1 NASA Program Update in Astronomy and Astrophysics Paul Hertz Assistant Associate Administrator for Science Science Mission Directorate February 15, 2005.

Slides:



Advertisements
Similar presentations
2013 Key Issues Review: Enabling Sustained Deep Space Exploration with a Broad Vision Congressional Visits Day Preparatory Briefing Teleconferences February.
Advertisements

NASA Earth Science Update
Space Technology Programs James Reuther Office of the Chief Technologist March 28, 2012 Office of the Chief Technologist.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
HUBBLE SPACE TELESCOPE PROGRAM Sixth European Conference on Space Debris 1 Goddard Space Flight Center mk_overview.ppt Space Shuttle STS- 31 Deployment.
1 Astronomy and Astrophysics Advisory Committee Astrophysics Division FY2008 Budget February 8, 2007 Rick Howard Astrophysics Division Director (acting)
Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
NASA AGENCY REPORT Dr. Eric J. Lindstrom Physical Oceanography Program Scientist Earth Science Division Science Mission Directorate MARCH 12, 2007.
1 January 17, 2007 NASA IPY Interest NASA has a strong interest in IPY themes Present environmental status of the polar regions Quantify and understand.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
Current Space Missions (Part 2)
1 NASA Agency Overview NASA’s Vision and Fundamental Physics in Space Paul Hertz Chief Scientist, Science Mission Directorate NASA International Workshop.
Fundamental Physics and the Decadal Survey Quantum to Cosmos 3 Airlie, VA 7 July 2008 Michael Salamon NASA HQ/Astrophysics Div.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
National Aeronautics and Space Administration 1 Traub Exoplanets: Astro2010 Survey Results, ExEP Proposed Community Actions (Joint presentation with Alan.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
Mary E. Kicza Assistant Administrator for NOAA Satellite and Information Services Responsible for Responsible for providing timely access to global environmental.
1 Astronomy & Physics Division ASTRONOMY & PHYSICS DIVISION STATUS & PLANNING PHILIPPE CRANE Origins Theme Scientist Baltimore, Md. February 26, 2004.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
IMPRS June Organigram of ESA, in the late 1980s
1 Astronomy and Astrophysics Advisory Committee Astrophysics Division Update Dr. Jon Morse Astrophysics Division Director Science Mission Directorate NASA.
Program Status Physics of the Cosmos Program (PCOS) Cosmic Origins Program (COR) M. Ahmed Briefing to the PhysPAG January 8, 2012 AAS Meeting, Austin Texas.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
BFA Update National Science Foundation Advisory Committee for Business and Operations November 18, 2004 Tom Cooley NSF Chief Financial Officer Director,
May 11, Astronomy and Astrophysics Advisory Committee Astrophysics Division and Update May 11, 2006 Rick Howard Astrophysics Division Director (Acting)
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
NASA Earth Science Technology Update Presented to Doppler Wind Lidar Working Group April 28, 2015 George J. Komar Associate Director/Program Manager Earth.
WFMOS Status Report Doug Simons Gemini Observatory January 2008.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
Key Ideas Describe characteristics of the universe in terms of time, distance, and organization. Identify the visible and nonvisible parts of the electromagnetic.
NASA Program Update Presented to the AAAC Dr. Anne L. Kinney Director, Universe Division October 11, 2005.
Physics of the Cosmos Program Analysis Group John Nousek Penn State University International Workshop on Astronomical X–Ray Optics Prague, Czech Republic.
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
Presented to Kepler Pre-Launch Educator Workshop January 31, 2009 Shari Asplund Discovery and New Frontiers Programs Education and Public Outreach Manager.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
IMPRS June Space Research? „Space“: the region outside the bound of the Earth‘s atmosphere and gravity There are several kinds of space activities:
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
TABLE OF CONTENTS Table of Contents: Mission Overview Timeline Scientific Objectives Spacecraft Launch Vehicle Equipment Nuclear Spectroscopic Telescope.
1. G O D D A R D S P A C E F L I G H T C E N T E R 2 New Budget Initiatives for NASA in FY04.
NASA Applied Sciences Program Update John A. Haynes Program Manager, Weather National Aeronautics and Space Administration Applied Sciences Program Earth.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Programs and plans ASI - Observation of the Universe.
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
Atlantic Innovation Fund Round VIII February 5, 2008.
MODIS Science Team Meeting Paula S. Bontempi MODIS Program Scientist Earth-Sun System Division Science Mission Directorate National Aeronautics and Space.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
CSRP NASA Workshop NASA’s Revised Budget. CSRP NASA Workshop NASA’s New Vision and Objectives (as of January 14, 2004)  VISION  The fundamental goal.
Satellites, Telescopes, Probes and Rovers
Dr. Jon Morse Astrophysics Division Director Science Mission Directorate NASA Headquarters February 11, 2008 Astronomy and Astrophysics Advisory Committee.
Science Mission Directorate NASA Earth Science Update Winds Workshop, Miami. February 2005 Eric J. Lindstrom Ocean Physics Program Scientist Earth-Sun.
Gravitational Wave Physics Programme: - new initiative - Group composition (current): 3 staff, 0 postdoc, 2 PhD Investment Budget: under discussion Jo.
LSST CORPORATION Patricia Eliason LSSTC Executive Officer Belgrade, Serbia 2016.
Preparing for the Future: NASA's Planning for the Decadal Survey
Unmanned Space Probes.
Visions and Voyages: The Planetary Decadal Survey
Presentation transcript:

