IOT/magnetron design RF absorbers (SiC or ferrite) Field parameters to BCs Low temperature bake EP verses BCP ( and BEP) Design optimizations Cavity shape and FPC/HOM coupler choice Beam Breakup (or Mm/Mp BBU) sapphire loss in SRF cavity Non-relativistic, space-charge dominated BD in SRF gun Structure design optimization Functions Desired (in 3D) Solution accuracy nonlinear/lossy/anisotropic materials particle-field interaction with full Maxwell’s solution wake-impedance calculation multi-physics with EM mechanical (thermal, deformation, fluid dynamics) chemical (electro-physical-chemistry ) surface mophology (photo-electron, SEY, FE, RF vortices around pit/defect/GB, Cooper pairs formation) Inverse problem parameterized models Codes/platforms integration and automation User manual/interface friendly Particle tracking/in-cell in real fields Practical Examples Spherical cavities benchmark MP in TE011/crab and sapphire-loaded cavities C100/C50 CM shields SRF gun design HOM load designs Understood a BBU at CEBAF (Thanks to your ACD group) 4-spoke cavity design Multiple field effect on BD multi-beam excitation scheme of wakefield and impedance interpolation Surface pit/bump on Nb Cost reduction on HLRF of ILC Color code in SRF Problems: have been touched by commercial codes or ComPASS codes; Being or can be addressed by ComPASS codes; Simulations could help to understand experimental data

ComPASS all hands meeting, 10/05-06/2009 Cause Investigation-Inverse Problem R. Kazimi et al. EPAC 2008 paper PP087

ComPASS all hands meeting, 10/05-06/2009 Cause Investigation-Inverse Problem Z. Li, H. Wang et al. SLAC-PUB and JLab-TN , 2008 Feedback and lessen to learn: Better QA on cavity fabrication and dumbbell tuning Bead-pull/cavity tuning QA only fundamental but HOMs Full HOM QA in VTA before cryomodule assembly Confirmation: Bead-pulls on those defense cavities will be done very soon R/Qs can be calculated base on bead-pull data to compare predicted and experimental values Defense cavities are to be fully surveyed.

ComPASS all hands meeting, 10/05-06/2009 Benchmark on Spherical Cavity Models K. Tian, H. Wang et al, PAC2009 and ICAP 2009 papers. Analytical solution available in high accuracy Fixed mesh density to calculate up to 10HGz HOMs Code evaluated: Omega3P, VORPAL MWS, HFSS, ANSYS Single Sphere for surface H-field Double Sphere for surface E-field Relative Err.=|f sim -f a |/f a Relative Err.=||e sim |-|e a ||/ |e a |Relative Err.=||h sim |-|h a ||/ |h a | More data coming from Analyst and VORPAL

ComPASS all hands meeting, 10/05-06/2009 Pit, Hole, Bump and Grain Boundary on Trapped Vortices and H-field Enhancement G. Ciovati and A. Gurevich, PRST A&B, 11, (2008) V. Shemelin, H. Padamsee, TTC-Report h~ r n n=-1/3, C. Reece, SRF , Cornell University, 1984 h up to 3, J. Knobloch, SRF Workshop, 1999 h up to 5, V. Shemelin, TTC-Report , 2008 TE111 mode G. Ciovati & A. Gurevish V. Shemelin & H. Padamsee X. Zhao & A. Valente

ComPASS all hands meeting, 10/05-06/2009 Magnetic Shielding in Cryomodule Design G. Cheng et al. JLab-TN , 2008 ANSYS simulations for nonlinear magnetic material: B-H curve, temp. material dependent. 20 mils shield thickness verses 9 meter long shield In the 3-D linear model, when an axial external field of 2 Gauss is applied, it is found that the flux density in the outer shield exceeds the saturation limit of 8,000 Gauss. An H-field survey on Renascence cryomodule has been done and the experimental data do not agree with simulation data. C50 cryomodules have lower Q 0, could blame to magnetic shield or dogleg RF waveguide loss on copper coating or ceramic window eye lid. See a typical cavity’s graph on Q 0 vs. E acc. QA programs are implemented. Both simulation and measurement could not tell us the true story.

ComPASS all hands meeting, 10/05-06/2009 Multipactoring Simulations in SNS HOM Coupler J. F. Deford, Breakdown Workshop, Boulder, CO, Aug. 10, 2009 Lixin Ge, ICAP 09 Conference, San Francisco, CA, Sep. 3, 2009 Chet Neiter, and Peter Stoltz, Tech-X, MP simulations on waveguides and cavities by VORPAL Excellent mulations and movie revealed a great detail of this MP for understanding The ultimate goal is not to remove the HOM coupler from high beta cavities at SNS although it is feasible, but to avoid it in the design Other projects like ADSs might follow.

ComPASS all hands meeting, 10/05-06/2009 RF-Thermal Management Problems in Renascence Cryomodule C Reece et al. SRF 2007 paper WEP62. We are currently working on VORPAL and TEMP3P to address this challenge Not only through SciDAC but also SBIRs.

ComPASS all hands meeting, 10/05-06/2009 Long-rang Wakefield and Impedance Calculations H. Wang et al. ERL 2007, PAC 2007 paper WEPMS070. Multiple beam wake excitation scheme. F. Marhauser et al. PAC 2009 paper FR5PFP094, ERL Impedance spectrum extrapolation method. Set up field (power) monitors on WG ports can let us do the HOM load design and ERL efficiency calculation.

ComPASS all hands meeting, 10/05-06/2009 HOM Load Design and Measurement for High Current Structures H. Wang et al. PAC 2007 paper WEPMS070. F. Marhauser et al. PAC 2009 paper WE6RFP009. CEBAF HOM load at 2K Wakefield solver with lossy materials can let us design a real HOM load

ComPASS all hands meeting, 10/05-06/2009 Summary SRF problems challenge many expects of the current state of art ComPASS EM simulations Both software and hardware developments need advanced models and algorisms Simulation itself, by its limitation, can not replace our R&D experiments. But it can help to understand our data and guide our R&D works and designs. Cryomodule engineering design and structure integration definitely need multi-physics simulations to work and to be benchmarked. SCiDAC ComPASS is a right vehicle to meet those challenges but is less funded to the NP program. JLab needs ComPASS’s expert codes and their supports and running them on our local clusters and at NERSC. We need stress out the simulation solution for multipactoring and rf-thermal problems not from CST-PS or ANSYS but from ComPASS codes in next two years.