GW Lupton, Management Analyst Risk Management Planning Unit State Emergency Response Commission Risk Management Plan: Protecting the Community Florida.

Slides:



Advertisements
Similar presentations
BLR’s Safety Training Presentations
Advertisements

PSM National Emphasis Program for Chemical Facilities(NEP) Columbia Colstor, Inc.
Emergency Planning and Community Right to Know Carter Hanson / Patrick Cudahy 2011.
Resource Conservation and Recovery Act Authorizes EPA to identify hazardous wastes and regulate their generation, transportation, treatment, storage and.
Prepare + Prevent + Respond + Recover + Mitigate Louisiana State Police Emergency Services Unit.
FACILITY SAFETY: Creating a Safe and Secure Environment in the Community Health Center Presented by Steve Wilder, BA, CHSP, STS Sorensen, Wilder & Associates.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
EPCRA Emergency Planning and Community Right-to-Know Suzanne Powers
Superfund Amendments & Reauthorization Act (SARA TITLE III) OR Emergency Planning & Community Right-to-Know Act (EPCRA) Presented by Ian Ewusi IERC Field.
HISTORY. History of Emergency Management Within the DOE System The early years In the 1970s, DOE’s focus was on security and energy contingency planning.
OEHS Academy OEHS Academy New and Aspiring Principals OEHS Responsibilities Presented by: Office of Environmental Health and Safety Modification Date:
Contractor Management and ISO 14001:2004
Jack Harrah Governor’s Office of Emergency Services
Environmental Management Systems An Overview With Practical Applications.
How to Implement the CalARP Program
Risk Management Program Quality Assurance Program Plan David R. Taylor US EPA Region 9 Quality Assurance Office.
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
Erika White September 11,  1984: Methyl isocyanate release at Union Carbide in Bhopal, India - 2,000 immediate fatalities  1985: M ethylene chloride.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
Course Material 1.Overview of Process Safety 2.Compliance with Standards 3.Process Hazard Analysis 4.Standard Operating Procedures 5.Safe Work Procedures.
Process Safety Management of Highly Hazardous & Explosive Chemicals Contractor Pre-Qualification, Emergency Preparedness, Incident Investigation, Audits.
1 MEASURING THE EFFECTIVENESS OF THE NATION’S FOODSERVICE AND RETAIL FOOD PROTECTION SYSTEM.
PSM Covered Chemical Facilities National Emphasis Program.
Process Safety Management
Preliminary Assessment Tribal Emergency Response Preparedness Dean S. Seneca, MPH, MCURP Agency for Toxic Substances and Disease Registry Centers for Disease.
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
EPCRA1 The Emergency Planning and Community Right-to-Know Act (EPCRA) The Emergency Planning and Community Right-to-Know Act (EPCRA)
Oregon State Police Office of State Fire Marshal Emergency Planning & Response Section An Overview of the Superfund Ammendment & Reauthorization Act (SARA)
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
Process Safety Management
EPCRA BACKGROUND EPCRA 301 Toxics Release Inventory (TRI)(Form R)/ RMP (Risk Management Program) Federal Forms Tier Two Oreg on has HSIS.
Tim Date, Manager Risk Management Planning Unit
Hot Topics in CAA – 112(r) Federal Program Update GA AWMA REGULATORY UPDATE CONFERENCE Adam G. Sowatzka April 16, 2013.
ISAT 422: Environmental Management Disasters and Right to Know n Unlike OSHA, focus is on non-employees – Neighbors in community – Emergency responders.
1 E-Plan Web-Based Tier II Reporting System Emergency Planning and Community Right-to-Know Act (EPCRA)
Overview of the Emergency Planning and Community Right to Know Act Southern Plains Area USDA/ARS.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Ert 312 LECTURE 4 OSHA & DOSH.
Clean Air Act Section 112(r) Federal Program Update U.S. EPA Pacific Southwest Region Emergency Prevention and Preparedness February 15, 2007 CUPA Training.
By Jessica Shi Period 3. the Emergency Planning & Community Right-to-Know Act (EPCRA) was enacted by Congress in 1986 as the national legislation on community.
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
Chemical Facility Anti-terrorism Standards Since 2003, the Department of Homeland Security (DHS) has been working with its private sector partners in the.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Emergency Planning in your business St. Louis City LEPC General Meeting September 4, 2013.
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
1 NCLB Title Program Monitoring NCLB Title Program Monitoring Regional Training SPRING 2006.
Office of State Fire Marshal Oregon State Police Creating Opportunities For Improvement In Preparedness And Response Community Capability Assessment.
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
Denise Imbler, Program Administrator Florida Hazardous Materials Planning and Prevention Program
Mark Hyland, Operations Director, Maine Emergency Management Agency.
HunterDouglas VPP TRAINING.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
K Blake Kidd September 30, 2015 Toxics Release Inventory (TRI) Emergency Planning and Community Right-To- Know Act of 1986 (EPCRA) Section Pollution.
Safety and Health Program Don Ebert- Risk Manager (509)
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
TIER 2 REPORTING Bernardine Zimmerman TIER 2 CHEMICAL REPORTING PROGRAM or
Emergency Planning and Community Right-to-Know Act Regulatory Overview Course.
Emergency Planning and Community Right-to-know Reporting Kathleen LeGreid - Environmental Protection Agency EPA EPCRA (Emergency Planning Community Right-to-know.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.
Tier II Chemical Reporting Ann Adams Critical Infrastructure Division Texas Commission on Environmental Quality Trade Fair 2016.
CO Chemical Safety Workshops for Regulated Facilities
Emergency Planning 101 A Regulatory Review & Tips for Getting Started
McMullen County Local Emergency Planning Committee
The Emergency Planning & Community Right-To-Know Act
Chemical Facility Anti-terrorism Standards
Emergency Planning and Community Right-to-Know Act (EPCRA)
Process Safety Management
Presentation transcript:

GW Lupton, Management Analyst Risk Management Planning Unit State Emergency Response Commission Risk Management Plan: Protecting the Community Florida Division of Emergency Management Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act

Risk Management Program Overview Purpose of Section 112(r) and the Risk Management Program Requirements Facilities Typically Regulated Under Risk Management Program Risk Management Program Elements Program Level Screening What we do different Division’s Inspection Selection Criteria and Process Inspection Process and typical findings and Enforcement

Federal Actions - Background Information 1984 Releases of methyl isocyanate kills more than 2,000 people in Bhopal, India As part of its Air Toxics Strategy, EPA initiates the Chemical Emergency Preparedness Program (CEPPO).

Federal Actions - Background Information (cont’d) 1986 Emergency Planning & Community -Right-To-Know Act (EPCRA), Superfund Amendments and Reauthorization Act of 1986 Aka SARA/Title III States must establish State Emergency Response Commissions (SERCs) and Local Emergency Planning Committees (LEPCs) Covered facilities must provide site information to SERCs, LEPCs and local fire departments for emergency planning and public. Development of the Toxic Release Inventory (TRI) to characterize pollutants emitted from covered facilities. Emergency notification requirements for accidental releases of certain hazardous substances.

Federal Actions - Background Information (cont’d) The resulting regulations that EPA adopted in accordance with Section 112(r) are the Chemical Accident Prevention Provisions (CAPP) found in 40 Code of Federal Regulations, Part 68. CAPP lists the regulated substances and their thresholds. The CAPP is commonly referred to as the Risk Management Program

Purpose of Section 112(r) and the Risk Management Program Requirements To reduce & prevent accidental chemical releases. To reduce the severity & minimize the consequences of chemical releases. To improve coordination & communication between regulated facilities & local emergency preparedness & response agencies to improve emergency response.

Facilities Typically Regulated Under RMP Drinking water treatment plants Wastewater treatment plants Food and cold storage facilities Ammonia retailers Chlorine repackaging and distributors Chemical manufacturers Utilities Petrochemical facilities Pulp mills Fertilizer producers Swimming pool service/supply businesses Military, energy installations (mostly federal facilities)

Overview of Risk Management Program Requirements If facilities use, store, manufacture, or process substances on the Section 112(r) list above Threshold Quantity (TQ), must develop and implement a Risk Management Program. Section 112(r) Listed Chemicals - 77 Toxic Substances & 63 Flammable Substances. Most Common Risk Management Program Chemicals in Florida - Ammonia, Chlorine, Sulfur Dioxide, Hydrochloric Acid, Hydrofluoric Acid, & Nitric Acid. Requirements & Complexity vary based on Program Level of Process.

Program Level Screening for Regulated Processes Regulated processes assigned to one of three program levels, based on:  Potential for off-site consequences  Accident history  OSHA Process Safety Management (PSM)  Within certain Standard Industrial Classification (SIC) Codes identified as having significant accident history. Program Level 1 - no offsite impacts Program Level 2 - streamlined prevention program (7 components) Program Level 3 - full RMP program (12 components)

Submission of Risk Management Plan After developing a facility’s Risk Management Program it must be submitted to the U. S. Environmental Protection Agency through the RMP* E S ubmit The Risk Management Plan, includes information of all the requirements of the Risk Management Plan

Management of Risk Document Risk Document when solution should be implemented by Document when solution was implemented

What Florida Does Different Compile information from the EPA data-base and WEB HMIS to form a “RMP Tracking Data-base”. The single Data-base allows for quick reference. Yearly inspection selection based on; oldest date of last inspected, and never inspected facilities. Tracks Fee scheduling and collection process Identifies High Risk facilities Identifies RMP anniversary dates for Outreach Program

RMP Overdue Outreach Program Starts with RMP Tracking Database Identifies facility anniversary dates two years out Three months prior to anniversary date call facilities Monitor EPA data base (CDX), for overdue facilities, and call facilities monthly for follow-up after due date Changes and RMP Resubmit are both certified, changes do not change overdue status.

