Chapter 7 Managing Risk.

Slides:



Advertisements
Similar presentations
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

PROJECT RISK MANAGEMENT
OPSM 639, C. Akkan Monitoring Progress How does a project get one year late? … One day at a time –Frederick P. Brooks MBWA: Management by Walking Around.
CHAPTER 17 Project Management.
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
Project Management.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Chapter 7: Managing Risk
Project Cost Management Estimation Budget Cost Control
Estimating Project Times and Costs
Risk Management Chapter 7.
Software project management (intro)
McGraw-Hill/IrwinCopyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. Managing Risk Chapter 7.
Project Risk Management
OM480 Managing Project Risk (With Material from the Text Authors)
LSU 10/09/2007Risk Management1 Risk & Risk Management Project Management Unit #5.
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Risk Management
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
PRM 702 Project Risk Management Lecture #28
PMI Knowledge Areas Risk Management.
Chapter 11: Project Risk Management
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
Risk Management A Key Project Management Knowledge Area.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
S.Cholette, based on McGraw-Hill/Irwin Managing Risk.
Managing Risks in Projects. Risk Concepts The Likelihood that some Problematical Event will Occur The Likelihood that some Problematical Event will Occur.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 11 Project Risk Management.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Chapter 12 Project Risk Management
Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 7-1 Risk Management.
© The McGraw-Hill Companies, Software Project Management 4th Edition Risk management Chapter 7.
“WHY ARE PROJECTS ALWAYS LATE?” (“and what can the Project Manager DO about that?) Craig Henderson, MBA, PMP ARVEST Bank Operations.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Risk Management A Key Project Management Knowledge Area An Essential Part of the Project Plan © Edward B. Farkas, CHS, CPM, MIEEE, PMP.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introducing Project Management Update December 2011.
SOFTWARE PROJECT MANAGEMENT
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management Methodology
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
Project Risk Management. Risk-Defined A situation involving exposure to danger; “The combination of the probability of an event and its consequences”
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
Project Management Risk Management.
Chapter 7 : Risk Management – part 2
Risk planning Risks can be dealt with by: Risk acceptance – the cost of avoiding the risk may be greater than the actual cost of the damage that might.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
PROJECT MANAGEMENT week 8
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Lecture 7: Project Risk Management Murodullo Bazarov November 2, 2015.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
8 Managing Risk (Premium).
Project Management Managing Risks
Chapter 11: Project Risk Management
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Software Project Management (SPM)
Manajemen Industri Teknologi informasi
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Project Risk Management
Managing Risk Chapter 7.
Presentation transcript:

Chapter 7 Managing Risk

Risk Management Process Uncertain or chance events that planning can not overcome or control. Risk Management A proactive attempt to recognize and manage internal events and external threats that affect the likelihood of a project’s success. What can go wrong (risk event). How to minimize the risk event’s impact (consequences). What can be done before an event occurs (anticipation). What to do when an event occurs (contingency plans).

The Risk Event Graph FIGURE 7.1

Risk Management’s Benefits A proactive rather than reactive approach. Reduces surprises and negative consequences. Prepares the project manager to take advantage of appropriate risks. Provides better control over the future. Improves chances of reaching project performance objectives within budget and on time.

The Risk Management Process FIGURE 7.2

Managing Risk Step 1: Risk Identification Step 2: Risk assessment Generate a list of possible risks through brainstorming, problem identification and risk profiling. Macro risks first, then specific events Step 2: Risk assessment Scenario analysis Risk assessment matrix Failure Mode and Effects Analysis (FMEA) Probability analysis Decision trees, NPV, and PERT Semiquantitative scenario analysis

Partial Risk Profile for Product Development Project FIGURE 7.3

Risk Assessment Form FIGURE 7.4

Risk Severity Matrix FIGURE 7.5

Risk Schedules FIGURE 7.6

Managing Risk (cont’d) Step 3: Risk Response Development Mitigating Risk Reducing the likelihood an adverse event will occur. Reducing impact of adverse event. Transferring Risk Paying a premium to pass the risk to another party. Avoiding Risk Changing the project plan to eliminate the risk or condition. Sharing Risk Allocating risk to different parties Retaining Risk Making a conscious decision to accept the risk.

Contingency Planning Contingency Plan An alternative plan that will be used if a possible foreseen risk event actually occurs. A plan of actions that will reduce or mitigate the negative impact (consequences) of a risk event. Risks of Not Having a Contingency Plan Having no plan may slow managerial response. Decisions made under pressure can be potentially dangerous and costly.

Risk Response Matrix FIGURE 7.7

Risk and Contingency Planning Technical Risks Backup strategies if chosen technology fails. Assessing whether technical uncertainties can be resolved. Schedule Risks Use of slack increases the risk of a late project finish. Imposed duration dates (absolute project finish date) Compression of project schedules due to a shortened project duration date.

Risk and Contingency Planning (cont’d) Costs Risks Time/cost dependency links: costs increase when problems take longer to solve than expected. Deciding to use the schedule to solve cash flow problems should be avoided. Price protection risks (a rise in input costs) increase if the duration of a project is increased. Funding Risks Changes in the supply of funds for the project can dramatically affect the likelihood of implementation or successful completion of a project.

Contingency Funding and Time Buffers Contingency Funds Funds to cover project risks—identified and unknown. Size of funds reflects overall risk of a project Budget reserves Are linked to the identified risks of specific work packages. Management reserves Are large funds to be used to cover major unforeseen risks (e.g., change in project scope) of the total project. Time Buffers Amounts of time used to compensate for unplanned delays in the project schedule.

Contingency Fund Estimate (000s) TABLE 7.1

Managing Risk (cont’d) Step 4: Risk Response Control Risk control Execution of the risk response strategy Monitoring of triggering events Initiating contingency plans Watching for new risks Establishing a Change Management System Monitoring, tracking, and reporting risk Fostering an open organization environment Repeating risk identification/assessment exercises Assigning and documenting responsibility for managing risk

Change Management Control Sources of Change Project scope changes Implementation of contingency plans Improvement changes

Change Management Control The Change Control Process Identify proposed changes. List expected effects of proposed changes on schedule and budget. Review, evaluate, and approve or disapprove of changes formally. Negotiate and resolve conflicts of change, condition, and cost. Communicate changes to parties affected. Assign responsibility for implementing change. Adjust master schedule and budget. Track all changes that are to be implemented

The Change Control Process FIGURE 7.8

Benefits of a Change Control System Inconsequential changes are discouraged by the formal process. Costs of changes are maintained in a log. Integrity of the WBS and performance measures is maintained. Allocation and use of budget and management reserve funds are tracked. Responsibility for implementation is clarified. Effect of changes is visible to all parties involved. Implementation of change is monitored. Scope changes will be quickly reflected in baseline and performance measures.

Change Request Form FIGURE 7.9

Change Request Log FIGURE 7.10

Key Terms Avoiding risk Budget reserve Change management system Contingency plan Management reserve Mitigating risk Risk Risk profile Risk severity matrix Scenario analysis Sharing risk Time Buffer Transferring risk

PERT and PERT Simulation

PERT—PROGRAM EVALUATION REVIEW TECHNIQUE Assumes each activity duration has a range that statistically follows a beta distribution. PERT uses three time estimates for each activity: optimistic, pessimistic, and a weighted average to represent activity durations. Knowing the weighted average and variances for each activity allows the project planner to compute the probability of meeting different project durations.

Activity and Project Frequency Distributions FIGURE A7.1

Activity Time Calculations The weighted average activity time is computed by the following formula: (7.1)

Activity Time Calculations (cont’d) The variability in the activity time estimates is approximated by the following equations: The standard deviation for the activity: (7.2) The standard deviation for the project: (7.3) Note the standard deviation of the activity is squared in this equation; this is also called variance. This sum includes only activities on the critical path(s) or path being reviewed.

Activity Times and Variances TABLE A7.1

Probability of Completing the Project The equation below is used to compute the “Z” value found in statistical tables (Z = number of standard deviations from the mean), which, in turn, tells the probability of completing the project in the time specified. (7.4)

Hypothetical Network FIGURE A7.2

Hypothetical Network (cont’d) FIGURE A7.2 (cont’d)

Possible Project Duration FIGURE A7.3

Z Values TABLE A7.3