McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.

Slides:



Advertisements
Similar presentations
Scheduling.
Advertisements

Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
Operations Scheduling
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Chapter 16 Scheduling Scheduling
Short-Term Scheduling
Operations Management
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Operations Management R. Dan Reid & Nada R. Sanders
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
1 Lecture 5 Linear Programming (6S) and Transportation Problem (8S)
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Scheduling – Day 2. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material.
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
JIT and Lean Operations
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Industrial Systems Engineering Dept. İzmir University of Economics
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1. Facility size 2. Equipment procurement Long-term
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling Operations Scheduling Chapter Scheduling The Hierarchy of Production Decisions The logical sequence of operations in factory planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
1 Chapter 10 Scheduling 1 Chapter 10 SCHEDULING McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Seminar exercises Process and Production Management.
Scheduling. Scheduling of Operations A planning tool for the short term  Provides an opportunity to make use of new information as we approach real time.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 16: Learning Objectives Instructor Slides You should be able to: 1.Explain what scheduling involves and the importance of good scheduling 2.Describe.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
15 - 1© 2014 Pearson Education, Inc. Short-Term Scheduling PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition.
Chapter 15 Scheduling McGraw-Hill/Irwin
assemble-to-order (ATO) A system that produces standard modules to be
Chap 11 Learning Objectives
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Production and Operations Management
Scheduling Seminar exercises
Presentation transcript:

McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling

16-2 Learning Objectives  Explain what scheduling involves and the importance of good scheduling.  Discuss scheduling needs in high-volume and intermediate-volume systems.  Discuss scheduling needs in job shops.

16-3 Learning Objectives  Use and interpret Gantt charts, and use the assignment method for loading.  Discuss and give examples of commonly used priority rules.  Describe some of the unique problems encountered in service systems, and describe some of the approaches used for scheduling service systems.

16-4  Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization  Effective scheduling can yield  Cost savings  Increases in productivity Scheduling

16-5 High-Volume Systems  Flow system: High-volume system with Standardized equipment and activities  Flow-shop scheduling: Scheduling for high- volume flow system Work Center #1Work Center #2 Output

16-6 Build A A Done Build B B Done Build C C Done Build D Ship JANFEBMARAPRMAYJUN On time! Scheduling Manufacturing Operations High-volume Intermediate- volume Low-volume Service operations

16-7 High-Volume Success Factors  Process and product design  Preventive maintenance  Rapid repair when breakdown occurs  Optimal product mixes  Minimization of quality problems  Reliability and timing of supplies

16-8 Intermediate-Volume Systems  Outputs are between standardized high- volume systems and made-to-order job shops  Run size, timing, and sequence of jobs  Economic run size:

16-9 Scheduling Low-Volume Systems  Loading - assignment of jobs to process centers  Sequencing - determining the order in which jobs will be processed  Job-shop scheduling  Scheduling for low-volume systems with many variations in requirements

16-10 Gantt Load Chart  Gantt chart - used as a visual aid for loading and scheduling Figure 16.2

16-11  Infinite loading – jobs are assigned to work centers without regard for the capacity of the work center.  Finite loading – jobs are assigned to work centers taking into account the work center capacity and job processing times  Vertical loading  Horizontal loading Loading

16-12 Loading (cont’d)  Forward scheduling – scheduling ahead from some point in time.  Backward scheduling – scheduling by working backwards in time from the due date(s).  Schedule chart – a form of Gantt chart that shows the orders or jobs in progress and whether they are on schedule.

16-13 Sequencing  Sequencing: Determine the order in which jobs at a work center will be processed.  Workstation: An area where one person works, usually with special equipment, on a specialized job.

16-14 Sequencing  Priority rules: Simple heuristics used to select the order in which jobs will be processed.  Job time: Time needed for setup and processing of a job. Everything is #1 Priority

16-15 Priority Rules  FCFS - first come, first served  SPT- shortest processing time  EDD - earliest due date  CR - critical ratio  S/O - slack per operation  Rush - emergency Top Priority Table 16.2

16-16 Assumptions of Priority Rules  The setup of jobs is known  Setup time is independent pf processing sequence  Setup time is deterministic  There will be no interruptions in processing such as:  Machine breakdowns  Accidents  Worker illness

CR EDD SPT FCFS Average Number of Jobs at the Work Center Average Tardiness (days) Average Flow Time (days)Rule Example 2 Table 16.4

16-18 Two Work Center Sequencing  Johnson’s Rule: technique for minimizing completion time for a group of jobs to be processed on two machines or at two work centers.  Minimizes total idle time  Several conditions must be satisfied

16-19 Johnson’s Rule Conditions  Job time must be known and constant  Job times must be independent of sequence  Jobs must follow same two-step sequence  Job priorities cannot be used  All units must be completed at the first work center before moving to second

16-20 Johnson’s Rule Optimum Sequence 1.List the jobs and their times at each work center 2.Select the job with the shortest time 3.Eliminate the job from further consideration 4.Repeat steps 2 and 3 until all jobs have been scheduled

16-21 Scheduling Difficulties  Variability in  Setup times  Processing times  Interruptions  Changes in the set of jobs  No method for identifying optimal schedule  Scheduling is not an exact science  Ongoing task for a manager

16-22 Minimizing Scheduling Difficulties  Set realistic due dates  Focus on bottleneck operations  Consider lot splitting of large jobs

16-23 Theory of Constraints  The Theory of Constraints Goal is to maximize flow through the entire system  Emphasizes balancing flow  Improve performance of bottleneck:  Determine what is constraining the operation  Exploit the constraint  Subordinate everything to the constraint  Determine how to overcome the constraint  Repeat the process for the next constraint

16-24 Theory if Constraints Metrics  Throughput – the rateat which the system generates money through sales  Physical assets – the total system investment  Inventory  Buildings and land  Plant and equipment  Operating expense – money the system spends to convert inventory into throughput

16-25 Scheduling Services Considerations  Scheduling services different from manufacturing  Inability to store or inventory services  Random nature of customer requests for service  Point of customer contact  Back-office operations  Front-office operations

16-26 Scheduling Services  Appointment systems  Controls customer arrivals for service  Reservation systems  Estimates demand for service  Scheduling the workforce  Manages capacity for service  Scheduling multiple resources  Coordinates use of more than one resource

16-27 Yield Management  Yield Management – the application of pricing strategies to allocate capacity among various categories of demand.  The goal is to maximize the revenue generated by the fixed capacity  Fixed capacity  Hotel, motel rooms  Airline seats  Unsold rooms or seats cannot be carried over

16-28 Cyclical Scheduling  Hospitals, police/fire departments, restaurants, supermarkets  Rotating schedules  Set a scheduling horizon  Identify the work pattern  Develop a basic employee schedule  Assign employees to the schedule

16-29 Service Operation Problems  Cannot store or inventory services  Customer service requests are random  Scheduling service involves  Customers  Workforce  Equipment