1 NASA Program Update in Astronomy and Astrophysics Paul Hertz Assistant Associate Administrator for Science Science Mission Directorate February 15, 2005 Astronomy and Astrophysics Advisory Committee

2

3 NASA Management Office Administrative Processes Education Officer NASA Centers Business Management Solar System Earth-Sun System Mission & Systems Management Associate Administrator (AA) Deputy AA For Management Deputy AA For Programs Mission Support Mission Mission Enabling Universe JPLARCGSFC Councils Leadership Council Science Management Council Program Management Council Operations Council Science Mission Directorate A. Diaz G. Asrar A. McNallyO. Figueroa R. ParkerC. Sorrels A. KinneyA. Dantzler (act.)M. Cleave (act.) R. MaizelM. Luther C. ElachiE. WeilerS. Hubbard AAA/Strat, Pol & Int’l (M. Allen) AAA/Science (P. Hertz) AAA/Technology (H. Thronson) AAA/Exploration Mission Int. Sr. Policy Advisor (G. Williams)

4

5

The CREAM payload flew 41 days, 21 hr, 31 min in three circumnavigations of the South Pole between December 16, 2004 and January 27, Previous LDB record was broken by >10 days - 14,000 nautical miles traveled - Record-Breaking Flight Press Release on 1/31/05 The CREAM payload has been fully recovered - NSF/OPP set up field camp at impact site and provided 5 Twin Otter flights for recovery: Thanks! - Payload disassembled to fit inside Twin Otter - To be Air-shipped from McMurdo to U.S. Calorimeter & Transition Radiation Detector both provided excellent particle data via TDRSS - Quest to explore SN cosmic ray acceleration limit - B/C ratio distinguishes propagation models This flight demonstrated all of the ULDB support systems for future 100-day flights - The balloon was the only non-ULDB system Record-Breaking Balloon Flight in Antarctica Cosmic Ray Energetics and MASS (CREAM)

7

8 Highlights Congratulations to Chuck Bennett on his receiving the prestigious Henry Draper Medal! ( The NAS awards this medal every 4 years for significant contributions to astronomical physics.) Recent selections – ST8 Downselect – LRO Instruments – MSL Instruments – SMEX Downselect – Discovery

9 Highlights Interstellar Boundary Explorer (IBEX) –Make global observations of the boundary between the solar system and interstellar space to study both (D. McComas / Southwest Research Institute) Nuclear Spectroscopic Telescope Array (NuSTAR) –Studies the inner regions of black holes and maps the origins of the elements in supernova remnants (F. Harrison / Caltech)

10 Highlights Hubble ultra deep field Swift & GPB Launches Hubble/Spitzer/Chandra joint observation of Kepler’s SNR Chandra independent measurement of dark energy

Significant Events Universe Division Transformation activities continue. HST activities. Many Space Science Updates held. Vision Missions and Origins Probe concept studies selected. Gravity Probe B launched. (April) 2004 Senior Review complete. (May) - GALEX, FUSE and WMAP were extended through Sept 08; RXTE through Mar 07; CHIPS and HETE-2 terminate Sept The data centers (ADS, MAST, HEASARC, NED, IRSA, LAMBDA) continue at current funding levels with minor adjustments. WISE begins preliminary design (Phase B). (August) Beyond Einstein Program and LISA mission begin formulation (Phase A). (October) Kepler confirmed for implementation (Phase C/D). (December) TPF split into TPF-C and TPF-I. Swift launched. (December) NuSTAR continued in Phase A (January)

