Sanitation Requirements in Space: The issues of Space Debris and its Management V. Adimurthy Indian Space Research Organisation.

Slides:



Advertisements
Similar presentations
Concept Overview for 2 mt Case “2 mt case”: integrated payloads of no more than 2 mt can be landed on the surface of Mars; extension of current Mars EDL.
Advertisements

Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
FEDERAL SPACE AGENCY International conference “Europe space policy: ambitions 2015” Session 1. “General view on propulsion systems: LV of the future”
DEBRIS REMOVAL DESIGN DRIVERS BASED ON TARGET SELECTION 2 nd European Workshop on Active Debris Removal CNES HQ, Paris, 18 th - 19 th July 2012 Adam White:
Space Debris Environment Impact Rating System 1 University of Southampton 2 PHS Space Ltd. H.G. Lewis 1, S.G. George 1, B.S. Schwarz 1 & P.H. Stokes 2.
Chandrayaan 1,the first pure space science mission ISRO had ever done. Chandrayaan-2 is the second unmanned lunar exploration mission proposed by.
© The Aerospace Corporation 2011 Space Debris & Debris Mitigation Marlon Sorge The Aerospace Corporation AIAA Improving Space Operations Workshop 5 April.
National Aeronautics and Space Administration The Disposal of Launch Vehicle Orbital Stages Nicholas L. Johnson Chief Scientist for Orbital Debris 28 October.
National Aeronautics and Space Administration Orbital Debris Mitigation R. L. Kelley 1, D. R. Jarkey 2, G. Stansbery 3 1. Jacobs, NASA Johnson Space Center,
Architecture Team Industry Day Briefing 17 January, 2002.
Federal Aviation Administration On-Orbit Debris Mitigation Methods for Upper Stages COMSTAC: Space Transportation Operations Working Group and Risk Management.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
The impact of long-term trends on the space debris population Dr Hugh Lewis Astronautics Research Group, Faculty of Engineering & the Environment.
Flags Courtesy of 3dflags.com Robotic Precursor Missions to the Moon and Mars Douglas. A. Craig Tetsuji Yoshida NASA- HQ Shimizu Corp. November 2008.
TMS logo THE MARS SOCIETY Life on Mars? ALH84001 Could There Be Life On Mars?
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
Launch System Launch Vehicle Launch Complex Orbit Insertion Orbit Maneuvers.
Long-term evolution of the space debris population Dr Hugh Lewis Astronautics Research Group, Faculty of Engineering & the Environment.
Today’s APODAPOD  Read NASA website:  solarsystem.nasa.gov solarsystem.nasa.gov  Hand in 2 nd Homework TODAY (3 rd due Friday)  IN-CLASS QUIZ THIS.
A3 Altitude Test Facility
Presented to: By: Date: Federal Aviation Administration Office of Commercial Space Transportation Orbital Debris 10 June, 2015 Symposium for the Small.
Oh, Thank Heaven for 7-Eleven: Fueling Up in Space with In-Situ Resource Utilization ASTE-527 Final Presentation Riley Garrett.
Indian Space Research Organization
Space Station Alpha Also known as International Space Station The major partners and their space agencies are the United States (NASA), Russia (RSA), European.
ACCORD Aim: Provide a mechanism for communicating the efficacy of current debris mitigation practices & identifying opportunities for strengthening European.
Ch 22: Exploring Space. “Imagination is more important than knowledge” -Albert Einstein.
The Effectiveness of Space Debris Mitigation Measures ISU’s 16 th Annual International Symposium 21 st February 2012 Adam E. White, Hugh G. Lewis, Hedley.
1 ORBITAL DEBRIS: TOWARDS SUSTAINABLE SPACE ACTIVITIES PARIS SPACE WEEK 2015 Christophe BONNAL CNES – Launcher Directorate – Senior Expert Chairman – Space.
Team PM8 Eventus Slide 1. Commercial spaceflight has seen increased activity as more privately owned companies invest in the venture. To avoid a catastrophic.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
14 Space Agencies ASI Italy BNSC UK CNES France CNSA China CSA Canada CSIRO Australia DLR Germany ESA Europe ISRO India JAXA Japan KARI South Korea NASA.
Space Shuttles By Frederick. Launching Space Shuttles To lift the 4.5 million pound (2.05 million kg) shuttle from the pad to orbit (115 to 400 miles/185.
Space Shuttles By Frederick. Launching Space Shuttles To lift the 4.5 million pound (2.05 million kg) shuttle from the pad to orbit (115 to 400 miles/185.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
ISRO (INDIAN SPACE RESEARCH ORGANISATION)
 The launch of the first man-made object to orbit the Earth, the USSR's Sputnik 1, on 4 October 1957EarthSputnik 1  Four years later on April 12, 1961,
Human Exploration of Mars Design Reference Architecture 5
Learning Goals  I will be able to identify the names of the space shuttles in NASA’s program.  I will be able to identify two shuttle disasters.
CRICOS No J a university for the world real R ENB443: Launcher Systems Image Credit: ESA Caption: The generic Ariane-5 (Ariane Flight 162) lifting.
MARS ORBITER MISSION (MANGALYAAN) PRESENTED BY,PRESENTED BY,RAMYA.K M.TECH COS 1 st yrM.TECH COS 1 st yr.
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Proposal of Chandrayaan 1 The main person behind it was Dr. A P J Abdul Kalam Signed up by the then Prime Minister, Atal Bihari Vajpayee in 2003 It took.
National Aeronautics and Space Administration Space Debris Assessment for USA-193 Presentation to the 45 th Session of the Scientific and Technical Subcommittee.
Recommendation to Cease NASA Crew Return Vehicle Development April 29, 2004 Amanda KellyBlake HajovskyAnthony Pittman Engineering Technical Communications.
2015 in Spaceflight: A year in review Tal Inbar Head, Space Research Center The Fisher Institute for Air & Space Strategic Studies, Israel.
Flight Hardware. Flight Profile - STS Flight Profile - SLS Earth Mars 34,600,000 mi International Space Station 220 mi Near-Earth Asteroid ~3,100,000.
ESA UNCLASSIFIED – Releasable to the Public Session 7: Science and engineering lessons from the de- orbiting and re-entry phase C. Pardini (1), H. Krag.
The Global Exploration Roadmap Considerations on Life Support International Space Exploration Coordination Group (ISECG) Francois Spiero, CNES Co-chair,
National Goals and Objectives
Space Tug Propellant Options AIAA 2016-vvvv
DESTINATION MARS.
Technical Resource Allocations
MOM Mars Orbiter Mission ISRO
Indian Space Programme
The Space Race How it all Began.
The Space Race How it all Began.
Space Express Sub-Orbital Mission
Development and Principles of Rocketry
Space Junk Aerospace Engineering © 2011 Project Lead The Way, Inc.
Space Junk Aerospace Engineering © 2011 Project Lead The Way, Inc.
Mars Sustainability Workshop Kennedy Space Center February 8, 2018
Space Travel Present & Future
Attitude, Lunar Transfer Phase
PLANET MARS Presented By: Samia Amir & Tauseef Saeed NCBA & E
Lunar Descent Analysis
Space Technology and History
Derivation of the FSOA in Ariane 6 Specifications
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 Low Power Wide Area Network.
Name:S.SUBBARAO SECTION:-1 BRANCH:-EEE ID NO:
Presentation transcript:

Sanitation Requirements in Space: The issues of Space Debris and its Management V. Adimurthy Indian Space Research Organisation

Trans Lunar Injection Mid Course Corrections EPO 1 EPO 2 / 3 / 4 Lunar Transfer Trajectory at burn 5 Initial moon Orbit ~ 500 X 7500 km Lunar Insertion Maneuver 8 th Nov 2008 Final Orbit 100 km Polar By 13 th Nov ASTROSAT Moon at Launch PSLV –C11 22 nd Oct 06:40 hrs EPO of 255 x 22,932 km Burn # 1 23 rd Oct 09:22 hrs EPO of 305 x 37,719 km Burn # 2 25 th Oct 06:03 hrs EPO of 336 x 74,716 km Burn # 3 26 th Oct 07:18 hrs EPO of 348 x 1,65,016 km Burn # 4 29 th Oct 07:41 hrs EPO of 459 x 2,66,611 km Burn # 5 4 th Nov 04:59 hrs EPO of 972 x 3,79,856 km Lunar Orbital mass of 610 kg with 2 year life time. Scientific payload 55 kg +MIP 35 kg Expanding the scientific knowledge about the moon, upgrading India’s technological capability and providing challenging opportunities for planetary research for the younger generation CHANDRAYAAN-1 MIP experiment 14 th Nov

