FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work Package 2 Roberto Barbera EELA Technical Coordinator INFN - Univ. of Catania On behalf of Diego Carvalho Pilot Test-bed Operations and Support Manager Cuban Workshop - 28 May 2007
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Outline e-Infrastructure activities EELA PKI EELA Grid Conclusion
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Pilot Test-bed coordination –management set up & coordination –project execution plan Authentication and Authorization –implementation, operation and support of required Certification Authorities (CA) –international CA coordination –set up of Virtual Organisation (VO) infrastructure and maintenance Overview of activities - 1/2
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Operations –installation of the pilot Test-bed –Test-bed operation and monitoring –definition and implementation of Security Policies & Protocols Network –survey of application requirements –feasibility study of new network service offerings –monitoring of network performance –deployment of new integrated monitoring infrastructure Overview of activities - 2/2
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Deployment of 6 CAs: Brazil Catch-all Argentina Chile Mexico Venezuela Milestone - M2.2.1 Latin America Certification Authority Operational - M07
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Authentication Infrastructure Before EELA CA fully accredited EU “catch-all”
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Authentication Infrastructure right after the EELA Start-up CA fully accredited EU “catch-all” RA
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May EELA Certification Authorities Deployed Now CA fully accredited LA “catch-all”, depl. deployed in preparation CA RA fully accredited EU “catch-all”
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Milestone - M2.3.1 Pilot Test-bed Operational - M07 Six months before due time 5 partners 4 Resource Centres (RC) Top Level BDII, LDAPs, Resource Brokers, etc 600 Jobs RedCLARA - Géant traffic rate on – LA-Europe is in Blue ALICE Link
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May EU e-Infrastructure Experiences of EELA Partners Before the Start-up T-I RC RC = Resource Center T-I = t-Infrastructure Center
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metric 4/16 (cont) Evolution of the number of sites integrating the e- Infrastructure
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May RC T-I The EELA Pilot Test-bed Now 1 RC 5 RC 1 RC 2 RC 1 RC 2 RC 1 RC stand-alone grid site RC = Resource Center T-I = t-Infrastructure Center
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metric 4/16 Number of sites participating in the Pilot e-Infrastructure Production sites (10) – 6 in Europe – 4 in Latin America Certification (8) – 2 in Europe – 6 in Latin America EELA has two Test-beds: Certification - sites under validation Production - available to users EELA uses the same certification process as EGEE
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metric 5/16 Resources integrated into the Test-bed Production sites (source GStat) CPU Slots evolution Storage Capacity evolution
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metric 6/16 Statistics of use of the Pilot Test-bed Successful jobs ~ 120 K jobs ~ 160 CPU years Failure rate: 15% ** Expected load: K Jobs
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Milestone - M2.2.2 EELA VO infrastructure Operational - M07 EELA AUP VOMS and LFC Servers LA’s User Interfaces
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metric 12/16 Number of EELA VOs and evolution of the number of users Two distinct VOs: EELA and EDTEAM Two HEP VOs: ALICE and LHCb Resource Centres may support other VOs EELA and EDTEAM VOMS Statistics more than 60 users
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Milestone - M2.3.2 Pilot Test-bed monitoring and Security Policies operational - M12 Monitoring Tools SAM, GStat, GridICE, Real Time Grid Monitor EELA contributed with the SAM Dashboard Security Security Executive Body (SEB) Security Staff Body (SSB) Security Policies & Protocols
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May the most comprehensive application survey the most thorough LA network analysis infrastructure application requirements Milestone - M2.4.1 Network Studies - M12
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metric 1/16 Expertise –only UFRJ, CIEMAT, CERN and INFN had prior experience with EGEE middleware –specific training program and documentation –Regional Operation Centre tutorial (ROC-on-duty) –net result: our documents are accessed worldwide Geomap of EELA GOC access Nov 2006
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metric 9/16 Number of queries issued and solved by EELA Helpdesk support tickets 60 solved tickets (81.1%) 14 in hold Future integration with Network Helpdesk escalation up to EGEE
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Proportion of special activities successfully supported by the Pilot Test-bed Metric 8/16 EELA Kick-of-meeting Lisbon EU-LAC Summit first EELA Conference ROC-on-duty tutorial 3 tutorials 3 data challenges first EELA grid school - (Stand Alone Grid) WP2 fulfilled 100% of 2006 requests EGRIS logistics
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metrics 13/16 Major network requests handled Enabling of International routing for high speed access to RCs in Rio de Janeiro Enhancement of End-to-End Performance –Tuning of TCP/IP streams over Fat Pipes Specific setups for events –EU-LAC Summit (dedicated connection to NREN) –1st EELA Conference Bandwidth increase for data challenge VPN providing connection to EELA network infrastructure – 3rd Tutorial – EGRIS (stand-alone-grid) and other specific actions
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Metric 14/16 Requests of Advanced Network use from the e- Infrastructure (implementation and monitoring) TCP/IP streams over Fat Pipes (RedCLARA/GÉANT2 link) perfSONAR monitoring system
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Conclusions
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May Conclusions WP2 Global highlights –Setup of a Pilot Test-bed with 5 sites (only 3 sites were committed in TA and 6 months before the expected date) –After 1 year: 16 integrated sites ( > 1 site/month) –Over 150 CPU.year delivered –EELA Public Key Infrastructure is a landmark in LA –2 EELA VOs and support for several EGEE VOs –Network studies providing the full picture of network characteristics for future application deployment
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May