EGEE is a project funded by the European Union under contract IST-2003-508833 The EGEE project: An overview Frédéric Hemmer EGEE Middleware Manager Paradyn/Condor.

Slides:



Advertisements
Similar presentations
An open source approach for grids Bob Jones CERN EU DataGrid Project Deputy Project Leader EU EGEE Designated Technical Director
Advertisements

SWITCH Visit to NeSC Malcolm Atkinson Director 5 th October 2004.
EGEE-II INFSO-RI Enabling Grids for E-sciencE The gLite middleware distribution OSG Consortium Meeting Seattle,
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
Towards a Virtual European Supercomputing Infrastructure Vision & issues Sanzio Bassini
An overview of the EGEE project Bob Jones EGEE Technical Director DTI International Technology Service-GlobalWatch Mission CERN – June 2004.
LCSC October The EGEE project: building a grid infrastructure for Europe Bob Jones EGEE Technical Director 4 th Annual Workshop on Linux.
EGEE is proposed as a project funded by the European Union under contract IST The EGEE International Grid Infrastructure and the Digital Divide.
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 15 th April 2009 Visit of Spanish Royal Academy.
EGEE is a project funded by the European Union under contract IST Information Technology Revolution! Enabling Grids for E-Science in Europe.
Assessment of Core Services provided to USLHC by OSG.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
What is OMII-Europe? Qin Li Beihang University. EU project: RIO31844-OMII-EUROPE 1 What is OMII-Europe? Open Middleware Infrastructure Institute for Europe.
1 Introduction to EGEE-II Antonio Fuentes Tutorial Grid Madrid, May 2007 RedIRIS/Red.es (Slices of Bob Jone, Director of EGEE-II.
INFSO-RI Enabling Grids for E-sciencE The US Federation Miron Livny Computer Sciences Department University of Wisconsin – Madison.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
EGEE is proposed as a project funded by the European Union under contract IST EU eInfrastructure project initiatives FP6-EGEE Fabrizio Gagliardi.
DataTAG Research and Technological Development for a Transatlantic Grid Abstract Several major international Grid development projects are underway at.
Δ Storage Middleware GridPP10 What’s new since GridPP9? CERN, June 2004.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
GLite – An Outsider’s View Stephen Burke RAL. January 31 st 2005gLite overview Introduction A personal view of the current situation –Asked to be provocative!
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE II: an eInfrastructure for Europe and.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
EGEE is a project funded by the European Union under contract IST EGEE Middleware Frédéri c Hemmer GridPP 10 Meeting, 4 th June
Owen SyngeTitle of TalkSlide 1 Storage Management Owen Synge – Developer, Packager, and first line support to System Administrators. Talks Scope –GridPP.
Ian Bird LCG Deployment Area Manager & EGEE Operations Manager IT Department, CERN Presentation to HEPiX 22 nd October 2004 LCG Operations.
Ruth Pordes November 2004TeraGrid GIG Site Review1 TeraGrid and Open Science Grid Ruth Pordes, Fermilab representing the Open Science.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE Experience of using gLite for analysis of ATLAS combined test beam data A. Zalite / PNPI.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
LCG LCG Workshop – March 23-24, Middleware Development within the EGEE Project LCG Workshop CERN March 2004 Frédéric Hemmer.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
WP3 Information and Monitoring Rob Byrom / WP3
EGEE is a project funded by the European Union under contract INFSO-RI Middleware for the next Generation Grid Infrastructure Erwin Laure EGEE Deputy.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
NeSC Training Team Enabling, facilitating and delivering quality training in the UK and Internationally.
Guy Wormser IN2P3/CNRS, EGEE Applications Manager September 2003 EGEE is proposed as a project funded by the European Union under contract IST
CERN LCG Deployment Overview Ian Bird CERN IT/GD LCG Internal Review November 2003.
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
Conference xxx - August 2003 EGEE is proposed as a project funded by the European Union under contract IST Fabrizio Gagliardi EGEE designated.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
JRA1 Activity Feedback Frédéric Hemmer EGEE Middleware Manager and the JRA1 team EGEE is a project funded by the European Union under contract IST
EGEE-II INFSO-RI Enabling Grids for E-sciencE Training in EGEE-II Mike Mineter (Some slides from Brendan Hamill)
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
Breaking the frontiers of the Grid R. Graciani EGI TF 2012.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
EGEE Middleware Activities Overview
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
Long-term Grid Sustainability
Future EU Grid Projects
The EGEE project: An overview Frédéric Hemmer EGEE Middleware Manager
Peter Clarke EGEE Peter Clarke
Presentation transcript:

EGEE is a project funded by the European Union under contract IST The EGEE project: An overview Frédéric Hemmer EGEE Middleware Manager Paradyn/Condor Week, April 16, 2004

Paradyn/Condor Week, April 16, Contents EGEE - what is it and why is it needed? Grid operations – providing a stable service Grid middleware – current and future Networking activity Summary The material of this talk is the work of many people in EGEE and LCG Despite its name EGEE is an International project involving in particular Israel, Russia and US

Paradyn/Condor Week, April 16, Background Networking, commodity computing and distributed software tools became ripe for Grid technology to start become available at the end of the 1990’s Many public funded projects (in the US and in the EU) launched since Grid computing a key activity of the EU programmes Industrial and commercial Grids have been following (see a good sample on the portal and also Major IT vendors involved in Grid activity

Paradyn/Condor Week, April 16, EGEE: Why? Access to a production quality grid will change the way science and business is done Current Grid R&D projects run to completion within the next few months or next year The EGEE partners have already made major progress in aligning national and regional Grid R&D efforts, in preparation for EGEE EGEE will preserve the current strong momentum of the European Grid community and the enthusiasm of the hundreds of young European researchers already involved in EU Grid projects (>150 in EU DataGrid alone)

Paradyn/Condor Week, April 16, EGEE Manifesto: Enabling Grids for E-science in Europe Applications Geant network Grid infrastructure Goal Create a wide European Grid production quality infrastructure on top of present and future EU RN infrastructure Build On: EU and EU member states major investments in Grid Technology International connections (US and AP) Several pioneering prototype results Large Grid development teams in EU require major EU funding effort Approach Leverage current and planned national and regional Grid programmes Work closely with relevant industrial Grid developers, NRENs and US-AP projects

Paradyn/Condor Week, April 16, EGEE Partners Leverage national resources in a more effective way for broader European benefit 70 leading institutions in 27 countries, federated in regional Grids

Paradyn/Condor Week, April 16, EGEE Project Structure JRA1: Middleware Engineering and Integration JRA2: Quality Assurance JRA3: Security JRA4: Network Services Development SA1: Grid Operations, Support and Management SA2: Network Resource Provision NA1: Management NA2: Dissemination and Outreach NA3: User Training and Education NA4: Application Identification and Support NA5: Policy and International Cooperation 24% Joint Research28% Networking 48% Services Emphasis in EGEE is on operating a production grid and supporting the end- users

Paradyn/Condor Week, April 16, EGEE Applications EGEE Scope : ALL-Inclusive for academic applications (open to industrial and socio-economic world as well) The major success criterion of EGEE: how many satisfied users from how many different domains ? 5000 users (3000 after year 2) from at least 5 disciplines Two pilot applications selected to guide the implementation and certify the performance and functionality of the evolving infrastructure: Physics & Bioinformatics Application domains and timelines are for illustration only

Paradyn/Condor Week, April 16, The pilot applications High Energy Physics with LHC Computing Grid ( relies on a Grid infrastructure to store and analyse petabytes (10 15 bytes) of real and simulated data. LCG is a major source of resources, requirements and a hard deadlines with no conventional solution available In Biomedics several communities are facing equally daunting challenges to cope with the flood of bioinformatics and healthcare data. Need to access large and distributed non-homogeneous data and important on-demand computing requirements

Paradyn/Condor Week, April 16, EGEE Implementation From day 1 (1 st April 2004) Production grid service based on the LCG infrastructure running LCG-2 grid middleware LCG-2 will be maintained until the new generation has proven itself (fallback solution)  VDT support for Condor/GT2 based code is needed 1H05 at least In parallel develop a “next generation” grid facility Produce a new set of grid services according to evolving standards (Web Services) Run a development service providing early access for evaluation purposes Will replace LCG-2 on production facility in 2005 Globus 2 basedWeb services based EGEE-2EGEE-1LCG-2LCG-1 EDGVDT... LCG EGEE...AliEn

Paradyn/Condor Week, April 16, EGEE and LCG EGEE builds on the work of LCG to establish a grid operations service LCG: a worldwide collaboration of The LHC experiments The Regional Computing Centres Physics institutes Mission: Prepare and deploy the computing environment that will be used by the experiments to analyse the LHC data Strategy: Integrate thousands of computers at dozens of participating institutes worldwide into a global computing resource Rely on software being developed in advanced grid technology projects, both in Europe and in the USA

Paradyn/Condor Week, April 16, Grid operations Create, operate, support and manage a production quality infrastructure Offered services: Middleware deployment and installation Software and documentation repository Grid monitoring and problem tracking Bug reporting and knowledge database VO services Grid management services

Paradyn/Condor Week, April 16, Operations Structure Implement the objectives to provide Access to resources Operation of EGEE as a reliable service Deploy new middleware and resources Support resource providers and users With a clear layered structure Operations Management Centre (CERN)  Overall grid operations coordination Core Infrastructure Centres  CERN, France, Italy, UK, Russia (from M12)  Operate core grid services Regional Operations Centres  One in each federation, in some cases these are distributed centres  Provide front-line support to users and resource centres  Support new resource centres joining EGEE in the regions  Support deployment to the resource centres Resource Centres  Many in each federation of varying sizes and levels of service  Not funded by EGEE directly 50+ ~ instances

Paradyn/Condor Week, April 16, EGEE Computing Resources Resource Centers foreseen in the project RegionCPU nodesDisk (TB)CPU NodesDisk (TB) CERN UK + Ireland France Italy North South West Germany + Switzerland South East Central Europe Russia Totals April 2004: 10 sitesJuly 2005: 20 sites

Paradyn/Condor Week, April 16, Deployment Status Core Sites already integrated With the other sites (currently running LCG-1), the expected capacity will exceed the previsions foreseen for 2004: around 4000 CPUs at about 30 sites SiteCPU CERN324 FZK144 PIC160 FNAL4 CNAF715 Nikhef250 Taipei98 RAL146 Total1841

Paradyn/Condor Week, April 16, Deployment Issues Need to expand on existing LCG service while maintaining stability Add more sites/resources (some have no previous experience with grids)  Experience has shown that this can be effort consuming  Problematic sites have been causing problems for the whole system Introduce applications and VOs from non-HEP (Bio-medical)  Need to clarify processes and information flow Portability Support for further platforms (currently just RedHat 7.3) Middleware dependencies and packaging Middleware Support Deterministic Support Model has been formalized Essential to have (so far excellent) VDT support for Condor/Globus “24x7” operational support Currently have GOC at RAL Being replicated at Taipei (and maybe Canada?) Prototype accounting system (based on R-GMA) ready for the release in April 2004 (testing, documentation and packaging done)

Paradyn/Condor Week, April 16, Expected Developments in 2004 General: LCG-2 will be the service run in 2004 – aim to evolve incrementally Goal is to run a stable service Some functional improvements: Extend access to MSS – tape systems, and managed disk pools Distributed vs replicated replica catalogs  To avoid reliance on single service instances Operational improvements: Monitoring systems – move towards proactive problem finding, ability to take sites on/offline; experiment monitoring Continual effort to improve reliability and robustness Develop accounting and reporting Address integration issues: With large clusters, with storage systems Ensure that large clusters can be accessed via grid Issue of integrating with other applications and non-LHC experiments New release foreseen end April 2004

Paradyn/Condor Week, April 16, EGEE Middleware Activity Hardening and re-engineering of existing middleware functionality, leveraging the experience of partners Activity concentrated in few major centers and organized in “Software clusters” Key services: Data Management (CERN) Information Collection (UK) Resource Brokering, Accounting (Italy-Czech Republic) Quality Assurance (France) Grid Security (Northern Europe) Middleware Integration (CERN) Middleware Testing (CERN)

Paradyn/Condor Week, April 16, Characteristics of the new middleware Develop a lightweight stack of generic middleware useful to LHC experiments and BioMedicals based upon existing components Biomedical applications have important security requirements (e.g. confidentiality) that need to be addressed. Focus is on re-engineering and hardening Early prototype and fast feedback turnaround envisaged Use a service oriented approach A note on OGSI/WSRF/WS/…. Still discussing – nothing has settled yet Need to take a step back Focus on the service decomposition, semantics, interplay rather than the envelope WS seems to provide a useful abstraction Widely used in industry, Grid projects, Internet computing (Google, Amazon) Need to follow standardization efforts to be able to adopt them once settled

Paradyn/Condor Week, April 16, Middleware approach Formed a design team with members from AliEn VDT EDG Started intense technical discussion to Break down the proposed architecture to real components Identify critical components (and what existing software to use for the first instance of a prototype) Define semantics and interfaces of these component Focus on key services discussed; exploit existing components Initially an ad-hoc installation at CERN and Wisconsin Aim to have first instance ready by end of April Open only to a small user community Expect frequent changes (also API changes) based on user feedback and integration of further services Enter a rapid feedback cycle Continue with the design of remaining services Enrich/harden existing services based on early user-feedback all members will be part of EGEE as of April 1 st From US and Europe

Paradyn/Condor Week, April 16, Initial Services Data management Storage Element  SRM based; allow POSIX-like access Workload management Computing Element  Allow pull and push mode More discussions needed Information and monitoring Security Guiding principles: Lightweight services  Easily and quickly deployable Interoperability  Allow for multiple implementations (medium/long term) –Being based on WS should help Co-existence with deployed infrastructure  Run as an application Security: Need to integrate components with quite different security models Start with a minimalist approach based on VOMS and myProxy

Paradyn/Condor Week, April 16, Towards a prototype Access service: AliEn shell, APIs Information & Monitoring: R-GMA CE: AliEn CE, Condor-G, Globus gatekeeper, LCAS/LCMAPS Security: VOMS, myProxy Workload mgmt: AliEn task queue; EDG-WMS SE: SRM (Castor), GridFTP, GFAL, aoid File Transfer Service: AliEn FTD File and Replica Catalog: AliEn File Catalog, RLS Initial prototype components considered for April’04 To be extended/changed

Paradyn/Condor Week, April 16, Condor Team contributions to EGEE Middleware Many years of experience in designing and running real world distributed systems Essential for relatively new Grid Middleware technologies Many of the problems we see today are related to robustness, deployment, scalability Proven scheduling technologies Condor/Condor-G Leadership in the new Middleware Design Group Monthly face-to-face meetings covering all essential parts of Middleware Miron Livny’s influence and contributions are essential Support of Middleware Components for the existing LCG-2 code base (VDT) Condor, Globus GT2 leveraging the NSF Middleware Initiative Proactive, bilateral problem resolution and enhancements US contribution to EGEE project Essential, as many applications are/will be worldwide, not only European

Paradyn/Condor Week, April 16, EGEE Networking Activity Dissemination and outreach Lead by TERENA User training and induction Lead by Unv Edin. (NeSC) The success of EGEE is measured by the impact it has on collaborative European science The goal is to support communities of users Therefore induction and training have a high priority from the outset Application identification and support Two pilot application centers (for high energy physics and biomedical grids) One more generic component dealing with longer term recruitment and support of other communities Policy and International cooperation Establish Grid policy forum Coordinate relations with other projects (EU and beyond) Training courses (based on EDG tutorials) will be available from July 2004 Grid school near Naples, Italy July 2004:

Paradyn/Condor Week, April 16, Summary EGEE is expected to deliver a production Grid infrastructure for scientific applications The project just started weeks ago We have a running grid service based on LCG-2 All EGEE activities are well advanced and ready to go Biomedical and physics are the pilot applications domains that will lead the exploitation of the EGEE Grid infrastructure US contribution essential through support of existing middleware and design of new generation middleware The first project conference will be held in Cork (Ireland) nd April

Paradyn/Condor Week, April 16, To know more: EGEE – Further Information