Chandrayaan 2: A Soft landing Mission to Moon &A minimum Soft Lander configuration requires  300 kg including Propellant. Operational duration 2 weeks. &With a rover the total mass is can be  400 kg  New technologies related to NGC, TTC, landing gear, robotics, thermal management in Lunar environment etc need to be developed for this mission

A Concept of Indian Manned Space Programme A Concept of Indian Manned Space Programme Motivation Resources/Energy Mining the Moon, planets and asteroids Scientific Basic research in physical and life sciences Manufacturing / Industrial growth New materials, pharmaceutical products Human Presence in Space gives the versatility to achieve the above GSLV MkII (4L40+S139)+ L37.5+ C12 + Orbital vehicle + Escape system Concept

Typical Intake and effluent mass budget of Space Crew Carbon Dioxide = 1.00 kg Respiration & Perspiration Water = 2.28 kg Urine = 1.50 kg Feces water = kg Urine solids = Feces solid = kg Sweat solid = kg Oxygen = 0.84 kg Food solids = 0.62 kg Water (Drink) = 1.62 kg Water in food = 1.50 kg Metabolised water = 0.40 kg ( per person per day) TOTAL = 4.98 kg Short duration mission Open cycle’ ECLSS ‘Open cycle’ ECLSS All required resources for the crew provided from storage and stores the waste generated without any re-cycling

Typical Space Toilet Systems Typical Space Toilet Systems

Aggressive Growth of microorganisms in Space Environment ReferenceSpace

Early Ammonia Servicer (EAS) Mounted on the exterior of ISS was dumped into space in July 2007 The Waste Products from Spacecraft may be dumped out into empty space generating Space Debris

Campaign Started on 22 nd October 2008 Object chosen was Early Ammonia Servicer (Catalogue No ) jettisoned from International Space Station in July, Mass of 640 kg, and dimensions of 2.5m x 1.2m x 1.7m. Inclination deg IADC Re-Entry Campaign 09 – 2008 Sl No. Agency Last Prediction with TLE on 03/11/08 TLE Epoch (UTC) Prediction (UTC) Error in minutes 1FSA, Russia 2008/11/03 03: /11/03 05:06 8 2ISRO, India 2008/11/ 03 03: /11/ 03 04: ESA 2008/11/03 03: /11/03 04: CNSA, China 2008/11/03 01: /11/03 05: ASI, Italy 2008/11/03 02: /11/03 04: NASA, USA 2008/11/03 02: /11/03 04: DLR, Germany* CNES, France* BNSC, UK* JAXA, Japan*---- TLE epoch No of Days from October 1, 2008 Prediction Epoch no. of Days from November 1, 2008 Prediction by VSSC Reentry occurred on 03 rd November 04:58 (UTC) * did not make prediction on last day

An Overview of Space Debris Environment

Evolution of Space Debris Environment Catalogued Space Objects 2008 Fragments ~ 6400 Spacecraft ~ 3100 L/V Stages ~ 1600 Mission Debris ~ 1500 Growth of Catalogued Space Object Population during Total Spacecrafts Mission Debris L/V Stages Fragments

Protected Regions & Debris Mitigation Measures GSO Altitude 15° 2000 km 200 km Limit the Release of Operational Debris Space Debris Risk Mitigation Measures On-orbit Collision Prevention Proximity Avoidance Avoid Intentional Fragmentation Minimize Potential for On-orbit Breakup Deorbiting/Reentry Lifetime Limitation Post Mission Disposal Reorbiting Protected Region AProtected Region B Passivation IADC Space Debris Mitigation Guidelines

PSLV-C11/Chandrayaan-1 Mission Space Object Proximity Analysis Launch Date : 22 Oct 2008 Lift Off not Recommended in Time Intervals Marked Maximum (Worst Case) Collision Probability Estimated to be More than 1×10 -6 for PSLV-C11 (in ascent Phase) and 1×10 -5 (Till the 1 st Apogee after Injection) for Chandrayaan-1

Some of the Recovered Orbital Debris upon Reentry Safe Zone for Controlled Reentry Delta-II 2 nd Stage Tank Woven Materials from Delta-II Foton Pressure Vessel Delta-II 3 rd Stage Motor Case Atlas Parts

Thank You