Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan August 2014.

Slides:



Advertisements
Similar presentations
Atyrau Oil and Gas Event
Advertisements

Introduction to ORYX. Agility without Control  Unacceptable rate of error (88%*)  Highly manual, with …  … limited automation potential  Lack of audit.
ATMAN HB summary seminar # Challenges 2 ATMAN project 9/17/2010.
Chapter 1 Business Driven Technology
Prescriptive Process models
Product Configurator for Marketing to Manufacturing design automation.
MIS 2000 Class 20 System Development Process Updated 2014.
Project management Project manager must;
Alternate Software Development Methodologies
© ChevronTexaco 2004 Accelerating the Deployment of Technology to Business Opportunities Kevin Kimber – ChevronTexaco David Matheson - SmartOrg Value-Based.
Software Testing in the Cloud Leah Riungu-Kalliosaari.
Modelling the Aerospace Aftermarket with Multi-agents Systems Ken Woghiren Technical Director - Lost Wax.
XProtect™ Smart Wall Advanced product option
1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.
USING ANALYTICS What to Take Away?
Palletizing the Easy Way
Working With Databases. Questions to Answer about a Database System What functions the marketing database is expected to perform? What is the initial.
Call Center – What Really Makes Sense? Call Center – ce este cu adevarat important?
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
1SlideBusiness Modelling Team, Consultancy UK OR in Shell Lauretta Ciuffardi Strategy & Business Modelling Consultancy UK.
© 2012 Autodesk How to Establish Autodesk® PLM 360 as the Platform for Enabling PLM and Related Processes Prayush Saraswat PLM Business Process Consultant.
Automotive Warranty System 1.  Challenges faced by CIO  Our Solution  Our Methodology  Cloud Based Architecture  Clientele  Highly customizable.
Effective Methods for Software and Systems Integration
© Copyright 2005 Synthosys Synthosys 1 Federal Street L3 Ops Communications Bldg - ACIN Camden, NJ Contact: Linda Yu, President CEO (610)
THNS 2010 Open supervision platforms for smart and sustainable cities, Yves PERREAL, Strategic studies Director, THALES.
The Latest tools for Forecasting & Budgeting Atul Sharma CFO, Tata Communications Banking InfraSolutions CFO Summit, Delhi, 9 December, 2011.
Copyright © IRI, Confidential and proprietary. Expanding Your Training Outlook with E-Learning IRI eSuite See - Act – Win.
© 2014 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
What is Oracle Hyperion Planning  Centralized, web- based Budgeting and Planning application  Combines Operational and Financial measures to improve.
The Eyeblaster ACM Advertising Campaign Management.
The Web-based budgeting and planning solution from FRx Software Photo: DigitalVision Jim Boyer, Sr. Consultant
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Systems Life Cycle A2 Module Heathcote Ch.38.
October, 2000.A Self Organsing NN for Job Scheduling in Distributed Systems I.C. Legrand1 Iosif C. Legrand CALTECH.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
HDM-4 Institutionalization. 2 HDM is for decision-support tool; not decision- making Institutionalization process should ensure that outcome is:  sustainable,
Chapter 11 Managing Application Development. Agenda Application management framework Application management issues Criteria for development approach Development.
"Using Simulation with Scheduling Visualization to evaluate Change Initiatives in a Bio-Pharma Environment”
Marv Adams Chief Information Officer November 29, 2001.
Network design Topic 6 Testing and documentation.
Tools and Techniques for Project Portfolio Management Jon Lewis - Director, Ninth Wave.
Diploma in Procurement & Supply Business needs in Procurement & Supply Session 1 Business Needs and Procurement Decisions.
EPlus. Where Technology Means More.™ Help is on the way! Bob Murphy Business Development Executive Help is on the way! Improving.
Independent, integrated thinking.
Robust Design: The Future of Engineering Analysis in Design
Delivering Differentiation and Competitive Advantage in the New Data Center World Michael Beach Microsoft Global High Tech Summit Thursday October 25,
1 He Says vs. She Says Model Validation and Calibration Kevin Chang HNTB Corporation
1 1 Presenter / date if required Independent, integrated thinking.
New Product Development Page 1 Teddy Concurrent Engineering by Teddy Sjafrizal.
PROGRAM MANAGEMENT MODULE 2 Dr. Nicole Fitzhugh Professional School Counselor Berwyn Heights Elementary.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
If you have a transaction processing system, John Meisenbacher
Using the Destination Scheduler Underground at Olympic Dam Xpac Symposium May 2005 Stuart Mills Long Term Scheduler.
Global Innovation Management VeMBA Business Models.
Diploma in Procurement & Supply
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
Road Investment Decision Framework
AXUG Partner Showcase – Introducing Preactor
BANKING INFORMATION SYSTEMS
The Implementation Experience of CTCS-3 Train Control System and the Implication of “Go Global” of China High-speed Railway Good morning. October 2017.
1st November, 2016 Transport Modelling – Developing a better understanding of Short Lived Events Marcel Pooke – Operational Modelling & Visualisation Manager.
Critical Factors in Managing Technology
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Chute Modelling Capabilities & Future Directions Paul Munzenberger
A test technique is a recipe these tasks that will reveal something
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
OU BATTLECARD: E-Business Suite Courses and Certifications
Presentation transcript:

Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan August 2014

We are: The largest publicly traded independent group of mining technical experts in the world. 18 Office Globally 45+ Years Experience 118 Countries 5000 software installs 14,000 Studies $Billions value added

Solution Offering

We are:. The clear market leader in production simulation, scheduling and costing solutions to resource companies globally Production Simulation Production Scheduling Project Costing & Budgeting Software Solutions BLASTING SOLUTIONS BY DFPCL

Mine Planning Scheduling Horizons BLASTING SOLUTIONS BY DFPCL

Agenda The Story Today Introducing Coal Solutions Case Study Simulation Summary

7 The Story Today

Todays Mining Landscape High demand on local coal Focus on increasing production Land access issues Resources remain static Mining methods constant An interest in innovation

Why Is It Challenging? Resources are getting deeper Resources are complex Demand is increasing Planning considered difficult

Urgent Planning Issues Common urgent issues include: Smaller properties Overlying constraints Open cast and underground mines in same vertical plane Geological disturbances Land and rehabilitation Skilled manpower

Why is Good Planning Currently a Challenge? Complexities such as Multiple seams Fire Water Gas Surface constraints Old mine workings Planning is often done while mining progresses Mines may not be optimised Geological and geotechnical data is complex and sometimes inaccurate

Technology? Software available, but often not used Medium and short term schedules not created to optimise the operation Testing of how the operation works prior to production not possible Software must be easy to use

13 Introducing Coal Solutions

Application of Technology This conference will give you: Many good ideas An awareness of what is new What other mining operations are trying This presentation will help you consider: How to combine new ideas and technologies How things can be improved at your mining operation The benefits effective use of software will bring

We are: The largest publicly traded independent group of mining technical experts in the world. 18 Office Globally 45+ Years Experience 118 Countries 5000 software installs 14,000 Studies $Billions value added

Effective Mine Planning New software concept – Coal Solutions Advanced, robust, interactive scheduling tools Designed to be easy to learn Designed to be easy to use Commodity specific Mining method specific Process driven Intuitive Fast Accurate Understand what your mine is capable of.

Sophistication Without Complexity Integration of all schedule components: Mining Haulage Processing Dump construction Components “aware” of each other with continual, seamless data flow Easy to rapidly incorporate changes to underlying data Scheduling that is interactive - change something, see the impact immediately

More advanced and accurate models Engineers can analyse many scenarios quickly Scenarios run so quickly, scheduling becomes interactive Users will: Retain focus Concentrate longer Absorb and remember changes Understand deeply Engineers will learn what the mine is capable of

Training Fast and Easy Engineers require minimal training time New staff up to speed quickly Learning curve very fast High and fast user effectiveness Skills easily transferred Models quickly understood

Case Study

Case Study – Planning Options This planning exercised considered: Production Resource recovery Tonnes per development metre Principle stress direction Depth Surface constraints Access Spontaneous combustion Gas Ventilation Many more

Option 1 Results of the long term plan: Y20: 4,268,825t 4,630m t/m Based on tonnes per metre, this seems the better result Y1Y2Y3Y4Y5Y6Y7Y8Y9Y10Y11Y12Y13Y14Y15Y16Y17Y18Y19Y20 t 357,481355,2863,252,9893,043,2144,768,9604,674,8545,168,4914,225,4343,920,4444,241,8884,399,2163,660,4643,664,2153,081,9124,709,0764,826,2734,719,8435,214,2774,427,1464,268,825 m 12,70512,50213,38212,51612,3275,6666,5386,2036,4149,30113,12112,71712,39413,39611,8816,4076,4466,2686,8534,630

Option 2 Y20: 5,578,814t 11,549m t/m However, considering all constraints this option is: Safer Has better product quality Geotechnically achievable Less likely to have gas issues Y1Y2Y3Y4Y5Y6Y7Y8Y9Y10Y11Y12Y13Y14Y15Y16Y17Y18Y19Y20 t 348,5991,665,7142,822,2133,524,0133,588,2614,641,3574,290,6874,219,5784,078,6082,040,9811,847,0423,739,5063,766,8013,813,3874,299,8455,307,3934,073,2314,161,5755,565,7755,578,814 m 12,35213,62113,90612,77912,48311,3567,8446,9696,6418,2163,9105,8425,5316,02911,89211,06111,0995,5429,73111,549

24 Simulation

Common Modelling Issues Equipment / fleet Productivity improvements Cycle times Justification of new equipment Delays Mining constraints Congestion Changing variables Changed mine design

Discrete Event Simulation With the dynamic nature of mining, simulation is required True – “discrete event simulation” requires a link to both planning and execution: Evaluate plans and enable scenarios and capital configuration to be tested prior to production Real time data from the operation feeds assumptions in the simulation model. The simulation model is always ‘learning’ from actual production data These learnings are then feed back into the plans – ongoing better planning Plans will continuously be more accurate and achievable. Targets are more likely to be met.

What simulation is possible? HAULSIM is a powerful tool to model, analyse, visualise and optimise your haulage network Accurately model mine haulage Visualise impact of changes Quantify design improvements Validate assumptions Make informed decisions TALPAC is a simulation tool for evaluating the efficiency, productivity and economics of the mine work out the size of fleet which equipment is the most compatible investigate and compare time-period productivity

Rosters MTBF/MTTR Schedule Costing 3D Haulage Network Road Rules Fleet Specifications FMS and GPS Data Real World Data Inputs Accurately Construct, Calibrate, Simulate & Analyse Construct Analyse Simulate Calibrate HAULSIM Workflow

New Mine Layout Problem We are regularly not meeting production goals. Will changing the longwall design help to increase production? Questions Will the change help improve production? How will the change impact the surface fleet? Will the capacity of my conveyor network keep up with the production change? Will there be bottlenecks? The answers to these questions can now be easily found and communicated and the right decisions made by doing a simulation

A 3D simulation solution for analysis of entire mining systems so users can accurately determine and test key system measurers. Improve equipment system efficiency Accurately test safety and/or production gain initiatives Quickly build simulation models and run scenarios Determine whether capital expenditure is required Dynamic dashboard reporting for instantaneous results Integration with RPM applications to simulate an entire mine plan including higher level costings

Summary

RPM’s XPAC Solutions Process driven, rules based schedules Models updated automatically as the mine evolves The best, most sophisticated tool set to build your model, making it fast and easy to get results Solutions have taken away the “good model” vs “bad model” problem. Now, they are all good.

HAULSIM value Visualise ‘what if’ scenarios Test haulage options prior to production Explore multiple scenarios Visualise the impact of changes in minutes Incorporating HAULSIM into your software suite will help you to: Justify new equipment expenditure Reduce 3 rd party consulting expense Use past data to improve future production Operate more efficiently Maximise production

Can you imagine? Now that you know about coal solutions, and also the value of simulation. Imagine if you could combine the two?! Share parameters from the schedule into the simulation Make a change in the schedule, and immediately test the impact it will have Determine if your schedules are realistic Understand how likely your targets are to be achieved

Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan