750 kV Rivne-Kyiv High Voltage Line Construction Project with attraction of loan proceeds from European Bank for Reconstruction and Development and European.

Slides:



Advertisements
Similar presentations
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Advertisements

Baltic Energy Strategy Einari Kisel Director of Energy Department.
Prior activities of FEWE Under the bilateral and multilateral co-operation, several projects to support the rational energy use in different sectors.
Electrical Engineering Department, Amirkabir University of Technology, Tehran, Iran M. Poursistani N. Hajilu G. B. Gharehpetian M. Shafiei CHP Systems.
Donors’ Conference on Sustainable Energy for Kosovo
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Previous Efforts in the Electricity Sector to Improve Energy Efficiency On Supply Side  Maximum use of natural gas.  Increase of generation efficiency.
FOREST FUEL - RENEWABLE ENERGY. Renewable energy Today, renewable energy is an important part of the Swedish energy budget. With its share in the energy.
Maximizing production efficiency for existing and new power infrastructure: Enel experience in Russia and technologies Enrico Viale Chief Executive Officer,
Sustainable energy supply in Germany – scenario analysis with different CO 2 certificate prices Markus Blesl, Uwe Remme, Ulrich Fahl International.
SGM P.R. Shukla. Second Generation Model Top-Down Economic Models  Project baseline carbon emissions over time for a country or group of countries 
AETS/March 2006 Dominica Geothermal Project and Interconnection with Neighbouring Islands Assessment and Cost-Benefit Analysis March 2006 A E T S Application.
30/10/2006 MARKET BASED MECHANISMS TO FIGHT CLIMATE CHANGE Jean-François Conil-Lacoste Chief Executive Officer, Powernext SA APEX Conference October 30,
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Euroheat & Power Why is there not more combined heat and power?
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
1 THE RATE CASE PROCESS A Blend of Science and Superstition Presentation to the Mongolian Energy Regulatory Board By Burl Haar Executive Secretary Minnesota.
1V Int. Scientific and Practical Workshop "Ashes from TPPS", April 24/25, 2014, Moscow, Russia Forecast in Power Production and Impact on CCPs in Europe.
Economy and calculations If 4 million households are provided with smart power cells, the total price of generators, all equipment and software will be.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Energy Efficiency Opportunities (EEO) Program 2nd International Conference on the Global impact of Energy Management Systems: ‘Creating the right environment.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
BEARS LOGISTIC CENTER Kyiv 2007 Project «Building of network of specialized logistic centers for agricultural products storage»
[Legislative] [Danish Policy] Energy 2000, Target to reduce CO2 emissions in 2005 by 20% compared to 1988 levels. Energy 21, Reinforce targets.
1 Best Practices for Program Implementation: Lessons from the Geothermal Heat Pump Experience Harvesting Clean Energy Conference.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
ENERGY POLICY DEVELOPMENTS EE & RE OPPORTUNITIES U.S. Business Mission 2010 June 15 – 17, 2010 Chisinau, Republic of Moldova.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
1. General characteristics of the changes 2. Legal and macro-economic aspects of changes; procedural issues 3. Changes in the “incomes” section of the.
Low carbon scenarios for the UK Energy White Paper Peter G Taylor Presented at “Energy, greenhouse gas emissions and climate change scenarios” June.
Updates on the RFE Energy Sector and the RFE LEAP model, and Implications of a Regional Alternative Path for the Russian Far East Victor Kalashnikov Economic.
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
R. A. Zakhidov Application of Kyoto mechanisms in attraction of carbon investments for implementation of projects on thermal utilization of solar energy.
EU Environmental Standards: What can Ukraine expect? Ihor BOHATYRIOV Project manager, “A strategy for Ukraine’s integration into the European Energy Community”
Anni Podimata MEP Member, Committee on Industry, Research and Energy 8th Inter-Parliamentary Meeting on Renewable Energy and Energy Efficiency Budapest,
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
Current situation concerning national inventory system in Ukraine 1. Previous national inventories Up to date 3 national inventories were prepared and.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
IFIEC Europe International Federation of Industrial Energy Consumers 1 Promotion of Renewable Energies in the EU Member States Consequences on the Price.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Energy Efficiency Potential in the Wisconsin Industrial Sector A Discussion With the Wisconsin Industrial Energy Group November 6, 2008.
January 20, 2006Rod Janssen EC Green Paper on Energy Efficiency Rod Janssen Energy Consultant.
Ministry of Russian Federation of Atomic Energy *** Mining and Chemical Combine Creation of Heat and Power Replacing Source Director General for STC MCC.
CAFE Baseline dissemination workshop 27/09/2004 Dr. Leonidas Mantzos E3M-LAB/ICCS NTUA contact: Energy projections as input to the.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
TPP Stanari “First ‘new generation’ TPP in SEE”. Location: about 70 km east of Banja Luka and 25 km west of Doboj.
SCALING UP RENEWABLE ENERGY Photo: Sarah Fretwell/USAID.
INTRODUCTION OF THE SYSTEM OF ACCOUNTS AND SUB-ACCOUNTS ENERGY COMPANIES Mr. Armen Arshakyan Head of the Tariff Policy Department Public Services Regulatory.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
1 European Investment Bank EIB's support for Energy Efficiency & Renewable Energy Investment in cities and regions - European Local Energy Assistance (ELENA)
Potential of Uzbekistan’s energy system and proposals for cooperation development with Korean companies STATE JOINT STOCK COMPANY «UZBEKENERGO» uzenergy.uzpak.uz.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Charging Station for Electric cars with DC power
World Energy and Environmental Outlook to 2030
RENEWABLES AND RELIABILITY
“Electricity Supply Reliability Project - Additional Financing”
EU’s CO2 Emissions Trading Scheme – Benchmarks for Free Allocation from 2013 Onwards 9 September 2010 Hans Bergman DG Climate Action European Commission.
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
MINISTRY OF ECOLOGY AND NATURAL RESOURCES OF UKRAINE
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Energy sector activities and Plans in the DPRK
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
Construction of Balkhashskaya TPS
Electricity Transmission Network Improvement Project Grant for preparation
Presentation transcript:

