SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
Hydro Electric Power Plant
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore.
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
BGREI Central Steering Committee Meeting
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
INDIRA GANDHI SUPER THERMAL POWER PROJECT 3X500 MW Design, Engineering, Supply, Erection, Testing and Commissioning of Coal Handling System.
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
11th National Food Security Mission Executive Committee Meeting on Department of Agriculture Andhra Pradesh 1.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Hyderabad city water supply system
Polavaram Irrigation Project
Polavaram Irrigation Project
City:- Corporation of City of Panaji
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
PRESENTATION ON KALESHWARAM PROJECT
Review of CADWM Projects Under PMKSY
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
Polavaram Irrigation Project
#82 Virtual Review by Hon’ble CM dt: 19th Nov. 2018
Polavaram Irrigation Project
#85 Virtual Review by Hon’ble Chief Minister, Dt. 21st January 2019
#87 Virtual Review by Hon’ble Chief Minister Dt: 04 FEB 2019
#89 VIRTUAL REVIEW BY HONBLE CHIEF MINISTER Dt. 25th FEBRUARY 2019
Polavaram Irrigation Project
#86 Virtual Review by Hon’ble Chief Minister, Dt. 28th January 2019
Presentation transcript:

SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT) AYACUT MAP

SRIPADA SAGAR PROJECT TOTAL 2244.77 1 408.85 2 98.92 3 1737 PKG No. Description Awarded Bid Amount Rs. in Crs. 1 Construction of Sripada Sagar Project acress Godavari river at Yellampally (V), Ramagundam(M), Karimnagar Dt. (Stage-I) SCANSKA Cementation Ltd. 408.85 2 Excavation of approach channel Construction of pump house, Supply and commissioning of pumping machinery to lift 8.5 TMC, Transformers, sub-stations, Pressure mains Supply and layers of pipelines from Barrage to NTPC Balancing Reservoir. M/s.Subhash Projects & Marketing(P) Ltd. 98.92 3 Stage-II, Phase-I of Sripada Sagar Project- supply, installation and commissioning of pumping machinery, transformers, sub-stations, pressure mains including construction of pump house all civil structures to irrigate 2.00 Lakh acres in upland areas of Karimnagar (Dist.) M/s. IVRCL-SEW- Navayuga (JV) 1737 TOTAL 2244.77

SRIPADASAGAR L. I. SCHEME 1 Project Profile : Construction of Sri Padasagar Project across river Godavari (St-I) Ph-I Supply of 8.5 TMC of water to NTPC (St-I, Ph-II) Lifting 12 TMC to irrigate 2 Lakh Acres (St-II, Ph-I) 2 Administrative Sanction G. O. Ms. No. 71, I & CAD (PW) GVI, Dt: 16-7-2004 for Rs. 900 Crores 3 No. of EPC Packages : 3 Nos. 4 Agt. Value of 3 Pkgs Rs. 2244.77Crs. 5 Budget Provision for 2006-07 (For GWUA) Rs. 1240 Crs. 6 Expenditure of the Project 2004-05 Rs. 20.44 Crs. 2005-06 Rs. 202.07 Crs. TOTAL Rs. 222.51 Crs. 7 Utilisation ( Stg-I, Ph-I, Ph-II & Stg-II,Ph-I) 20.5 TMC Ultimate 180.50 TMC 8 Ayacut New Ayacut 2,00,000 acres

SRIPADASAGAR L. I. SCHEME 9 Lift-I Lift Height : 96 M No. of Pumps 4 Nos. Total pumps capacity 10.8 MW 10 Lift-II 120 M 13 MW 11 Lift-III 80 M 5,25 MW x 2, 8.26 MW x 2 12 Lift-IV 50 M 2 Nos. 0.50 MW 13 Power required (Stg-I, Ph-II) – water supply to NTPC 9 MW 14 Power required (Stg-II, Ph-I) – Irrigation 2L Acs 137 MW

SRIPADASAGAR L. I. SCHEME 15 Land Acquisition Required : 15,981 acres Acquired 430 acres Requisitioned 16 Est. Cost for LA Rs. 222.00 Crores 17 Est. Cost for R & R Rs. 500.00 Crores 18 Mobilisation Advance Paid Recovered 2004-05 Rs. 20.44 Crs. 2005-06 Rs.106.05 Crs. 3.31 Crs. Total Rs. 126.49 Crs. 3.31 Crs. 19 Target date for completion 10/2007

SRIPADASAGAR PROJECT Package No. 1 : (Stg-I Ph-I) Construction of Sripada Sagar Project across Godavari river at Yellampally (V), Ramagundam(M), Karimnagar Dt. to store 20 TMC at FRL + 148M. Name of the Contractor : ITD Cementation India Ltd. Agreement Amount : Rs. 408.85Crs. Agreement Date : 07-11-2004/17-2-2005 Period of Completion : 36 Months(10 milestones) Date of completion : 06-11-2008 Survey work : Completed Designs : Alignment of barrage - FINALISED Earth bunds approved by CE/CDO; Spillway under approval in CE/CDO Execution : Drilling of exploratory bore holes in river for spill way & earth bund : Completed Excavation of Cutoff trenches for right side & left side earthen bunds : Completed Exc. of Cutoff trenches for spillway : In progress Qty. of Earthwork done : 2.43 L Cum against 3.062 L Cum. Expenditure : Rs. 63.59 Crores. (including Mob. Advance Rs.36.04Crs.) against Rs. 408.85 Crores. Land Acquisition : Required = 8745 Acres; Acquired=225 Acres Requisitioned = 8456 Acs.