Launches NOAA NVAFB April 14 SOFIAWaco, TX April 15 Astro-E2Uchinoura Space Center NET May 1 GOES NCCAFS May 4 ST-6June 1 CALIPSOVAFB June 17 CloudSatVAFB June 17 MROCCAFS August 8 TWINS ASeptember 1 CINDIVAFB September 15

13

14

15

16

17 Universe Budget Hubble Space Telescope What’s Changed –Space Telescope Imaging Spectrograph (STIS) experienced a power failure late in 2004 and is no longer operational –Life-extension 2-gyro pointing mode becomes available in 2005 –Budget supports early development of de-orbit capability What’s Stayed the Same –Budget continues support of additional life-extension measures, including 1-gyro mode feasibility and alternative battery reconditioning

18 Universe Budget Hubble Space Telescope NASA decided to discontinue the effort on robotic servicing of the HST and, based on analysis of relative risks, not to proceed with a Shuttle servicing mission. NASA’s FY06 budget includes funds to: 1.Keep HST operating as long as the spacecraft continues generating useful data 2.Develop techniques to extend HST’s life even as its pointing system ages and becomes less stable 3.Safely de-orbit the spacecraft after the end of HST’s useful life, including assessment of ideas that could enhance Hubble life without the use of robotic servicing 4.Examine options for addressing some HST science such as rehosting new or modified HST instruments on new space platforms 5.Continue analysis of the archived data generated by HST 6.Aggressively pursue development of JWST

19 Universe Budget Navigator Program What’s Changed –TPF has been divided into two missions: oA visible-light coronagraph (TPF-C) to launch after SIM and JWST oA formation flying interferometer (TPF-I) to launch after TPF-C –SIM launch has been slipped ~2 years –SIM costs have increased as design concept has matured; rescope activity underway What’s Stayed the Same –Large Binocular Telescope Interferometer (LBTI) first light will occur on schedule in late 2006 –Planet finding foundation science

20 Universe Budget Research (Operating Missions & R&A) What’s Changed –Swift launched on Nov 20 and is conducting science –GP-B launched on Apr 20 and is conducting science –Astro-E2 launch delayed by Japan to NET May 2005 –Funding for mission extensions has been reduced –Out-year R&A budget held at the 2006 level –Incorporates results of 2004 Senior Review What’s Stayed the Same –Chandra operations will continue through 2010 –With the successful launch of Swift, HETE-2 will be terminated at the end of 2005

21 Universe Budget James Webb Space Telescope What’s Changed –Nothing What’s Stayed the Same –JWST will begin full-scale development in 2006 –Program continues to work toward a 2011 launch

22 Universe Budget Gamma-ray Large Area Space Telescope What’s Changed –Mission CDR delayed due to the rebaseline of the LAT resulting from technical issues, as well as funding delays by international partners What’s Stayed the Same –GLAST entered development phase in early FY04, working toward a May 2007 launch

23 Universe Budget Beyond Einstein What’s Changed –LISA entered formulation phase early in FY 2005 –Budget reflects tentative NASA/ESA agreement on roles and responsibilities for the LISA mission; out-year budget includes funding for both spacecraft and integration –Budget restores FY 2006 Con-X funding deleted in FY 2005 President’s budget What’s Stayed the Same –Funding for Einstein Probes is not budgeted –LISA will launch NET 2012 –Con-X will launch NET 2016

24 Universe Budget International Space Science Collaboration What’s Changed –Herschel and Planck out-year budgets reflect six-month launch delay announced by ESA in 2004 –Budget includes funding increases driven by technical issues on Herschel –Budget line now combines operations and data analysis with development (previously booked separately) What’s Stayed the Same –Planck cryocooler and instrument component remains on schedule

25 Universe Budget Stratospheric Observatory for IR Astronomy What’s Changed –NASA has decided to take over management of aircraft maintenance and operations from USRA –Operational Readiness review and first science flight have been delayed ~12 months What’s Stayed the Same –First test flight to occur in FY 2005

26 Universe Budget Discovery/Explorers (Universe Missions) What’s Changed –Kepler has been conditionally approved to eneter implementation phase in April 2005, pending satisfactory resolution of outstanding issues –EUSO launch date has slipped; ESA decision to pursue Phase B is pending –WISE planned launch date has slipped 6 months to June 2008 What’s Stayed the Same –WISE scheduled to enter development phase in late 2005

27 Universe Budget Future Discovery/Explorers What’s Changed –Future Explorer Program oReductions to the Future Explorers Program will result in fewer missions in the current budget horizon and will delay the next Explorer mission solicitation. –Future Discovery Program oDiscovery 12 AO to be released in March What’s Stayed the Same –Explorer Program missions currently in or approaching development are THEMIS, AIM, IBEX, and WISE. –Discovery missions currently in or approaching development are Dawn and Kepler.