750 kV Rivne-Kyiv High Voltage Line Construction Project with attraction of loan proceeds from European Bank for Reconstruction and Development and European Investment Bank

Situation in project field Principal objectives, results and products of the project Financing terms Cooperation in the frame of Kyoto Protocol Project investment return

Situation in project field  In 2004 two 1000 MW nuclear plant power units were put into operation on the Rivnenska NPS (increase of installed capacity to 2800 MW) and Khmelnytska NPS (increase of installed capacity to 2000 MW).  The stations are located in Western region of Ukraine which is superfluous in capacity balance. Commissioning of two new power units resulted in concentration of more than 5000 MW of generating capacities in this region. Upon that the surplus capacity of Western region is MW (in winter in-peak conditions) and (in summer operation loads).  In connection with decommissioning of Chornobylska NPS the Central power system became scarce both in power and capacity. Holdback in construction of block #3 of Kyivska HPS-6 and significant annual consumption growth in Central PS precondition larger capacity deficit in the region. Apart from commissioning of generating capacities and with the purpose of coverage of growing deficit in the Central PS the Ukrainian IPS – Kyiv intersection requires significant strengthening.  By the Decree of the President of Ukraine of # 1863/2005 «About decision of National Security and Defense Council of January 9, 2005 «About energy security of Ukraine and principal factors of state policy in the sphere of its provision» the list of measures regarding the provision of energy security of Ukraine were specified and among them is the construction of sub-station Kyivska and 750 kV over-head high-voltage line Rivnenska nuclear power station – sub-station Kyivska.

Principal objectives of the project are:  maximum utilization of installed capacities of Rivnenska and Khmelnytska nuclear power stations of the Integrated Power System of Ukraine;  higher constancy of power supply to the Central part of the IPS of Ukraine, including Kyiv generation center;  relocation of 750 kV network from contaminated zone of Chornobylska NPS. Main results of 750 kV Rivne-Kyiv High Voltage Line Construction Project include:  Increase of carrying capacity of IPS electricity networks in the West – Vinnytsya intersection with corresponding increase of utilization of NPS in the balance of IPS;  Higher power supply reliability in the Central part of Ukrainian IPS;  Reduction of number of electricity networks located in contaminated Chornobyl zone by reconnection of 750 kV OHL Khmelnytska NPS – Chornobylska NPS to newly constructed SS Kyivska. Main products of 750 kV Rivne-Kyiv High Voltage Line Construction Project are:  Higher specific weight of power generated by NPS: project execution will enable significant increase of generation by Khmelnytska and Rivnenska NPS which is positive both for NPC Ukrenergo and Ukraine, since more expensive power generated by HPS (gas and coal) is displaced by nuclear power. Availability of additional 1000 MW will result in appreciable savings in amount of EUR 42 M. in 2010 in prices of Taking into account annual power demand increase in Kyiv region in range of %, the utilization of additional 1000 MW will cover the demand increase up to 2019, i.e. during 10 years. Principal objectives, results and products of the project

