Alternatives Concepts White Paper IPT 02E. Project Management The University of Alabama Huntsville Team LeaderEddie Kiessling StructuresNathan Coffee.

Slides:



Advertisements
Similar presentations
Clarkson University. Physics, Chemistry, Calculus English Course, History, Technical, Economics Physics Modern Physics Quantum Mechanics Solid State Physics.
Advertisements

AMY BARTLETT NASA MESSENGER FELLOW RAYMOND S. KELLIS H.S. MARE GILMORE, M.Ed. LIED CHILDRENS MUSEUM L.U.N.A.R. Eggs-Prize Landing Unique Navigable Astronaut-Controlled.
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Public.
1 Pacific International Science Center for Exploration Systems (PISCES) Conference – Nov 12, 2008 Commercial Lunar Business Perspectives John Kohut Chief.
VI. Descent and Terminal Guidance for Pinpoint Landing and Hazard Avoidance Session Chair: Dr. Sam W. Thurman.
MAE 491/492 Integrated Product Team Design Examples Bringing the Real World into the classroom.
Lunar Advanced Science and Exploration Research: Partnership in Science and Exploration Michael J. Wargo, Sc.D. Chief Lunar Scientist for Exploration Systems.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
Project X pedition Spacecraft Senior Design – Spring 2009
Earth-Moon Transport Doroteo Garcia Kazuya Suzuki Patrick Zeitouni.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
Summary Description of Previous Studies Study NameDateSummary Description Exploration Office Case Studies NASA's Office of Exploration did four.
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Public.
UPC TEAM Ferran Casulleras Gisela Detrell Sergio Mainar Miguel Angel Villarejo Meritxell Viñas Didac Zorita Miquel Sureda (prof.)
Understand how space organizations use concepts of operations and system integration plan to ensure the success of their program Space Concept of Operations.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Command and Data Handling (C&DH)
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08.
Lunar Drilling and Driving Carnegie Mellon December 2007 Red Whittaker.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
Alternatives Concepts White Paper IPT 02E. Project Management The University of Alabama Huntsville Team LeaderEddie Kiessling StructuresNathan Coffee.
AAE450 Spring 2009 Final Slide Concepts March 26, 2009 [Cory Alban] [Mission Ops] [Locomotion] 1.
AAE450 Spring 2009 Slide 1 of 7 Final Presentation Slides Ian Meginnis April 9, 2009 Group Leader - Power Systems Phase Leader - Translunar Injection OTV.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
Final Report on LOW Design Maximizing Science While Minimizing Single Point Failure.
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Questions.
RASC-AL 2010 Topics. TECHNOLOGY-ENABLED HUMAN MARS MISSION NASA is interested in eventual human mission to the Martian surface. Current Mars design reference.
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
DemoSat II Colorado Space Grant Consortium Design (EPICS) Division Colorado School of Mines Golden Colorado Critical.
Chapter 13 Section 3 – pg 515 Exploring Space Today.
M. A. R. S. Mars Aerial Reconnaissance Simulation.
Lunar Exploration Transportation System (LETS) Customer Briefing LETS go to the Moon!
Apollo 50 Lunar Mission Concept Goal: Initiate a series of lunar campaign missions, inspired by Apollo 11, to explore the potential of the Moon for science.
Payload Concept Review [Team Name Here] [High School Name Here] 1 [Team logo here]
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Questions.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
Crew Mobility for Lunar Surface Exploration Dr. Rob Ambrose NASA-JSC May 2008.
Hopper Spacecraft Simulator. The “Hopping” Concept -Land on a celestial body using engines, conduct surface operations, then re-ignite engines and ‘hop’
Phases of the Moon and Eclipses LunarPhasesanhdEclipseAnimate.ppt.
AAE450 Spring 2009 Lunar Night and Lander Power System Adham Fakhry February 26th, 2009 Power Group Lunar Descent Phase Passive Thermal Control for Lunar.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
A&AE 450 – Senior Design Team ERV Science and communication January 23, 2000 Christopher Burnside.
LETS Phase 2 Review 3/6/08. Agenda Team Introduction Overview of Design Process Initial Mass and Power Budgets Trade Tree and Trade Study Concept Overviews.
Project Introduction Spring InSPIRESS Challenge 2 Design an autonomous science payload for the Titan Environmental and Atmospheric Measurement (TEAM)
Lunar Exploration Transportation System (LETS) Team Frankenstein Phase 2 Presentation 3/6/08.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Session Chair: Dr. Sam W. Thurman
[Team Name Here] [High School Name Here] [Team Number Here]
Technical Resource Allocations
Requirements, Alternatives, & ConOps
Payload Concept Review
LETS Phase 3 Review 4/29/08.
Mars Sustainability Workshop Kennedy Space Center February 8, 2018
Lunar Exploration Transportation System (LETS)
Lunar Exploration Transportation System (LETS)
LETS Phase 3 Review 4/29/08.
100 g Locomotion Thursday March 26, Ryan Lehto Propulsion Group
Team P15441 Mini Air Sub-System Design Review
Project Introduction Spring 2017.
Alternatives Concepts White Paper IPT 02E
Final Report on LOW Design
Presentation transcript:

Alternatives Concepts White Paper IPT 02E

Project Management The University of Alabama Huntsville Team LeaderEddie Kiessling StructuresNathan Coffee Systems EngineerJay Gala GN & CBrandon York GN & CJoseph Sandlin OperationsBrett Guin ThermalKathryn Kirsh ThermalEddie Kiessling Payload OperationsBrent Newson PowerChristopher Goes Technical EditorMichael Bryan

Overview This Whitepaper seeks to establishes team roles, develop two alternative designs, and select one design as the final concept to take into Phase 3. The Viking Lander, the baseline design, for this project was compared to a Lander on Wheels (LOW) and a Lander with a Single Rover (LSR). Each concept was weighted against each other and utilizing Weighted Factor Analysis and Concept Evaluation Matrix to choose a final design. –Our results will show that the Lander on Wheels would be the best approach.

Technical Description Overview of Phase 2: –Deliverable Items: White Paper –Summarizes the strategy for selecting alternative systems –Qualitative/quantitative information to evaluate each idea –Logical rational for down selecting one concept among the three concepts Oral Presentation –Summarizing information from the White Paper to present to the review board.

Technical Description Specification Summary –Level 1 Requirements Housed within an Atlas V-401 EPF Shroud Total Landed Mass – kg Launch Date – NLT September 30, 2012 Survivability Time of 1 Year Attain a slope of 12º Polar Landing as well as other Lunar Landings Land Precision +/- 100m 3σ Maneuverability SMD to ESMD

Specification Summary –Critical Requirements Launch Date Mass SMD to ESMD ratio Landing Capabilities Mobility

Team Eclipse Approach to Phase 2

Description of Concepts 3 Concepts –Viking Lander (Baseline Design) –Lander on Wheels (Concept 1) –Lander + Rover (Concept 2) Selection Process –Advantages and Disadvantages –Weighting of FOMs –Analysis and Comparison Concept Chosen: Lander on Wheels (Concept 1)

Boost Matrix for Project 02

02-BL “Viking” Availability of Data Martian Surface Single Site Science Mission Subsystems –Thermal Active & Passive –Structural Parachute, Bio-shield, & Aero-decelerator –Redundant Communications –Power RTGs & Nickel-Cadmium Batteries –Guidance, Navigation, and Controls Three Axis Gyros and Accelerometer & Redundant x-axis system.

02E-ALT1 “Lander on Wheels” Power System –2 RTGs (output of 1400 W) Thermal Systems –Heating – Excess energy from RTG –Cooling – Moon’s environment Structure –Titanium –8 Wheel Rocker Bogey Configuration Operations –Communicate with LRO & Earth at Direct LOS GN & C –Landing Hazard Avoidance –Travel to Scientific Sites Payload –Scientific Equipment –SRV

02E-ALT2 “Lander + Rover” Power System –Lander: 1 RTG (output of 700 W) –Rover: Rechargeable battery system Thermal Systems –Lander: Heating – Excess energy from RTG –Rover: Heating – Energy from battery system –Lander and Rover: Cooling – Moon’s environment Structure –Lander: Titanium –Rover: Composite Operations –Communicate with LRO & Earth at Direct LOS GN & C –Lander: Landing Hazard Avoidance –Rover: Travel to and from Scientific Sites Payload –Scientific Equipment –Rover –SRV

Selection of Final Concept Criteria selection (in order of importance) –Technology Ratio –ConOps –Objectives Completed –Percent Payload –Surface Objectives Completed –Percent Power System Chosen Concept –Lander on Wheels (Alternative Concept 01)

Illustrations 02-BL “Viking”

Illustrations 02E-ALT1 “Lander on Wheels”

Illustrations Shroud Configuration

Video

Illustrations 02E-ALT2 “Lander + Rover”

Engineering Summary

Concept Evaluation Matrix

Phase 3 Plan Key Issues –Power Supply –Single Site Goals Issue –Finalize Mobility Concerns Tasks for Partner Universities –Southern University Rocker Bogie Suspension System CAD Model of Mobility System –ESTACA University Design of SRV Propulsion System CAD Model of SRV

Review Technical Description Description of Concepts Selection of Final Concept Phase 3 Plan