Previous and current accident history of facility Failure to Resubmit RMP in a timely manner (over six months) Facility location & proximity to population centers Chemical & quantities of Program-regulated chemicals on-site Compliance with or inspection by allied agency programs High Risk and Results of compliance audits Neutral, random oversight, and never been inspected Other factors deemed necessary to protect public safety & health. Inspection Selection Criteria

Overview of the Division’s RMP Inspection Process Basic “Desk Audit” Focuses on the data contained in EPA data base (also complied with prior to on-site inspection) Prior to On-Site Inspection “Document Audit” this is a review of facility hard copy plan. On-Site Compliance Inspection is a complete look at the facility and the hard copy plan.

On-site inspection activities - Focus on Risk Management Program Plant Tour of facility’s process chemicals & operations. Interview facility representatives. Review of facility operations, procedures, supporting Risk Management Plan documentation, etc. Adequacy & completeness of Risk Management Program documentation. Development & implementation of required Risk Management Program elements. Emergency Response - Coordination with local response agencies. Document findings - “On-Site” Inspection Checklist. RMP Inspection Process (cont...)

Prior to site Inspections: Send Inspection notification letter requesting Risk Management Plan supporting documentation. Request for process hazard analysis, training records, incident investigation reports, emergency response plan, compliance audit reports. Use “Documentation Review / On-Site” Inspection Checklist. Review of supporting documentation. This approach reduces time on-site. Helps determine focus of Inspection visit. Schedule date(s) for on-site Inspection. Send notification of on-site Inspection. RMP Inspection Process (cont...)

General On-Site Inspection Findings: WTPs & WWTPs Ammonia refrigeration Chlorine & Other Chemical Repackagers Inadequate documentation, development, and/or implementation of one or more prevention program components. “Bookshelf” & Generic Programs. Good program, but not implemented. Many facilities complying with technical aspects of program, but documentation incomplete.

Specific On-Site Inspection Findings Hazard Assessments - Not available onsite; Incorrect modeling parameters, no rational for selection of release scenarios Incorrect program level status Program Level 1 - Public receptors were identified within endpoint distances. Program Level 2 - Refrigeration facilities subject to OSHA’s PSM. Most deficiencies to date pertained to: Mechanical Integrity Operating Procedures Training Program PHA

Specific On-Site Inspection Findings: Mechanical Integrity - PM protocols not developed or implemented. Inspection and testing not performed. Minimal record keeping. Operating Procedures - Operating phases, limits not addressed. Mostly emergency shutdown & assignments. Not Certified Training Program - Operator & Maintenance training and tracking incomplete. Documentation of how employees understood training. Process Hazard Analysis - incomplete hazard ID (such as hurricanes, over pressurization, equipment failure, human error, etc.) -no follow-up on action items

Specific On-Site Inspection Findings: Management of Change & Pre-Startup Safety reviews and Employee Participation not performed. Contractor Safety Program - Non-existent. Not implemented Compliance audit has not been completed or action items have not been implemented Emergency Response Program - Not coordinated with local responders. Procedures for ER equipment use & inspections not documented. Inadequate training.

Risk Management Program Inspection Team - Usually 2 persons Local Emergency Planning Committee Staff Contact invited to accompany team. Inspection agenda & assignments ed prior to visit date. Opening meeting (Inspection purpose/objectives, safety issues) Tour of facility’s regulated chemicals and processes. Review Risk Management Program supporting documentation. Interview facility representatives. Exit briefing (findings, identified deficiencies, recommendations, schedule for inspection report, schedule for corrections, copy of inspection checklist). What to Expect During an On-Site Inspection?

Granted a thirty day grace period for corrections After 30 days the Division issues Preliminary Determination Report which includes inspection team’s observations, findings, and recommendations. Preliminary Report Identifies deficiencies to be corrected. Preliminary Report identifies revisions to Risk Management Plan Preliminary Report includes a timetable for correcting deficiencies, and or, revising Risk Management Plan. What to Expect After an On-Site Inspection?

What to Expect After an On-Site Audit? (cont...) Facility Response to Inspection Report Usually allow days for corrections and revisions. Written request for extension prior to deadline date, if needed. Upon receipt of corrections and revisions, the Division issues:  Final Determination Report – If corrections are complete.  Interim Inspection Report - If corrections are incomplete.

Role of the Local Emergency Planning Committees (LEPCs) LEPCs support the Emergency Planning and Community Right to Know Act (EPCRA) by using the data collected on Tier II’s to develop hazardous materials emergency plans used for responding to and recovering from releases or spills of hazardous or toxic substances They also conduct Hazard Analysis for facilities within their districts

Questions?

Available Technical Assistance and Resources Contact the Division’s Risk Management Planning Program staff at: (850) (800) (Florida only) Florida’s RMP Program web page for state & federal requirements, audit checklists, step-by-step guidelines. Guidance documents, model RMP plans, other RMP resources also available from EPA