January 2013 Action Plan Skills Building: Module 3 Planning the Details: Activities, Timelines, Resources, and More.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Teaching Students Project Management Dr. Bill Oakes, EPICS Director Pamela Dexter, EPICS High School Coordinator 2011.
Introduction to Monitoring and Evaluation
Facilitated by Joanne Fraser RiverSystems
Action Plan Skills Building: Module 2 Defining Action Plan Purpose and Scope January 2013.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project Management.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Software project management Module 1 -Introduction to process management Teaching unit 1 – Introduction Ernesto Damiani Free University of Bozen-Bolzano.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
Action Implementation and Monitoring A risk in PHN practice is that so much attention can be devoted to development of objectives and planning to address.
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
© 2008 by Prentice Hall 1 Chapter 2. © 2008 by Prentice Hall 2 Project – a planned undertaking of related activities to reach an objective that has a.
Project Time Management
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
The Analyst as a Project Manager
Business Studies Grade 11.
HKU Faculty of Education1 Project planning Seminar 4 BSIM0011 Project Management.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Imran Ghaznavi Course Code: MGT557 COMSATS Strategic Human Resource Management.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
PROJECT RISK MANAGEMENT Presentation by: Jennifer Freeman & Carlee Rosenblatt
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
Appendix A Project Management: Process, Techniques, and Tools.
Using the Logical Framework to Develop Activity and Resource Schedules.
Decision making process / basic options assessment Mercury Storage and Disposal LAC Two Countries Project Gustavo Solórzano Ochoa, Consultan t Montevideo,
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Action Plan Skills Building: Module 1 Getting Started: Preparatory Tasks and Considerations January 2013.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Module 11 Session 11.1 Visual 1 Module 11 Executing and Controlling the Work Session 11.1 Managing Execution: Executing and Controlling the Work.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
 1. Clearly defined responsibilities, timelines, and milestones  2. Time commitments of key project staff 1.
Action Plan Skills Building: Introduction January 2013.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
Setting up your project for success Afternoon session.
Managing programs that promote personal effectiveness.
January 2013 Action Plan Skills Building: Module 4 Implementing and Evaluating the Action Plan.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
Chapter 7 Project Management and Event Implementation
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Monitoring and Evaluation Systems for NARS Organizations in Papua New Guinea Day 5. Session 14. Work Plan and Budget for M&E.
Session VIII: Work Plan and Budget Plan
Chapter 11 Project Management.
CMGT 410 aid Education Begins/cmgt410aid.com
Project Planning and Implementation
Systems Analysis and Design in a Changing World, 4th Edition
Lecture : Tasks and Responsibilities in the Management of Healthcare Wastes Which one do you want ? by Dr Mohammed Ali Al Zahrani.
Project Management and Information Security
“Plan the work. Work the plan.” ~ Old Saying
Project Management.
Chapter 3 Managing the Information Systems Project
MGT 605: CH 04 Defining the Project.
Tips for effective resource management and planning
Project Management Chapter 11.
P ROJECT M ANAGEMENT Skills.
Presentation transcript:

January 2013 Action Plan Skills Building: Module 3 Planning the Details: Activities, Timelines, Resources, and More

2 Action Plan Skills Building Workshop Module 3: Planning the Details Module 4: Implementing and Evaluating Module 1: Getting Started Module 2: Defining Purpose and Scope

3 Learning Objectives Gain understanding of the various components to be developed for an AP: Select activities to meet the objectives Develop practical implementation details Utility of GANTT and PERT charts

Outline 4 Defining activities Breaking down activities into tasks Considering order of activities and tasks Estimating realistic activity timeframes Developing milestones Defining the budget Allocating responsibilities Presenting the action plan

Defining Activities 5 An activity is: the highest level of action in the AP hierarchy an element of work performed during the course of a project has an expected duration, cost, and resource requirements may address more than one objective Activity Objective Activity

Begin with brainstorming session Identify any activities that will help meet the objective Collect and compare suggestions Organise as a logical set of activities Consult with those who have experience with similar APs 6 How to Define Activities

Breaking Down Activities into Tasks …that enable accurate estimation of time and resource requirements …that provide enough information for those responsible for an activity or task 7 Activity Task Activity Task

Breaking Down Activities into Tasks (cont.) Picture the AP as a hierarchy of activities and tasks 8 Activity 1 Task 1.1 Task 1.2 Task 1.3 Activity 2 Task 2.1 Task 2.2 Task 2.3 Task 2.4

9 Breaking Down Activities into Tasks: Example Activity: Repackage and store 100 tons of obsolete pesticides stockpiles in an environmentally safe manner Task: Obtain UN approved packaging materials suitable for long-term storage of chemicals Task: Repackage (when possible) and label the chemicals stocks Task: Transport the repackaged stocks Task: Store in a designated well-designed, secure and controlled facility(ies) for one year

10 Considering Order of Activities and Tasks Define order: Which activities/tasks can begin immediately? Which need to be completed before others can begin? Do some need to start at the same time?