SRIPADASAGAR PROJECT Water Supply to NTPC Package No.2 : (Stg-I Ph-II) Excavation of approach channel Construction of pump house Supply and commissioning of pumping machinery to lift 8.5 TMC, Transformers, sub-stations Pressure mains Supply and laying of pipelines to NTPC Reservoir Name of the Contractor : M/s.Subhash Projects & Marketing(P) Ltd. Agreement Amount : Rs. 98.92 Crs. Agreement Date : 07-04-2005 Period of Completion : 18 Months (6 milestones) Date of completion : 06-10-2006 Survey work : Completed Designs : Designs for pressure mains submitted to CE/CDO & are under scrutiny : Designs for pump houses, pumps etc. to be submitted by Agency Designs of pipelines : Yet to be furnished by the Agency. Execution : Fabrication Unit erected at site for manufacture of pipes Alignment of pressure mains, location of approach channel and intake well : under approval by CE/CDO Expenditure : Rs.12.48Crs. (incl. Mob. Adv.) against Rs.98.92Crs. Land acquisition : Required 70 Acres,

SRIPADASAGAR PROJECT (Stg-I, Ph-II) Water Supply to NTPC 1 Expenditure 2005-06 Works : Rs. 7.53 Crs. Mob. Adv. Rs.4.95 Crs. Total Rs. 12.48 Crs. 2 Land Acquisition Total Required 55 acres Acquired Nil Requisitioned 15 Acres 3 Utilization : 8.5 TMC 4 Lift-I Lift Height 50 M No. of Pumps Total pumps capacity 3300 HPs. 5 Power required 9 MW

STAGE-II, PHASE-I (Irrigation) SRIPADASAGAR PROJECT STAGE-II, PHASE-I (Irrigation) SALIENT FEATURES : 1 PROJECT PROFILE Installation and commissioning of pumping machinery, transformers, sub-stations, pressure mains including construction of pump house all civil structures to irrigate 2.00 Lakh acres in upland areas of Karimnagar (Dist.) 2 Admn. Sanction : G. O. Ms. No. 149, I & CAD, Dt: 16-8-2005 for Rs. 1688.86 Crores 3 Expenditure 2005-06 Rs.146.44 Crs. 4 Land Acquisition Total Required 15,000 acres Acquired Nil Requisitioned 407 Acres

SRIPADASAGAR PROJECT STAGE-II, PHASE-I 5 Forest Land : 285 Acres 6 Utilisation 12 TMC 7 Ayacut New Ayacut 2 Lakhs acres Stabilisation 8 Lift-I Lift Height 96 M No. of Pumps 4 Nos. Total pumps capacity 10.8 MW 9 Lift-II 120 M 13 MW 10 Lift-III 80 M 5,25 MW x 2, 8.26 MW x 2

SRIPADASAGAR PROJECT STAGE-II, PHASE-I 11 Lift-IV Lift Height : 50 M No. of Pumps 2 Nos. Total pumps capacity 0.50 MW 12 Power required 137 MW 13 Mobilisation Advance 2005-06 Paid Recovered Rs. 85.50Crs Rs. 3.31Crs.

SRIPADASAGAR PROJECT Package No.3 : Stage-II, Phase-I of Sripada Sagar Project- supply, installation and commissioning of pumping machinery, transformers, sub-stations, pressure mains including construction of pump house all civil structures to irrigate 2.00 Lakh acres in upland areas of Karimnagar (Dist.) Name of the Contractor : M/s. IVRCL-SEW- Navayuga (JV) Agreement Amount : Rs. 1737Crs. Agreement Date : 03-04-2005 Period of Completion : 30 Months(10 milestones) Date of completion : 02-10-2007 Utilization : 12 TMC (Lifting) Power Required : 137 MW Investigation : Pressure mains completed : Pump house & gravity canal under progress Designs : Designs of pressure mains and alignment submitted to CE/CDO for approval Mobilization Advance paid : 85.50 Crores Mob. Advance recovered : Rs. 3.31 Crs. Land Acquisition : Required : 2000 Acres; Requisitioned : 437 Acres. (Rs. 5.00 Crores deposited with Revenue Authorities)