GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Update on GEM Activities for the 12 GeV Program in Hall A at JLab
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
SBS Coll. Meeting - Front Tracker GEM
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
SuperB igbite Spectrometer in Hall A Background: photon ( MHz/cm 2 ) charged ( kHz/cm 2 ) 1 Large luminosity Moderate acceptance Forward.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Single Board Controller Comments Roger Smith Caltech
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
Road to SiD Test beam at LNF (Frascati) BTF 23 – 30 June. MarchAprilMay June July 22 June DEAD LINE June: Assembly of electronics parts over the PCB (APV25.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
A Readout System Utilizing the APV25 ASIC for the Forward GEM Tracker in STAR G. J. Visser 1, J. T. Anderson 2, B. Buck 3, A. S. Kreps 2, T. Ljubicic 4.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
HIE REX / ISOLDE New Instrumentation electronics - Main functionalities - S.Burger BI-PM
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
MPD HW & firmware status UVa Back Tracker parts status SBS JLAB 1 16 December 2015 Paolo Musico and Evaristo Cisbani GEM Readout Update.
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
ATLAS Pre-Production ROD Status SCT Version
Markus Friedl (HEPHY Vienna)
14-BIT Custom ADC Board Rev. B
- PANDA EMC Readout System
HCAL Data Concentrator Production Status
Status of the Front Tracker GEM
Front-end electronic system for large area photomultipliers readout
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector Firmware Update on MPD v 4.0 ◦ Some preliminary tests on VME intrerface Paolo Musico and Evaristo Cisbani 4-5 June 2013 SBS JLAB 1

MPD v 4.0 SBS JLAB June prototypes ready Hardware modifications: Used HDMI-A connectors for analog and digital signals Adopted larger FPGA (+20%) Replaced DDR with DDR2 (128 MB) 110 MHz system clock Removed USB support Moved from Flash to SD-Card Added front panel coax clock All spare signals go to PMC compliant connectors Improved ADC power distribution Added optional termination on ADC inputs

Backplane 5 slots “short” SBS JLAB June 2013 TOP SIDE BOTTOM SIDE External frame used only for assembly: will be removed Dimensions: x 88.5 mm Front-end boards pitch: 51.2 mm 8 boards assembled, to be tested

APV Front-End w Panasonic conn. SBS JLAB June 2013 Dimensions: 80.5 x 49.5 mm  3.5 mm longer to house different connector 25 boards assembled: bonding in progress, ready by next week. Test will follow Used an external company for bonding: Siae Microelettronica in Milan Picture taken after SMD assembly APV25 not yet present External frame will be removed

HDMI Patch Panel boards SBS JLAB June 2013 Two Patch Panel passive boards have been produced Digital: distribute the control signals to 2 independent backplanes (I 2 C is common) Analog: arrange up to 3 x 5 channels into 4 HDMI-A cables Digital Patch Panel in the latest test DESY

RAD HARD LVPS TESTING LHC4913 Rad Hard LVPS have been put on a backplane and powered some front-ends during latest DESY test beam Noise not degraded SBS JLAB June 2013

MPD v 4.0 firmware update Revised memory mapping ◦ Older map was too fragmented and A32 only ◦ New release adopt A24 addressing for configuration and debug and A32 for data readout VME interface state machine rewritten ◦ D64 read only cycles: MBLT, 2eVME, 2eSST ◦ 2eSST simulated peak speed: 148, 222, 296 MB/s TBD ◦ Slave termination ◦ Multiboard block transfer SBS JLAB June 2013

MPD v 4.0 VME interface testing A32D64 cycle tested with STRUCK SIS-3104 ◦ 2eSST not supported ◦ Dedicated implementation: test module with LFSR data generator and system clock = MHz ◦ Average speed measured by software: 100 transfer 4MB each. Data integrity checked for each block. SBS JLAB June 2013 CYCLEDTACK periodPeak SpeedAverage Speed BLT (32 bit)16 ck = 150 ns26.6 MB/s24.3 MB/s MBLT17 ck = 159 ns50.3 MB/s47.8 MB/s 2eVME10+10 ck=93+93 ns86.1 MB/s73.6 MB/s

Next Steps Test 2eSST: ◦ STRUCK has a firmware upgrade: try to use it ◦ use different controller Implement slave termination and multiboard block transfer Start production for front-ends and MPDs Backplanes already assembled, equipped with LHC4913 rad-hard LVPS. SBS JLAB June 2013

Cost Estimation BOARDQuantityUnit Price (€) APV Front End5 (prototypes) APV25 & bonding not included Backplane5 (prototypes) MPD1 (prototype) SBS JLAB June 2013 Estimation based on what we paid Some discount can be negotiated with EES for large quantities VAT, other taxes, customs duties, transportation not included