28 Solar System Budget Highlights Discovery selected MMM; new AO expected soon New Frontiers funding limitation may extend development time of New Frontiers 2 Mars Rover operations extended through March 31 MSL instruments selected LRO instruments selected, has entered formulation In-Space Propulsion reduced (slowed down or eliminated 5 technologies) JIMO deferred indefinitely; high capability instruments deferred Astrobiology maintained at FY05 level

29 Mission Status Universe Division HST No funding for servicing mission. Could not fund robotic servicing mission after NAS report. PDR next month focused on deorbit mission. SOFIA Begin engineering test flights this Spring. Delays to engineering and science flights. Major issue - Cost of operations. Completed two major independent reviews - report to PMC this month. SIM 2011 LRD - 1 year delay. Significant cost growth. Budget cut. Looking at replan to put back in box. Strategic planning has a role.

30 JWST LRD Aug Mirror fabrication continues to go well. Biggest issue - Lack of resolution on LV issue is having an impact Agency provides strongest possible programmatic commitment to JWST - money will not be the pacing constraint. LISA LRD NET Aug 2004 ESA/NASA agreement on joint development. ESA selected study contractor. Technology plan due in a few weeks. Implementation budget augmented to account for new NASA role. Mission Status Universe Division

31 TPF-C LRD 2015 Foundation science is blooming, robust program to set science foundation. Con-X LRD NET Continuing technology development. Investigating synergism with ESA's XEUS. FY06 "budget malfunction" repaired. Mission Status Universe Division

32 GLAST LRD May 2007 (pending LAT rebaseline & GLAST replan). GLAST flight towers A and B, built, tested and shipped to SLAC, are performing extremely well. Major cost/schedule problems with Large Area Telescope (LAT) Joint NASA/DOE instrument Overrun on LAT at $25-35M President’s budget caps DOE contribution to overrun at $3M Also limits operations costs to less than proposed/planned/agreed ASI has not signed contract for LAT construction, costing $1M/week, currently at $5M and counting Major cost growth on GLAST $45-60M NASA and DOE rebaselining LAT NASA looking at LAT and GLAST descopes NASA looking at ways of reducing further cost and schedule risk Has implications for future NASA/DOE partnerships Mission Status Universe Division

33 JDEM Concept Study Funding An amendment to the 2005 Research Opportunities in Space and Earth Sciences (ROSES-2005) will be posted in the near future. Will call for proposals for JDEM Concept Studies with support considerably larger than that for the earlier Beyond Einstein Concept Studies. Additional information will have to wait until the ROSES Amendment posting.

34 Scientific Ballooning Roadmap Team – Summary (as reported to SEUS/OS 8 Nov 2004) Scientific ballooning has made important contributions. –Science from balloon flights and instrument development for spacecraft Scientific ballooning will contribute to NASA’s objectives. –Physics of the Universe, Space Science Strategy, Earth Science Strategy The current balloon program has substantial capability, but –Funding for the the Balloon Program Office is barely adequate. –Funding under SR&T for new instruments is inadequate. High-priority needs have been identified. –Increased LDB capability: more polar flights, trajectory modification –Complete current ULDB plans and extend to higher altitude (125 kft) –A restored UNEX program to provide a reliable funding source and enable new science capability. There are exciting new possibilities for the next 10 to 30 years. –Flights at 160 kft (less than 1 mb residual atmosphere) –Advanced trajectory control and large aerostats –Balloons capable of deployment on Venus, Mars, Titan

35 ROSES 2005 Research Opportunities in Space and Earth Sciences Omnibus NASA Research Announcement Available at end of January Over 50 program elements, 11 in Universe Division, plus Interdisciplinary Exploration Science Proposal due dates from April 8 to early 2006 New NASA Proposal Data Base System NSPIRES - NASA Solicitation and Proposal Integrated Review and Evaluation System Must be registered to be a PI or Co-I on a NASA proposal Everyone must register again! Major change: Electronic cover sheets must be submitted by the institution, not the PI Every institution must register!

