ONE INDUSTRY – ONE STANDARD Panel Discussion Transition to ANS/ANSI-3.5 2009 Standard.

Slides:



Advertisements
Similar presentations
Where are you?. Getting Started with GoToWebinar National Technology Assistance Project
Advertisements

1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Cumulative Impacts James Slider November 7, 2013.
1 10 CFR Part 26 Subpart I Managing Fatigue Kamishan Martin Human Factors Engineering June 23, 2010 HPRCT conference.
Effective Project Management: Traditional, Agile, Extreme
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Effective Workplace Safety Inspections OFFICE OF RISK MANAGEMENT LOSS PREVENTION UNIT.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Unit 9: Continuity and Human Capital Unit Introduction and Overview Unit objectives:  Define human capital  Identify and discuss human capital considerations.
TBA Compliance Training Long Beach City College Developed & Presented by Bob Rapoza LBCCD Internal Audit Manager TBA Compliance Training Long Beach City.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Professional Development Programs
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
EHS Management System Elements
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
1 of 39 DQO Implementation Process: Flow Chart and Wall Charts 30 minutes DQO Training Course Day 2 Module 8 Presenter: Sebastian Tindall.
Staff Structure Support HCCA Special Interest Group New Regulations: A Strategy for Implementation Sharon Schmid Vice President, Compliance and.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
Topic (1)Software Engineering (601321)1 Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
CRM Prep Workshop Part 4 Records Appraisal, Retention, Protection and Disposition.
1-2 Training of Process Facilitators 3-1. Training of Process Facilitators 1- Provide an overview of the role and skills of a Communities That Care Process.
Roles and Responsibilities of School Principals. What is Management? Management is getting the work Done through others. It has to do with planning, directing,
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
Simulator Testing Using New Automated Tools from GSE Robert Soderholm – Surry / Dominion Michael Fendley – GSE, Director of Operations.
STUDENT FACULTY / ITP COMMITTEE SENATE START 2. Look for company for ITP placement END 1. Generate the list of eligible students for ITP and conduct briefing.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
Curriculum Efficiency: From Idea to Approval Rich Cameron, Cerritos College, Facilitator Julie Bruno, Vice President, ASCCC, Sierra College Grant Goold,
IIPP An Overview of the Injury and Illness Prevention Program.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
EMS Seminar #4 – Disaster Preparedness Joseph Ip BSc (Hon), MSc, MD VGH Emergency May 28, 2002.
Pilot Component Design Basis Inspection (CDBI) and Equipment Qualification (EQ) Program Inspection Feedback CONFIGURATION MANAGEMENT BENCHMARKING GROUP.
Standard Design Process Overview
SPECIAL EDUCATION PROCEDURES TO ADDRESS NON-COMPLIANT FINDINGS RELATED TO CHILD FIND Presenter Jim Kubaiko, Director Special Education.
Developing Local and Regional Incident Management Teams Bob Koenig Incident Management Team Coordinator Texas Forest Service.
DEVELOPING POLICIES & PROCEDURES Presented by Lynn L. Buchanan President Buchanan & Associates Consulting For Alaska Association Medical Staff Services.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
ACA International’s PPMS
Project Cost Management
Site Governance Team Basics
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Standards and Certification Training
NRC Cyber Security Regulatory Overview
HIGH LEVEL SAFETY CONFERENCE Montreal 30 March 2010
Specification on float equipment
Regulatory Oversight of HOF in Finland
Toledo-Lucas County PODS Mass Dispensing Exercise
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
DOE and NRC Regulated CM - A Comparison
TRTR Briefing September 2013
Recruitment & Selection Process For Talent Acquisition
EMS Development Course for Government Agencies
Effective Project Management: Traditional, Agile, Extreme
DEPLOYING SECURITY CONFIGURATION
Break Out 1: CM of Digital Equipment
Instructional Standards & Procedures Committee Update
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Most common fire charter violations
Presentation transcript:

ONE INDUSTRY – ONE STANDARD Panel Discussion Transition to ANS/ANSI Standard

Panel Members Tim Vriezema - American Electric Power – DC Cook - First simulator to 2009 Standard - Was on 1985 Standard Jim Florence - Nebraska Public Power District – Cooper - Currently on 1985 Standard - ANS/ANSI-3.5 Working Group Tim Vriezema - American Electric Power – DC Cook - First simulator to 2009 Standard - Was on 1985 Standard Jim Florence - Nebraska Public Power District – Cooper - Currently on 1985 Standard - ANS/ANSI-3.5 Working Group

Panel Members Bob Soderholm - Dominion - Surry - Dominion currently has 5 Units on 1998 Standard - Fleet Approach Gregg Ludlam - Exelon - Exelon currently has 8 Units on 1985 Standard - Exelon currently has 1 Unit on 1993 Standard - Exelon currently has 1 Units on 1998 Standard - NEI LOFG Chair Bob Soderholm - Dominion - Surry - Dominion currently has 5 Units on 1998 Standard - Fleet Approach Gregg Ludlam - Exelon - Exelon currently has 8 Units on 1985 Standard - Exelon currently has 1 Unit on 1993 Standard - Exelon currently has 1 Units on 1998 Standard - NEI LOFG Chair

Moving to ANSI/ANS Conduct review of your existing standard to 2009 for deltas Ensure malfunction testing documentation saved Evaluate Tech Spec and/or USFAR commitments Revise fidelity/configuration management procedures – Use NEI R1 as basis for SBT Determine best time to implement Train Ops Instructors, Simulator Staff, Management Practice SBT Implement through letter to NRC Region OL Branch Chief Conduct review of your existing standard to 2009 for deltas Ensure malfunction testing documentation saved Evaluate Tech Spec and/or USFAR commitments Revise fidelity/configuration management procedures – Use NEI R1 as basis for SBT Determine best time to implement Train Ops Instructors, Simulator Staff, Management Practice SBT Implement through letter to NRC Region OL Branch Chief

Moving to ANSI/ANS Delta Examples to Consider Test Parameters & 2009 Steady State test has Charging and Letdown flow but 1985 did not require SBT not required / 1998 – Check List / 2009 – NEI R1 standard Post Event Simulator Test & 1998 not required / 2009 should be conducted for certain plant events Test Parameters & 2009 Steady State test has Charging and Letdown flow but 1985 did not require SBT not required / 1998 – Check List / 2009 – NEI R1 standard Post Event Simulator Test & 1998 not required / 2009 should be conducted for certain plant events

Moving to ANSI/ANS Delta Examples to Consider Operability Testing ( ) - Shall be conducted once per reference unit fuel cycle. (Was once per year requirement) Simulator Core Performance Testing - More detailed requirements Steady State Test - No longer require one hour simulator stability run - Comparison done at three distinct power levels spanning at least 50% of operating range Operability Testing ( ) - Shall be conducted once per reference unit fuel cycle. (Was once per year requirement) Simulator Core Performance Testing - More detailed requirements Steady State Test - No longer require one hour simulator stability run - Comparison done at three distinct power levels spanning at least 50% of operating range

Moving to ANSI/ANS Data Collection Don’t underestimate the Data Collection and it’s complexity! - Defining data collection parameters. Resolution What points What alarm files - Maintaining data collected within secure environment (exam related information) - Backing up the data, storage location and media. - Erasing historical data from unsecure locations. Don’t underestimate the Data Collection and it’s complexity! - Defining data collection parameters. Resolution What points What alarm files - Maintaining data collected within secure environment (exam related information) - Backing up the data, storage location and media. - Erasing historical data from unsecure locations.

Fleet Considerations How are Fleet Procedures affected by New Standard When are the IP inspections scheduled for each site Are there any concerns related to major simulator modification (Outage / Design Changes) Assign simulator lead from each site to the project How are Fleet Procedures affected by New Standard When are the IP inspections scheduled for each site Are there any concerns related to major simulator modification (Outage / Design Changes) Assign simulator lead from each site to the project

QUESTIONS ?????