FAIR – Facility for Antiproton and Ion Research

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
FAIR March 20, 2007 D. Krämer GSI/FAIR Division Technical Status: status of layout status of civil engineering items under current discussions status of.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
SIS 100 main magnets G. Moritz, GSI Darmstadt (for E. Fischer, MT-20 4V07)) Cryogenic Expert Meeting, GSI, September 19/
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The FAIR Project Walter F.J. Müller, GSI, Darmstadt CBM Technical Coordinator FAIR Joint Core Team 2 nd CBM India Meeting, VECC, Kolkata, July 2007.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 3rd Annual Report meeting January 29, 2008 J. Eschke,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Cold testing of rapidly-cycling model magnets for SIS 100 and SIS 300 – methods and results P. Schnizer, E. Fischer, E. Floch, J. Kaugerts, M. Kauschke,
Chinese Contributions to FAIR Hushan Xu Institute of Modern Physics, CAS, Lanzhou
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR CNI 2nd Annual Report meeting October 11, 2007 J. Eschke, GSI DIRAC-Phase-1.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
(Procurement, testing of magnets)
Ways to industry participation in CLIC 24th October, 2017
FAIR – the Universe in the labororatory
and collaboration with France
Presentation transcript:

FAIR – Facility for Antiproton and Ion Research In 2015, 8 years and 1187 Million € later FAIR – Facility for Antiproton and Ion Research GSI GmbH + FAIR GmbH Observers CN DE ES FI FR GB GR IN IT PL RO RU SE

Present Committee Structure of the International Project FAIR CN DE ES FI FR GB GR IN IT PL RO RU SE 13 potential ‘M e m b e r s t a t e s’ ISC International Steering Committee STI Working Group Scientific + Technical Issues AFI Working Group Administrative + Funding Issues FAIR Project PAC QCD LFI Legal Framework Issues PAC NUSTAR PAC APPA FCI Full Cost Issues Mini-TACs Cryogenics Warm magnets Cold magnets Power Supplies Beam Instrumentation p-Linac TAC CORE Cost Review Groups Observers:

FAIR Baseline Technical Report CN DE ES FI FR GB GR IN IT PL RO RU SE FAIR Baseline Technical Report Official FAIR project description 6 Volumes with more than 3500 pages and more than 2600 authors FAIR BTR Volume 1 Executive Summary Volume 2 Accelerator and Scientific Infrastructure Volume 3A Experiment Proposals on QCD Physics 3.1 CBM Volume 3B Experiment Proposals on QCD Physics 3.2 PANDA 3.3 PAX 3.4 ASSIA Volume 4 Experiment Proposals on Nuclear Structure & Astro Physics (NUSTAR) 4.1 LEB-SuperFRS 4.2 HISPEC/DESPEC 4.3 MATS 4.4 LASPEC 4.5 R3B 4.6 ILIMA 4.7 AIC 4.8 ELISe 4.9 EXL Volume 5 Experiment Proposals on Atomic, Plasma & Applied Physics (APPA) 5.1 SPARC 5.2 HEDgeHOB 5.3 WDM 5.4 FLAIR 5.5 BIOMAT Volume 6 Civil Construction and Safety For down load of the report: http://www.gsi.de/fair/reports/btr.html Introduce BTR in particular Executive Summery. Vol 3 to 5 contain: Technical proposal of en experiment and one finds: Executive Summary, Introduction and Overview, Physics case, Systems.description, Implementation and Installation, Commissioning, Operation, Safety , Organization and Responsibilities, Planning, Relation to other Projects , Other issues , References and Acknowledgements

EU support for FAIR related activities in FP6 EU-6FP-CNI: FAIR injector SIS18 intensity upgrade, HADES upgrade + R3Bmagnet EU-Support: 10,4 M€ EU-6FP-Design Study: Secondary Beams (RIB and Antiprotons) EU-Support: 9 M€ EU-6FP-I3 programmes I3HadronPhysics: FAIR related EU-Support: 10,8 M€ EURONS: FAIR related EU-Support: 2 M€

Project Status and next steps: Building Development plan legally settled All environmental impact studies are accepted; Re-forestation and natural compensation measures are concluded and contractually settled  Controlling report for the preparatory phase accepted by GSI Supervisory Board Core facility and Specifications defined Layout defined Project cost estimates (cost book, WBS) scrutinized and validated by expert groups Prototyping has started Scientific base programme is defined Baseline Technical Report ready and issued 21 March (~ 3500 pages, ~2500 authors)

Project Status and next steps:  Legal documents and Governance structure (two-company model) finalized and agreed upon by the ISC (by laws to be completed; tax status to be confirmed)  Roadmap presented to the ISC. Goal: foundation of FAIR GmbH in May/June 2007 ( Joint Core Team) The International Steering Committee confirmed all this joint preparatory work and its results as fully conforming to the requirements of the FAIR MoU and as " the Project." Consequence: all conditions to finalize negotiations on governmental level are met.

Project Status and next steps: 1. Finalization of by laws (AFI sub-group: national experts most welcome) 2. Establishment of the Joint Core Team (transition to FAIR GmbH); calls coming soon (after October ISC) 3. Appointment of shareholders 4. Negotiations and final checks of legal documents

Signature of Convention and Final Act Proposed FAIR – Roadmap: Establishment of FAIR GmbH STI AFI joint meeting ISC/SH ConventionFinal Act meetings ISC ISC AFI AoA 07/06 08 09 10 11 12 01/07 02 03 04 05 06 Nomination of Shareholders + Completion of negotiations Signature of Convention and Final Act Contracting Parties Negotiations (ongoing, 'till end of 2006) First meeting: start senior staffing Signature AoA Share-holders (SH) Constitutive Meeting of the Council Formation FAIR GmbH Convention, Final Act, AoA; Joint Core Team Bylaws, draft FAIR GmbH structure and kick-off staffing Mandate for IKAB ISC Convention, Final Act, AoA; Bylaws (first draft) Bylaws, draft FAIR structure AFI STI Monitoring of technical planning and project costs (ongoing process up to the formation of FAIR GmbH) Bylaw Subgroup Completion of draft Bylaws Elaboration of the Bylaws (ongoing) Joint Core-Team Technical project decisions (follow up design changes) / FAIR preparation tasks (ongoing process up to the foundation of FAIR GmbH) IKAB Technical evaluation of potential in-kind contributions (ongoing process up to the formation of FAIR GmbH)

DRAFT: Organizational plan of the FAIR GmbH External Committees: Scientific Advisory Committees Accelerator Advisory Committee Resource Review Boards DRAFT: Organizational plan of the FAIR GmbH Council - Shareholders assembly Management (2 managing directors) FAIR Director, Director for Finances and Administration management team (directors office) audit &controlling public relations EU projects safety Finances and Administration Research Accelerator Integration Financing and budget Bookkeeping & accounting Contract follow up General administration Mech. Interfacing quality management project coordination NUSTAR resource coordinator technical coordinator CBM HESR Electr. Interfacing Finance Committee Scientific Council visitors science prog. engineering documentation PANDA APPA Civil Construction planning Regulatory aspect & Permits NESR p-Bar TARGET RESR/CR Super-FRS p-LINAC SIS100 SIS300 HEBT + member states relations Injector Upgrade

DRAFT: FAIR Joint Core Team External Committees: Scientific Advisory Committees Accelerator Advisory Committee Resource Review Boards DRAFT: FAIR Joint Core Team Council - Shareholders assembly Management [1] management team [2] (directors office) audit &controlling public relations EU projects [1] safety Finances and Administration [4] Research [4] Accelerator [6] Integration Financing and budget Bookkeeping & accounting Contract follow up General administration Mech. Interfacing quality management project coordination NUSTAR resource coordinator technical coordinator CBM HESR Electr. Interfacing Finance Committee Scientific Council visitors science prog. engineering documentation PANDA APPA Civil Construction planning Regulatory aspect & Permits NESR p-Bar TARGET RESR/CR Super-FRS p-LINAC SIS100 SIS300 HEBT + member states relations [2] Injector Upgrade [FTE at startup]

SC magnets for SIS300 : France, Italy and GSI sc cable development curved dipole prototype BNL follow up of „GSI001“ 4 T, 1 T/s SIS300 Quadrupole Field calculations, Design, cryogenics

FAIR accelerator developments in Russia and Spain SIS300 BINP Novosibirsk IHEP Protvino + Rosatom UNK dipole Magnet, power converters, vacuum components on sc magnets for NESR/RESR e--Isotope Collider SIS100 JINP Dubna Short NUCLOTRON-type prototyp at GSI

FAIR accelerator developments in China and India Variable Energy Cyclotron Center, Kolkata Institute for Modern Physics Lanzhou Center of Advanced Technology Indore Institute for Plasma Physics Hefei Saha Institute of Nuclear Physics, Kolkata Superferric dipoles for Super-FRS and CR and high intensity beam stoppers

HESR Consortium FZ Jülich, TSL Sweden and HESR Consortium FZ Jülich, TSL Sweden and PANDA experiment collaboration Collaboration >350 participants 107 events/s TSL 14 m Pelletron Electron energy 4 - 8 MeV 30 m cooling length 30 m cooling length

Key technology: Fast Cycling Synchrotrons SIS100 magnets: 50 K yoke with superconducting coil (Nuclotron JINR Dubna) Developments: Reduction of AC losses during ramp, achievements: 40 W/m -> 13 W/m Bmax= 2 T, dB/dt = 4T/s, f = 1 Hz SIS 300 magnets: cos - magnet Developments: Reduction of AC losses during ramping by improved cable and coil design Efficient conductor cooling Bmax = 6 T, dB/dt = 1 T/s „GSI001“ 4 T, 1 T/s by BNL (HERA: 4 mT/s, RHIC: 70 mT/s, LHC: 8 mT/s)

Conclusions on Commitments for Accelerator parts CN DE ES FI FR GB GR IN IT PL RO RU SE Conclusions on Commitments for Accelerator parts No written commitments exist on in-kind contributions, besides Sweden for Cryring CN-China: Interest expressed verbally for design and construction of CR and Super-FRS dipoles DE-Germany: GSI: items to be specified FZ-Jülich: HESR design and construction ES-Spain: Dipoles NESR and RESR, power supplies, vacuum, FI-Finnland: items to be specified FR-France: items to be specified (design of SIS300 quadrupoles), GB-United Kingdom: items to be specified, meeting foreseen October 12th, GR- Greece: items to be specified, no contact so far IN-India: Energy Buncher (4x 80 t sc dipoles), beam stoppers, verbally agreed IT-Italy: SIS300 dipoles proposed verbally PL-Poland: items to be specified RO-Rumania: items to be specified RU-Russia: SIS100 magnets, SIS300 magnets, e--RIB collider,......... SE-Sweden: Cryring, part of Electron Cooler, other items to be specified