Staner Court, Manston Road, Ramsgate. Incident number 483 3 rd July 2001 All comments/observations are made with the benefit of hindsight and non- attendance.

Slides:



Advertisements
Similar presentations
Sprinkler Systems and Standpipe Operations
Advertisements

THE RAPID INTERVENTION TEAM
Report # Captain escapes injury from chainsaw. Report Number: Report Date: 06/04/ :16.
Report # Two FFs become disoriented during fire. Report Number: Report Date: 02/23/12 14:43 Synopsis Two FFs become disoriented During fire.
Fire Behaviour Ventilation. Aim To provide students with information to give them an understanding of the behaviour of fire.
FIREFIGHTER I • LESSON 7.
Stefan Bengtsson Södra Älvsborg Fire Service. Case study: Fire in roof attic, apartment building Contains the description of fire development, tactics.
Intermediate SFFMA Objectives: Hrs received.
Service Delivery 3 Salvage. Aim To introduce students to salvage considerations within the Fire Service.
ACCOUNTABILITY DMC. The purpose of an accountability system is to track the location and objectives of all personnel operating within the hazard zone.
Emergency Evacuation Zayed University, Dubai Campus.
Apparatus Assignments Presentation January 24, 2011.
24 June 2014 AOA Ops and Safety Conference 787 Incident Heathrow Ian Witter.
Buckinghamshire and Milton Keynes Fire Authority RADIO LECTURE.
1 Lincolnshire Fire & Rescue Training Centre FIXED INSTALLATIONS DRY AND WET RISERS COMPETENCE STATEMENT 373.
Let’s take a virtual tour the PEIFFA Fire School Facility Entering through the gates to our Training Centre heading north, you can see the Classroom and.
Harrow Court, Stevenage 2nd Feb 2005
Blackwood Fire Company
Riding Assignments Presentation February 28, 2011.
Structural Firefighting Search and Rescue
Fire Marshal & Medical Emergency Training Please Sign In
East Metro Training Group Tactical Training 1 st Quarter, 2011.
Training On Demand. Purpose To provide fire fighters at an emergency incident a team with pre-assigned duties aimed at rescuing downed, lost or trapped.
Fire Suppression Techniques IFSTA Chapter 14
Tactics.  Garden Apartments  Town Homes  Apartment Buildings 2.
Organisational Management and Development 2 Incident Command.
Rapid Intervention Team & MAYDAY Procedures
MAYDAY, MAYDAY, MAYDAY Having the confidence, knowledge, and courage to call for help when you need it!
Fresno County Fire Protection District. Fire Sprinklers Systems Residential – 13D October 30, 2007.
Service Delivery 2 Collapsed Structures. Aim To provide information that will assist students to deal with incidents involving collapsed structures safely.
13 Search and Rescue. 2 Objectives (1 of 2) Define search and rescue. Describe the importance of scene size- up in search and rescue. Describe search.
WYVERN 10K MARSHAL BRIEFING. Briefing Structure The Course Race Day What the Teams do Marshalling The Road Order Safeguarding our junior runners Communication.
Transport Railways Hazards and Features. Aim To instruct students on the features, hazards and operational procedures when attending incidents on or near.
Monterey County Fire Operations Manual HIGH-RISE FIREFIGHTING GUIDELINES.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Select and deploy the appropriate hose lines to accomplish fire confinement and extinguishment.
Fire Fighting Module 1 Fire Suppression Operations  Battalion Chief Brett Bowman  Captain Jim Forgo.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Overview Select and deploy the appropriate hose lines to accomplish fire confinement.
High Rise October DISPATCH E82, E83, E81, E97, E86, E95, T82, T98, R81, R83, R97, B8, B9, OSO respond to a reported structure fire at 777 W. Lake.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Overview Identify the unique construction factors of single-family dwellings. Recognize the.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Identify the unique construction factors of single-family dwellings. Recognize the basic problems.
Search & Rescue Ins and Outs Presented for use by Emory Arnold For.
21 Fire Suppression Skill Drills. 2 Objectives Apply water using the direct, indirect or combination attack. Use a large handline using the one- or two-
Search and Rescue.
ELGIN FIRE DEPARTMENT - TRAINING DIVISION INCIDENT MANAGEMENT SYSTEM.
SIZE-UP The systematic process consisting of the rapid, yet deliberate, consideration of all critical fire ground factors that leads to the development.
FIRE FIGHTER SURVIVAL The RAPID INTERVENTION TEAM.
“What Would You Do?” Three people on your crew are in a tent using illegal drugs. Three people on your crew are in a tent using illegal drugs. The Division.
WSSC Commissioners EMERGENCY EVACUATION PROCEDURES WSSC CONSOLIDATED OFFICE BUILDING.
SOM COOP Drill August 10, Agenda Objectives Process of the drill Scenario Drill Wrap-up.
Part C: Class D Fires and Tactical Considerations.
Mine Emergency Preparedness Training Mine Recovery.
INCIDENT MANAGEMENT SYSTEM SETS & REPS DEPLOYMENT.
1. 2  Dispatch information  Day of week  Time of day  Pre-incident survey  Observations  Building construction, layout  Bystanders.
INCIDENT MANAGEMENT SYSTEM SETS & REPS RADIO PROCEDURES.
Brian Ward Founder FireServiceSLT.  I, nor any of the organizers, involved in the production of this conference are liable for personal injuries that.
The Stuarts Great Fire of London 1666 Samuel Pepys Diary.
Division/Group Supervisor, Roles and Responsibilities.
13 Search and Rescue.
GENERAL ORDER INITIAL OPERATIONS AT HIGH RISE STRUCTURE FIRES HOWARD COUNTY DEPARTMENT OF FIRE AND RESCUE SERVICES AND FIFTH DISTRICT VOLUNTEER.
Quarterly Training May  Terminology  Building Construction  Keys to Incident Resolution  First Alarm STRIP MALL S.O.G.
Fire Ground Roles & Responsibilities On scene reports & Truck and seat assignments.
Overall overview of Plumbers London. Unlike popular belief, plumbing is an extremely intriguing and varied subject. The wide variety of work involved.
Welcome To High Rise Operations ! Like The Jefferson's...
HOARDING & DWFire.
Water Works.
CHAPTER 15 Ventilation: Tactical Priorities
February 2019.
Harrow Court, Stevenage 2nd Feb 2005
October 2014 Meeting Training
Bella Vista Fire Department Procedures on Sprinkled Buildings
Presentation transcript:

Staner Court, Manston Road, Ramsgate. Incident number rd July 2001 All comments/observations are made with the benefit of hindsight and non- attendance at incident

Construction Constructed in Floors 6 flats per floor 90 dwellings /occupancy 230 4” Dry riser

Most likely flat

Time of call 1104hrs from auto dialler One pump sent due to daytime hours Control were dealing with 10 pump relief for Canterbury pub fire East Division LSDG meeting going on at Canterbury Ramsgate RPL at Canterbury on standby Thanet initial pump 4 riders

En route smoke visible swirling around at mid height, indicating a window open or broken. Call to control confirming fire full PDA required, 3 pumps and a height vehicle.

On arrival Resident told Sub O told fire on 5 th floor Another resident said the fire was on the 10 th floor Proceeded up stairs and searched from 5 th floor

Equipment Fire ground radio 2 x BA BAECO Board 2 x 45mm hose & branch Breaking in tools

Crew reached 9 th floor and felt that it was the fire floor, but could not see any obvious signs of fire, apart from faint smell of burning and limited smoke in the area. Sub O checked 10 th floor then returned.

Jet set into dry riser and water on. Pump operator has charged dry riser and then set into hydrant. Hydrant defective and unable to turn on, next hydrant 3 lengths away. Remember crew of 4!

BA crew approach door to flat 57 from staircase lobby and attempt entry. First attempt door opens, forcibly closed, second attempt door remains fully opens and debris falls into doorway preventing closure. Serious fire within flat and gas cooling undertaken by BA team, ineffective. Team is driven back by heat & branch left in doorway. BA crew rapid retreat to staircase doorway and find it difficult to open.

Heat & smoke in stairwell has driven Sub O downstairs within the smoke. On reaching 5 th floor he ran onto floor level, he grabs BA team, whose stage 2’s are hot to touch. TL now in attendance.

No communication with ground floor, pump operator sees smoke issue from ground floor entrance. Second pump Sandwich now in attendance. Make pumps 10, 5 mins later make pumps 15. Additional pumps arriving unable to make contact with first crew, BA teams ascend stairway into smoke, hot water running down staircase and into lift from burnt hose line.

First crew unable to get back into stair case and consider using lift. On calling lift discover it had two inches of hot water in it. Eventually crews make it to ground floor. Make pumps 20

Later on Bridgehead established on 8 th floor RAF Sea King used Silver control established - Tri service Triage reception set up Staging points for relaying resources Paramedic stationed at half way point Contractors working on the roof

Points to consider Water supply Opening flat door priority Other aggressive firefighting tactics