36 Universe Key Issues Key Issues and Events SOFIA – first test flight (April) Astro-E2 – launch (summer) GLAST replan/descope Kepler funding reductions and other 05 impacts First meetings of new advisory committee and subcommittees Future of Hubble Space Telescope Future of Beyond Einstein Roadmapping and strategic planning Balance of science and exploration

Highlights

38 Backup charts

39 Recommendations under current funding The current funding comes in two parts: ~$25M/yr to Balloon Program Office to support operations and technology development. –BPO plans given this budget make sense, so we do not recommend any significant changes. –However, the funding level is barely adequate. ~$15M/yr from SR&T to scientists for developing missions and analyzing their data. –There are many balloon-borne missions that will advance key elements of NASA strategic plans -- more than will fit into the current budget! –This roadmap team has not attempted to prioritize among them. –Strengths of the balloon program are that oIts science is selected by peer review (like Explorers). oIt gives opportunity for new ideas, not foreseen in strategic plan.

40 High-Priority Need for Scientific Ballooning Increased Capability for Long-Duration flights New programs needing this: –Polarization of Cosmic Microwave Background –Detection of neutrinos with energy > eV –High sensitivity spectroscopy and survey imaging of black holes oin advance of Beyond Einstein missions Con-X and Black Hole Finder Probe. –Others will surely use the capability also. Program and technology developments to support this: –Additional infrastructure and program cost to enable three Antarctic flts/yr –Dedicated aircraft in Antarctica to help assure timely instrument recovery –LDB flight capability for three flights per year from Arctic –“Nudging” trajectory control to meet flight safety and environmental restrictions oKeep Antarctic trajectory over the continent even after two circuits oEnsure that mid-latitude flights do not fly over densely populated areas oThis is critical technology for ULDB flights of 100 days or more

41 High-Priority Need for Scientific Ballooning High-Altitude (125 kft) Super-Pressure Balloon Required for gamma-ray and hard X-ray investigations of the “Beyond Einstein” program. –Data from balloon-borne instruments will begin to address the scientific objectives of “Beyond Einstein”. –Balloon-borne instruments will be essential for development and testing of new technology for Constellation-X, Black Hole Finder Probe, Advanced Compton Telescope. –These investigations require oAltitude 125 kft desired, 120 kft minimum, for 1-ton instrument oLong duration, at least ten days at these altitudes oLow cosmic-ray background, by flying at mid-latitude. Program and technology developments to support this: –Extension of current ULDB development, which will take 1-ton instrument to >110 kft about two years from now. oSubstantially lighter-weight support instrumentation o~ 50% increase in balloon volume

42 High-Priority Need for Scientific Ballooning Issue a UNEX AO under current Explorer guidelines. Balloon payloads would be highly competitive for UNEX. – LDB missions were reviewed favorably in the 1997 UNEX solicitation. – With a now proven LDB capability, LDB missions would be even more competitive today. – ULDB missions would also be very competitive once the super-pressure balloons are successfully demonstrated. Currently balloon payloads are solicited in the ROSS NRA’s. – Payloads capable of achieving the highest priority science are too expensive for SR&T budgets (Cost ~ SMEX/4). LDB Missions are solicited as Missions of Opportunity. – One LDB Mission (ANITA) is in Phase-A Concept Study. – There is no clear mandate to evaluate science/$ for Explorer. – Most balloon missions cannot compete with full size Explorer science. Frequent UNEX AO's would provide better, more reliable support for both balloon missions and Missions of Opportunity.

43 Long-term (10 – 30 year) vision for scientific ballooning Flights of 1-ton instruments at extremely high altitudes with less than 1 mb residual atmosphere (above 160 kft) –Enables solar UV research on magnetic transition zone and improves solar irradiance source imaging by including the UV –Enables much improved X-ray, gamma-ray, cosmic-ray studies. –160 kft with 450 lb science instrument has been demonstrated. Advanced trajectory control, large aerostats capable of station keeping and/or tethered balloons –Enable Earth observations on spatial and temporal scales that satellites cannot, complementing global satellite observations –Could fly to desired location from any convenient launch/recovery site. –~70 kft, enable atmospheric studies, geophysical monitoring, and serve as a platform for optical telescopes free of most of the atmospheric “seeing” –~130 kft, serve as a platform for optical telescopes comparable to Hubble Balloons capable of deployment elsewhere in the Solar System – Venus, Mars, Titan –Atmospheric studies –Close monitoring of ground