Long Term Study Scenarios and Generation Expansion Update December 7, 2012.

Slides:



Advertisements
Similar presentations
Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
Advertisements

Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Direct Use of Natural Gas. Tampa Electric Peoples Gas.
ERCOT PUBLIC 10/21/ LTSA Scenario Results Update October, 2014.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
Andrew Scanlon Environment and Sustainability Manager Hydro Tasmania Drought and Climate Change.
ERCOT PUBLIC 2/14/ LTSA Scenario and Data Assumptions February 14, 2014.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ENERGY MARKET PERSPECTIVE
ERCOT PUBLIC 6/17/ LTSA Scenario Results June, 2014.
Renewable Energy Project Economics, Policy and Incentives NARUC Staff Subcommittee on Accounting and Finance October 8, 2007 Dr. Lola Infante Manager,
Great Lakes Energy and Water: An Examination of Future Power Generation Scenarios and Water Resource Impacts Vincent Tidwell and Barbie Moreland Sandia.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
2016 LTSA Scenario Assumptions
Updates on the RFE Energy Sector and the RFE LEAP model, and Implications of a Regional Alternative Path for the Russian Far East Victor Kalashnikov Economic.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions-Updated April 22, 2014.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
ERCOT PUBLIC 4/22/ RTP Inputs and Assumptions April 22, 2014.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
March 1, 2011 Load Analysis Update Calvin Opheim Manager, Load Forecasting and Analysis.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
ERCOT PUBLIC 7/14/ Model Data Assumptions Doug Murray ERCOT Sr. Planning Analyst LTSA Scenario Development Workshop July 14, 2015.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
PJM©2015 Updates to PJM Load Forecast Model OPSI Annual Meeting October 12, 2015 Tom Falin Manager – Resource Planning
2016 Long-Term Load Forecast
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
ERCOT PUBLIC 12/15/ LTSA Scenario Update Doug Murray ERCOT Sr. Planning Analyst December 15, 2015.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
Water Sustainability in the United States With a Focus on Power Generation Cooling Water Requirements Sujoy Roy, Karen Summers, and Robert Goldstein Tetra.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Power Supply Transformation IEPA 2013 Annual Meeting September 27, 2013 January 2013.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
NPC Industrial Demand Group Study Summary Ray Ratheal 8/19/2010.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
Hybrid Forecast for Resource Adequacy Analysis with recommendations Massoud Jourabchi April
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
LTSA Scenario Development Workshop
Economic Forecast Review
“Other” Cost Estimates
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Technical Committee Meeting March 18, 2016
Presentation transcript:

Long Term Study Scenarios and Generation Expansion Update December 7, 2012

2 Drought Scenario(s) December 7, 2012 Premise: A long-term drought would begin in 2018 and last for about 6 years Three major adjustments made to the data for this scenario ‒ Capacity reductions were made to existing generation due to lack of water or high intake/discharge water temperatures ‒ Increase costs of water were added to new thermal expansion generating units ‒ Forecasted load used Moody’s base economic assumptions with ERCOT’S 2011 load shape Additional sensitivities were added to the drought scenario so the impact of water issues could be seen in isolation ‒ Sensitivity 1 removed the PTC and removed the emission costs (S5A) ‒ Sensitivity 2 removed the PTC, removed the emission costs and reduced the EIA reference gas price by $2 MMBtu (S5B)

3 Drought Scenario(s) December 7, 2012 Black and Veatch (B&V) reviewed the Sandia work and the following information to estimate generating unit capacity reductions: Water Supply Availability ‒ Evaluation of rainfall patterns on an annual and monthly basis ‒ Single-year and multi-year drought scenarios ‒ Reservoir/lake levels and withdrawals out of those reservoirs Surface water temperature for lake-cooled supplies Cooling Technology

4 Drought Scenario(s) December 7, 2012 Example capacity derations for multi-year drought

5 Drought Scenario(s) December 7, 2012 Water costs by weather zone were estimated by B&V by analyzing: Current water costs by weather zone ‒ Agricultural/Raw water – low cost ‒ Water Authority wholesale or basic treatment ‒ Municipality potable treated water or reuse – High cost Estimate of infrastructure availability (will additional infrastructure be required if new water source is required) ‒ Urban/water source rich areas – low cost ‒ Rural/water source poor areas – high cost Weather patterns ‒ High Rainfall (East, Coast) – low cost ‒ Mid (Central and Southern) ‒ Low rainfall (West, Far West) – high cost

6 Drought Scenario(s) December 7, 2012 From the Initial B&V review ERCOT was divided into three water regions. Existing generating stations are also shown

7 Drought Scenario(s) December 7, 2012 In general, results have shown that large amounts of wind and solar generation are built in scenarios that include the PTC, emission costs and/or high natural gas prices. Results of S5A include 13,000 MWs of additional wind and 11,000 MWs of solar and 16,690 MWs new NG generation Results of S5B, which has a lower NG price, only 5,500 MWs of new wind is being built and most of that is not built until 2032 when the price of NG exceeds $6.00 MMBtu. 19,695 MWs new NG generation were also added Early results of S5C substantial amounts of both wind and solar are being built

8 Drought Scenario(s) December 7, 2012 Both S5A and S5B indicate that the natural gas price needs to be greater than $6.00 MMBtu for wind to be economical

Summary of Scenario Results December 7, 2012 *These retirements resulted from the economic retirement process based on profitability, age, and efficiency. All scenarios with the exception of BAT Retirements include the updated wind shapes from AWS TruePower.

10 Comparison of Results: 2032 Generation Breakdown December 7, 2012 As increasing amounts of wind, solar and geothermal proved to be economical, the amount of energy provided by renewables increased from 13% in the BAT w/ Retirements scenario to 63% in the Environmental Scenario.

11 Remaining Scenarios Drought S5C – Original Drought Scenario, About 50% complete BAU All Tech with the PTC, 20% complete Environmental with EE and DR mandates BAU All Tech with increased Asynchronous Ties December 7, 2012

12 APPENDIX December 7, 2012

13 Drought S5A December 7, 2012

14 Drought S5B December 7, 2012