Can only be an estimate, but should be carefully done to ensure accurate AP Review earlier projects for insight into realistic timeframes Consult with those who have the related technical knowledge or expertise 11 Estimating Realistic Activity Timeframes

Estimating Realistic Activity Timeframes (cont.) Underestimating the time required may result from: leaving out essential activities/tasks not accurately accounting for interdependence of activities/tasks not accounting for time required for ordering/delivery of equipment failure to accurately consider competing resources, e.g. scheduling same person or equipment for simultaneous activities/tasks 12

Developing Milestones An important event in the AP: typically the completion of a key activity or project phase Used to monitor whether project is on track during implementation The simplest project milestones are the dates estimated for the completion of an activity e.g. “Inventory of obsolete pesticides updated” 13

Human resources, facilities, equipment, materials, training, travel, etc. How many people are required? What type of skills/expertise do they need to possess? Are particular facilities, equipment, services, or materials necessary? Are there any other special requirements not yet covered? 14 Defining the Budget

Resource Requirements Matrix: Example 15 Activities and TasksHuman Resources FacilitiesEquipmentServices, Materials, etc. Total Resource Costs Activity: Repackage and store 100 tons of obsolete pesticides stockpiles in an environmentally safe manner Task: Obtain UN approved packaging materials suitable for long-term storage of chemicals Qualified driver (10 person- days) Labourer (40 person- days) Transport trucks Packaging materials Petrol 10 person-days*daily wage: $xx 20 person-days*daily wage: $xx Trucks: $xx Packaging materials: $xx Petrol: $xx Task: Repackage (when possible) and label the chemicals stocks Labourer (40 person- days) Manager (5 person- days) Protective clothing (overalls, masks, gloves…) 40 person-days*daily wage: $xx 5 person-days*daily wage: $xx Protective clothing: $xx

Allocating Responsibilities Addresses who will be responsible for completing each activity/task Demonstrates to donors that the team has agreement and commitment in principle Responsibilities may need to be adjusted 16

Allocating Responsibilities (cont.) Who has the appropriate knowledge? Whose commitment is required? Have the capability, skills, and expertise of each working group member, stakeholder, etc. been taken into account? Does each contributor understand what is required of them? 17

18 Responsibilities Assignment Matrix: Example Activities and TasksPerson/Organisation Ministry of Agriculture Ministry of Environment Project Coordination Unit Advisory Tech. Group Activity: Repackage and store 100 tons of obsolete pesticides stockpiles in an environmentally safe manner Task: Obtain UN approved packaging materials suitable for long-term storage of chemicals Arrange transportSelect packaging materials to be used (p) Advise on appropriate packaging materials Task: Repackage (when possible) and label the chemicals stocks Obtain protective clothing Hire appropriate labourers Monitor execution of the task (p) Plan the repackaging and labelling process Task: Transport the repackaged stocks Select a transport company Monitor execution of the task (p) Advise on transport companies that can ensure safe transport of hazardous substances

Presenting the Action Plan: GANTT Chart Activity/tasks represented by bars on a calendar, showing: Sequence Duration Milestones Responsible persons (optional) Costs (optional) 19

GANTT Chart: Example 20

Presenting the Action Plan: PERT Chart Activity/tasks represented by boxes linked in a logical order showing: Relationships (and dependencies) between activities/tasks Durations/dates (optional) Milestones (optional) Key decisions (optional) 21

PERT Chart: Example 22 Pre- plannin g

Summary Defining activities Breaking down activities into tasks Considering order of activities and tasks Estimating realistic activity timeframes Developing milestones Defining the budget Allocating responsibilities Presenting the action plan 23

Thank you Chemicals and Waste Management Programme United Nations Institute for Training and Research (UNITAR) Palais des Nations 1211 Geneva 10 Tel: Fax: