1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

1 MICE Project Board Schedule and risk discussion Introduction Project Management comment Schedule considerations Adapting the schedule/reacting to circumstances.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Top-Level Project Schedule Step IV Step V Step VI Revision date: 17 th June,
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 APRP Meeting MICE UK work packages Costs and schedules Organisation and monitoring Schedule summaries Cost summaries Andy Nichols, STFC, 15/8/11.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
1 MICE Funding Agency Committee PM report Overview Organisation and project management Schedule reconstruction The Step IV subsystems Andy Nichols, STFC,
1 Schedule Discussion Background & aims Major milestones & drivers Summary of important dates Project risks MICE CM26, 24-27th March, 2010.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
PM report International MICE programme Principal deliverables Schedule summary Schedule considerations and drivers Status of SS, RFCC and EMR, LH2 & LiH.
1 MICE CM28 STEP III or STEP IV? – some practicalities Andy Nichols/Tim Hayler, STFC 4 th October 2010 Considerations Step II Step III Step IV Conclusions.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
1 PM report International & UK programmes Overview Reconstructing the schedule The UK Project Management team Progress with major subsystems Substation.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.
1 MICE MPB/RLSR Integration of Step IV Readiness of the major subsystems Installation sequence and schedule considerations Logistics, staffing and local.
1 MICE CM28 Schedule & Risk Comment Schedule reconstruction and management The ‘straight to Step IV’ discussion How a schedule meeting can work Risks (and.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
MICE Resource-Loaded Schedule Review Integration of MICE at RAL Historical constraints The integration project described Local organisation, safety and.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Resource Loaded Schedule and Budget Profile
Status of the MICE Construction Project
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Controls & Monitoring in MICE
Presentation transcript:

1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail planning for Step IV Conclusion Andy Nichols, STFC, 22/2/12

 MICE SCHEDULE update February 2012 V1 STEP I STEP IV Q and 2013 STEP V STEP VI Run date: EMR run Q Under construction: NB: target date 2016

MICE Top-Level Project Schedule Step IV Step V Revision date: 10 th February 2012 (CM32) Note: items in red text are key schedule drivers Items in orange text are high risk items Items in Green text are complete 3

STEP IV SubsystemDate Spectrometer solenoid #1 + #2Sept’12 Fibre tracker #1 + #2Ready Focus coil #1Apr’12 LH 2 system AMay ‘12 Solid absorber(s)June ‘12 Liquid absorberReady DiffuserAug’12 Virostek plate & TOF cage assy Feb. ‘12 Substation upgradeReady EMR installationMay’12 Radiation shutterJune ‘12 AFC Moving platform #1Ready SS platforms InstallationJune ‘12 Step IV ready...Q1, 2013

STEP VI SubsystemDate Absorber Focus Coil #2Q LH2 system BQ RF AmplifiersQ RF InfrastructureQ Successful test of first CC coilQ RFCC delivery plan complete AFC Moving platform #2Q RFCC Moving platform #1Q Step VI target date Under Construction!!

Main schedule drivers Put very simply, for Step IV it is: Spectrometer solenoid 1 & 2 AFC 1 Liquid hydrogen delivery system EMR These items are all in their final stages of manufacture and are scheduled for this year Other important items are: Diffuser Radiation shutter Solid absorbers Magnetic measurements Again, much of the work is done....

Comment on Steps V & VI As before, we still cannot predict a delivery date of Step V until we have a robust delivery plan for the Coupling magnets But there has been some welcome progress: Cryostat review now fixed for Feb 29 th Coil #1 cold test preparations are well advanced Good feedback from Industry (Meyer Tool) on fabrication Discussions on delivery plan started - CERN large magnet group and DL involved – very early days, hope to follow up after Feb 29 th review We have been asked to submit a major Step V & VI readiness review when Step IV is complete, ie, beginning of 2013 It will have to contain the above, and much more.... A major opportunity for the project

Keeping us on schedule This year luckily we are focussed by the deliveries of large items, we have to Understand the detailed integration very closely Not ignore services and pipework Or general moving things about, eg, dewars and transfer lines First planning workshop held on 3 rd Feb, more planned this year; relevant people need to attend in person – no phone link envisaged Weekly Hall meetings need emphasising – attendance has always been good though Equally important are people: Each subsystem must nominate the person(s) who will support it during both installation and running

9 Re-organised MICO meetings working well Six top level milestones for each important deliverable tracked weekly Many thanks to Gail Hanson for making it all work

Planning the Step IV detail schedule Too much detail for a ten minute presentation... Alan Grant has the detailed schedule at: hedules/ Points to note: Step IV complete installation occupies all of 2012 calendar year It’s conveniently split into two halves by the EMR run in May/June: Before EMR Run: Floor building A/C rework LH2 testing AFC #1 acceptance and integration in R9 After EMR Run Tracker integration Spectrometer solenoid installation Diffuser and rad.shutter AFC installation It’s a highly sequential operation!

Key dates FC #1 arrival: mid-late April (two week delay due to OVC machining) Magnet mapping in R9: May Moving floors complete and tested: May Helium test complete in MICE Hall: mid-March Hydrogen test complete: 15 th May Arrival of EMR: 15 th May EMR commissioning run complete: 15 th June Arrival of SS #1: mid June Arrival of SS#2: September Overall magnet installation period: mid June – Jan, 2013 This includes: Magnet mapping Diffuser & rad shield installation Tracker integration

Making it work..... Each event has to take place in its allotted ‘window’ for this to work But we have to retain some flexibility for unforseen variables Weekly detail planning is done strictly at the Wednesday Hall meetings and MICO meetings It only works if the relevant experts attend Three more detail planning workshops will be held this year Important open questions: Magnetic field tolerance of equipment – magnet working grp. Asbestos removal from R9 – BPG Do we really have the space to insert the trackers in situ? MICE needs to generate a list of subsystem experts prepared to travel!

Conclusion This summary is normally quite difficult to deliver But this time I feel more relaxed, because: Realistic planning has paid off Schedule float has been added Delivery expectations are sensible Manpower has been reinforced in critical areas (although we still need more) So thanks everybody!