ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.

Slides:



Advertisements
Similar presentations
The Rossway Safeway Roof Safety Protection system is installed on top of roof purlins. The Rossway Safeway system consists of a platform deck with handrail.
Advertisements

Fuel On Board Michael Dreher-Byrd - Robert Fulling - Melissa Davis - Matthew Plourde.
 After the 7 transactions, the ledger looks like Page 105 Figure 4.5. (Show On the White board)  There are 10 accounts in the ledger.  How do you calculate.
A-ABLE SEPTIC-SEWER SERVICE, INC. MOUND SYSTEM MOUND SYSTEM.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Find the HCF and LCM When finding the HCF and LCM of relatively low/easy numbers we can use the methods that we are used to such as find the HCF and LCM.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
Is this book right for me?
Monday, February 22 nd Agenda  Collect Worksheet: “Muscles and Work”  Finish Section 8.1: Work, Power, and Machines  Work input, work output, mechanical.
The building. The crane The crane lifted the big beams into the building. First they got a small crane then because it was too small they got a bigger.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 Installation of Delphi Frame  ITS Installation.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
Final Presentation of the Folding Three-Wheeler May 17, 2007.
Pinwheel Technologies (C3)
The WA105 17m3 LArCryostat pre-experience M.Ne. Status Tender done for the membrane part, 1 German firm selected A lot of time wasted to renegotiate the.
Somerset College Safety, Health and Environment Toolbox Talk: Manual Handling.
WorldFIP optical repeaters 1 | status Feb 2013: 66 repeaters ordered to HLP; never delivered Feb 2014: HLP announced eminent closure Jun 2014: 40 of the.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Pulleys Simple Machines.
Expanding Binomials 0-2. Different Ways of Multiplying Binomials FOIL Traditional/Regular Multiplying Seperate and Distribute Separate and Distribute.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
3 x 5 means… 3 “lots of” 5 3 x 5 means… 3 “lots of” = 15.
Math 110: Pre-Calculus 11 When you first arrive in class: –If you have any questions about the homework please put the question #’s on the board If someone.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
What did you learn about electrical work in the last class?? On page 65 fill in the blanks using complete sentences/thoughts. Now I know That ________________.
INFORMATION X INFO415: Systems Analysis Systems Analysis Project Deliverable 1 Project Statement of Work Outline.
 “Small meeting” – invitation only  All plenary  I want the people who come to get a good feeling for some of the details of global LARP activity 
Specifications for JOOLZ 409- based on the current prototype (as taken by AOK)
OPERATIONS IN SCIENTIFIC NOTATION Performing scientific surgery…
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
Wates CBE Learning Build: Plant interactive.
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
Math 010 online work that was due today at the start of class: Gateway Homework #2 (turn in worksheet now, while I take roll) Section 1.4/1.5 Online Homework.
Architecture By Brian Hartman. The math studies to become an architect can include Geometry, Trig, Calculus, Engineering, and Computer modeling.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Textured Pinch Project
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
ZDC CRANE PROJECT Y. Onel September 28, Progress since last meeting Our Mock-up is found at CERN, inspected by CERN Engineering and found satisfactory.
Spider diagram. investigate Put brochures Develop a design brief Explain the requirements Explain what types of people do sports.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Building and Solving Complex EquationsProjector resources Building and Solving Complex Equations Projector Resources.
Building and Solving Equations 2Projector Resources Building and Solving Equations Projector Resources.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
1 Introduction to Engineering Spring 2007 Lecture 4: Engineering Design II.
BSHS 302 Week 2 Learning Team Write an outline together for the Learning Team assignment due in Week 3 Check this A+ tutorial guideline at
SX1 manipulation VERSION 1 Version
INSTALLATION SEQUENCE
SCHEDULE Nov 1st - Assembly Table Complete
GOVERNMENT ENGINEERING COLLAGE DAHOD DEPARTMENT:- MECHANICAL ENGINEERING SUB:- Manufacturing Process 2 Topic :- Shaping And Forming Of Glass Prepared by:-
مفاهیم بهره وري.
C140 Navigation System Upgrade Manual
RDR Baseline Layouts for Interaction Region
Front Suspension Design
DBQ assignment.
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
C140 Navigation System Upgrade Manual
Presentation transcript:

ZDC Crane Status 9 Feb 2012, Michael Murray

Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before the crane can be installed it must be tested on a platform at SX5 This platform was finished today so Paul can now put the crane together There is still a lot to do and Paul is not sure that he can have a test by 18 th or so.

Sarcos The feet of the sarcophagi were designed for hand transpallets but forklift had wider feet. The feet are being modified. Sarco 3 is at SX5. The inner mold used to support the slot when the concrete is poured is too difficult to remove. We are modifying this to make it easier to take out Sarco 4 coming

Documentation Most of the required documents exist at least in outline form but we need some input from Paul on the lifting mechanism and the rotating carrage Paul also needs to send all the FEA calculations to CERN engineers to review Finally we can check our radiation calculations against measurements of the ZDC activation. This work is ongoing.