SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.

Slides:



Advertisements
Similar presentations
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Advertisements

Radiation Tolerant Source Interface Unit for the ALICE Experiment E. Dénes et al. LECC September 2005, Heidelberg.
E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
Beam Position Monitors: Front-End Components - BPM Acquisition Architecture - Components Selection - Irradiation Tests MOPOS Radiation Tests - JL Gonzalez.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Bill W. Haynes Slide 1 February 26, 2002 CKM Precision Timing CKM Workshop In San Luis Potosi, Mexico u Common Design for Multiple Timing Applications.
16 Sep 2008 Versatile Link Status Report F. Vasey on behalf of the project steering board With input from C. Issever J. Troska.
Virtex-6 Radiation Studies & SEU Mitigation Tests
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
OPTO Link using Altera Stratix GX transceiver Jerzy Zieliński PERG group Warsaw.
GBT Interface Card for a Linux Computer Carson Teale 1.
FPGAs in the CMS HCAL electronics Tullio Grassi 21 March 2014.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range ● Summing signals from 6 detectors on one preamp ● NCC should.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range: 14 bit range, 10 bit accuracy ● Summing signals from 6 detectors.
Understanding Data Acquisition System for N- XYTER.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
Apr, 2014 TE-EPC-CCE Radiation Tests
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
Acquisition system for the CLIC Module. Sébastien Vilalte.
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
Versatile Link The Versatile Transceiver Feasibility Demonstration (Project phase II update) Csaba Soos, Jan Troska, Stéphane Détraz, Spyros Papadopoulos,
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
Radiation Tests Discussion 10 Feb 2014 Jason Gilmore TAMU Forward Muon Workshop.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
GBT-FPGA Interface Carson Teale. GBT New radiation tolerant ASIC for bidirectional 4.8 Gb/s optical links to replace current timing, trigger, and control.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
Radiation 4-5 December 2005 AB/BDI/BL.
Standard electronics for CLIC module. Sébastien Vilalte CTC
Mircea Bogdan Chicago, Oct. 09, BIT, 500 MHz ADC Module for the KOTO Experiment The University of Chicago.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Beam Secondary Shower Acquisition System: TWEPP2013 Interesting news
The Jülich Digital Readout System for PANDA Developments
Test Boards Design for LTDB
2007 IEEE Nuclear Science Symposium (NSS)
Next generation rad-hard links
PANDA collaboration meeting FEE session
DOR(OS) integration status and plans Jakub Olexa, Marek Gasior
Irradiation test results for SAMPA MPW1 and plans for MPW2 irradiation tests Sohail Musa Mahmood
New developments and inventory
Ewald Effinger, Bernd Dehning
Status of the MOPOS BI TB – 26th June 2014.
GBT-FPGA Interface Carson Teale.
SPS Beam Position Monitors: Front-End Electronics
Combiner functionalities
Radiation Working Group RADWG
Presentation transcript:

SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013

Outline SPS Multi Orbit POsition System (MOPOS) System overview Front-End Architecture Rad-tol requirements, design and status Possible impact and mitigation Long-term radiation test planning and strategy BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/20132

BA2 BA3 BA4 ECA4 BA5 ECA5 BA6 BA7 BA1 TT40 TT41 (CNGS) TI8 (LHC) TI2 (LHC) TT20 (SPS NA) TT66 (HiRadMat) TT60 TT10 (PS) SPS Multi Orbit POsition System (MOPOS) MOPOS Front-End 216 BPMs in the tunnel Exposed up to 100 Gy/y Optical transmission MOPOS Read-Out In surface buildings (BA1...6) BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/20133

MOPOS: Simplified Block Diagram BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/20134 LogAmps Serial ADC 10MHz Serial ADC 10MHz Pickup U D R L x y FPGA Optical 2.4 Gb/s FPGA Digital Board Read-Out Board Timing Distribution VME Interface SPS Tunnel Front-End CHASSIS Software Radio Frequency Analogue Board

Front-End Architecture BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/20135

Analogue Board Log-Amps AD8302 ADL5519 MAX2016 ADC Drivers ADA THS4521 Voltage regulators LT1963AEQ TL1963-KTT LP3875-ADJ TPS7A4501-KTT BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/20136

PSI Irradiation Facilities (PIF) BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/20137  Energy: 230 MeV  Flux: p/cm 2 s  Fluence: p/cm 2  Current: 4.7 nA  Collimator: 58 mm (Si)  Dose/run: 1 kGy rad/3.5 h

PSI: Analogue Test Setup BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/20138

LogAmp ADL5519 & ADC-Drivers BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/20139

Analogue Components LogAmps AD8302: Analog Devices, Dual Log Amps ADL5519: Analog Devices, Dual Log Detector MAX2016: Maxim, Dual Log Detector ADC Drivers ADA4932: Analog Devices, Differential ADC driver THS4521: Texas Inst., Differential ADC driver These components have been qualified at PSI (TID 1kGy) BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201310

Voltage Regulators BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201311

Analogue Components Low Dropout Regulators LT1963A: Linear Tech., LDO Regulator (1/3 bad) LP3875: National Semi., LDO Regulator (3/3 bad) TL1963A: Texas Inst., LDO Regulator TPS7A4501: Texas Inst., LDO Regulator These components have been qualified at PSI (TID 1kGy) BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201312

Optical Transceivers Test Board Commercial SFP Modules Double-fiber SFP FTTX Technology: FT3A05D Single-fiber, bidirectional Ligent: LTE5350-BC and LTE3550-BC Lightron: WSP24-313LC-I5A and WSP24-513LC-I3A Source Photonics: SPL-35-GB-CDFM and SPL-53-GB-CDFM Yamasaki: L-15B and L-15Y BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201313

PSI Test Setup Energy: 230 MeV; Current: 2nA (~3.5 rad/s) or 3 nA (~6 rad/s) ; Collimator: 58 mm (Si) TID goal: 1 kGy rad/component Measurements every second: Communication rate: 1.25 Gb/s 32-bit word sent from the controller board (FPGA, Spartan6) Electrical loopback on the SFP Board Cross-check between sent and received 32-bit word 2 SFP modules tested in parallel For each channel, 3 counters are enabled: single bit errors, multiple bit errors, total errors BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201314

Measurements – Best SFP Parts BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201315

SFP Test Results Summary Ligent and Yamasaki components are very sensitive to the radiation PIF Source-Photonics components are more resistant but with many error bursts FTTX and Lightron components behave much better but still generate many error bursts  For the MOPOS Front-End: decision to use the Versatile Transceiver (VTRx) developed at CERN TESTS to be done with long transmission fibres (up to 1.5 km) BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201316

CERN VTRx Radiation Specs Versatile Link Technical Specification, rev. 2 [J. Troska et al.] BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/ Tolerance Level Dose and fluence (20 Mev neutron equivalent) Calorimeter 10 kGy 5 x n/cm 2 Tracker 500 kGy 6 x n/cm 2

Short-Term Strategy Current Front-End Digital PCB (vers. 1) Analog Devices Octal 14-bit ADC: AD9252 Xilinx Spartan6 FPGA (Triplication, Hamming Code Correction…) CERN VTRX Optical Transceiver Will allow the first functional tests of the MOPOS system in 2014 (both hardware and software) BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201318

Long-Term Strategy: Radiation Tests for ADC & Digital Parts Beam Tests Conditions: equivalent to PSI Test Beams (230 MeV; TID: 1 kGy) In our section there is no manpower available in 2014 BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201319

Analogue/Digital Converters 40…65Msps – LVDS Serial ADC AD9252: Analog Devices Octal 14-bit AD9259: Analog Devices Quad 14-bit LTM9009: Linear Tech. Octal 14-bit LTC2171: Linear Tech. Quad 14-bit ADS5294: Texas Inst. Octal 14-bit ADS6442: Texas Inst. Quad 14-bit BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201320

ADC Radiation Tests (H. Takai/BNL) BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/ TWEPP2013

Digital Components Low Voltage and LVDS Buffers 74VCX162244: Fairchild 16-bit Buffer/Line Driver 74ALVCH162244: Texas 16-bit Buffer/Line Driver 74VMEH22501: Texas 8-bit Bus Transceiver FIN1108: Fairchild 8-port LVDS Repeater BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201322

Digital Components: FPGA SERDES integrated – SRAM technology Xilinx SPARTAN6 (currently used) Test of the first board prototype: SPS – 2014 Altera Stratix V Cycling Redundancy Check of FPGA configuration Possibility to get the corresponding ASIC External SERDES  FPGA + GBT project SRAM – if failures are mostly related to SERDES Antifuse – Microsemi Axcelerator AX2000 Flash RAM – for SRAM configuration M25P128 – Numonyx BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201323

THANK YOU FOR YOUR ATTENTION! BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201324

Spare Slides: PSI Radiation Tests BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201325

PSI: SFP Radiation Setup BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201326

SFP Tests: FTTX FT3A05D BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201327

SFP Tests: Lightron I3A BI Review on Radiation Development and Testing - J.L. Gonzalez - 22/11/201328