EGEE is a project funded by the European Union under contract IST-2003-508833 JRA4 Execution Plan and Brainstorming Javier Orellana JRA4 Coordinator EGEE.

Slides:



Advertisements
Similar presentations
LONG: Laboratories Over Next Generation Networks. Project Description & WP1: Management.
Advertisements

Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Connect. Communicate. Collaborate The Technological Landscape of GÉANT2 Roberto Sabatino, DANTE
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks JRA2: Quality Assurance & Security Coordination.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
EGEE is a project funded by the European Union under contract IST The way ahead Alistair Mills Grid Deployment Group
Standard User Interface Tooling Summary Report The Standard User Interface tooling project is a partnership project to deliver elements of a healthcare.
JRA1/Job Submission and Monitoring Moreno Marzolla on behalf of JRA1/Job Submission Task INFN Sezione di Padova,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
EGEE is a project funded by the European Union under contract IST Project Technical Forum C. Loomis (LAL-Orsay) GAG (CERN) July 6,
EGEE is a project funded by the European Union under contract INFSO-RI Summary M-E Bégin & B. Jones EGEE Technical Coordination All Activity Meeting,
EGEE is a project funded by the European Union under contract IST JRA3 Security Åke Edlund Security Head PEB All-Activity Meeting, June 18,
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
EGEE is a project funded by the European Union under contract IST JRA1-SA1 requirement gathering Maite Barroso JRA1 Integration and Testing.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
INFSO-RI JRA 1 Testbed Management Technologies Alain Roy (University of Wisconsin-Madison, USA) ETICS 2 Final Review Brussels - 11 May 2010.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Authentication and Authorisation for Research and Collaboration Christos Kanellopoulos
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
INFSO-RI Enabling Grids for E-sciencE Technical Overview Bob Jones, Technical Director, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST Task Breakdown – SA1 Alistair Mills SA1 - CERN SA1 Meeting Cork, 20 April.
EGEE is a project funded by the European Union under contract IST ARDA Project Status Massimo Lamanna ARDA Project Leader NA4/HEP Cork, 19.
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
EGEE is a project funded by the European Union under contract IST Study of Performance Standards, kick off (Task 1.1.1) Robert Stoy DFN EGEE.
EGEE is a project funded by the European Union under contract IST End-user requirements for network monitoring Paul Mealor JRA4 EGEE Kick-Off.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis J-P. Gautier.
EGEE is a project funded by the European Union under contract IST JRA4 Overview Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2.
Induction: What is EGEE? –April 26-28, EGEE organisation and procedures John Murison, EGEE Training Team EGEE is funded by the European Union.
All Activities Meeting – 13/14 Jan SA2 Execution Plan for the first year Franck Bonnassieux CNRS/UREC EGEE is proposed as a project funded by.
Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST
INFSO-RI Enabling Grids for E-sciencE Network Services Development Network Resource Provision 3 rd EGEE Conference, Athens, 20 th.
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
EGEE is a project funded by the European Union under contract IST Pete playing devils advocate JRA4-F2F Javier Orellana EGEE-JRA4.
EGEE is a project funded by the European Union under contract IST GN2 SA3 End to End Quality of Service Toby Rodwell DANTE First EGEE Conference,
EGEE is a project funded by the European Union under contract IST NA3 Execution Plan Malcolm Atkinson Director of the National e-Science Centre.
EGEE is a project funded by the European Union under contract IST Network Activities Jean-Paul Gautier CNRS/UREC French Federation meeting.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
JRA1/Job Submission and Monitoring Moreno Marzolla on behalf of JRA1/Job Submission Task INFN Sezione di Padova, OMII-EU Meeting,
INFSO-RI Enabling Grids for E-sciencE TNC 2005 Networking activities in EGEE Mathieu Goutelle (CNRS UREC, France) EGEE-SA2 activity.
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
JRA3 Introduction Åke Edlund EGEE Security Head
NPM Workplan K. Kavoussanakis.
EGEE SA2 / TERENA NRENs & Grids joint workshop
JRA1 (Middleware) Overview
WP7 objectives, achievements and plans
Network Requirements Javier Orellana
Bandwidth Allocation and Reservation Anand Patil, DANTE


GN2 (and its support for GRIDs)
Wide Area Workload Management Work Package DATAGRID project


JRA2 Quality Assurance Geneviève Romier CNRS-UREC
GN2 JRA5 Roaming and Authorisation Jürgen Rauschenbach, DFN-Verein
Presentation transcript:

EGEE is a project funded by the European Union under contract IST JRA4 Execution Plan and Brainstorming Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2 Session Javier Orellana EGEE-JRA4 Coordinator University College Cork Cork April 2004

- 2 Contents JRA4 Project Deliverables Initial Milestones & Deliverables Gantt Chart Sub tasks in progress & brainstorm  Network Performance Monitoring  Bandwidth Allocation and Reservation

- 3 JRA4 Project Deliverables Bandwidth Allocation & Reservation:  DJRA4.1 (M6, Sep/04): Specification of Interfaces (network control plane & global resource reservation middleware)  DJRA4.4 (M21, Dec/05): Implementation of pilot  DJRA4.6 (M24, Mar/06): Final Report Network Performance Monitoring & Diagnostic tools:  DJRA4.2 (M9, Dec/04): Definition of standardised network measurement query/response interfaces  DJRA4.5 (M21, Dec/05): Service to supply network perf. Information to resource brokering  DJRA4.7 (M24, Mar/06): Final Report IPv6:  DJRA4.3 (M18, Sep/05): Final Report

- 4 Initial Milestones & Deliverables Bandwidth Allocation & Reservation:  DJRA4.1 (M6, Sep/04): Specification of Interfaces (network control plane & global resource reservation middleware)  MJRA4.4 (M12, Mar/05): Prototype Implementation of bandwidth allocation and reservation service at specific network ingress points using static network configuration Network Performance Monitoring & Diagnostic tools:  MJRA4.1 (M3, Jun/04): Definition of initial network perf. metrics and composite measurements required  MJRA4.2 (M6, Sep/04): Requirements and use cases for monitoring and diagnostics tools for users, mw & ops  DJRA4.2 (M9, Dec/04): Definition of standardised network measurement query/response interfaces In progress

- 5 JRA4 Gantt Chart (initial 2Q)

- 6 Sub-Tasks in Progress: Network Performance Monitoring MJRA4.1 ST-1.1.1: “Study of Performance Standards” and ST-1.1.2: “Selection of the appropriate Metrics” Partners: CNRS/DANTE/DFN/GARR MJRA4.2 ST-1.2.1: “Requirements and Use case for end users” Partners: UCL/CNRS ST-1.2.2: “Requirements and Use case for Operations” Partners: CNRS/DFN

- 7 Sub-Tasks in Progress: Bandwidth Allocation and Reservation DJRA4.1 ST-2.1.1: “Analysis of Existing Interfaces” and ST-2.1.2: “Survey of Software available today” Partners: UCL/CNRS/DANTE Specification of Interfaces: 1.- Actor 2.- Grid Middleware (JRA1 Architecture) 3.- Multi-domain BB 4.- Single-domain tool 5.- Network Devices Architecture : 1.- Multi Single-BB 2.- Multi-domain BB 3.- Others

- 8 Thank you