 Lower demand of gas and coal. In addition to economic products project execution and higher utilization of NPS capacity reduces the demand of power industry in coal and gas by tones of fuel equivalent annually. This will guarantee the stability of supply on account of lesser volumes of natural gas import and coal utilization which is featured by low energy conversion efficiency and high pollution level.  Pollutant reduction: Generation of additional 1000 MW by NPS in lieu of HPS will drastically reduce the pollution of environment by power sector. Such reduction meets the EU Directives and is positive for Ukraine. Evaluative reduction amount of hazardous gases emission (SOx, NOx, CH4, CO2) constitutes tones a year, which equals to EUR 270 M. savings during 10 years.  Lower costs of energy losses in network: The construction of new high-voltage line will result in redistribution of electric power in the system. Analysis of load division carried out by Ukrenergo’s specialists displays the capability of 23 MW loss saving during on-peak operation in In 2010 the savings will amount EUR 0.27 M. while total savings will total EUR 2.43 M.  System stability and reliability: According to Technical evaluation of the Project, the construction of new high- voltage line will contribute to higher system-wide stability and reliability both in Kyiv region and other regions of Ukrainian IPS, which is the source of power redistribution and higher general carrying capacity of the system.  Long-term demand: The Project provides for the coverage of constantly growing demand in power in Kiyv and Central region.  Shut-down of SS Chornobylska: The execution of project is an important step in the shut-down process of SS Chornobylska which is located in the extra-contaminated region. Supplementary measures must be taken in order to assure the shut-down of sub-station. Principal objectives, results and products of the project(2)

Financing terms The total Project cost which includes the construction of 353 km long 750 kV OHL Rivnenska NPS – Kyivska, construction of 135 km long diversion of 750 kV OHL Khmelnytska NPS – Chornobylska NPS to SS Kyivska, extension of SS Kyivska by installation of AT-2 750/330 kV and construction of two 330 kV 60 km long diversions to SS Kyivska aimed on higher stability of power supply to central regions of Ukraine totals EUR 364 M. EBRD and EIB loan – EUR 300 M; NPC Ukrenergo’s own funds – EUR 64 M. Borrower – Ukraine, Borrower’s agent – Ministry of finance, beneficiary – NPC Ukrenergo. Commencement of loan proceeds extension – 2008р.; Tenor of a loan – 15 years, grace period – 3 years.; Terms of EBRD loan: EBRD interest rate – LIBOR (Euro) + 1%; Front-end Commission – 1 %; Commitment charge – 0,5 %. Interest rate of Government of Ukraine subloan (Ministry of finance) – 2%. Terms of EIB loan : EIB interest rate – LIBOR (Euro) + 0,55%; Front-end Commission – 0,25 %; Commitment fee – 0,1 %. Interest rate of Government of Ukraine subloan (Ministry of finance) – 2%.

Economic calculations demonstrate that OHL pay-off for NPC Ukrenergo can be reached only due to deduction of task-oriented component for the implementation of Project from electric power tariff or due to the purposeful extra charge to NPC Ukrenergo tariff. In calculations the value of such extra charge for the loan return period was not indexed and evened between 0.3 to 0.7 kop/kWh; for the period after the return of loan – calculated upon condition of receiving of balance profit (coverage of spread between growth of expenses and incomes from distribution under principal tariff) with 10% efficiency to prime cost. Project investment return Investments Change (+/-) of annual net profit for NPC Ukrenergo Total income increase in calculation prices with OHL Rivnenska AES – Kyivska Change of net present money flows (accrued method) Key effectiveness indicators of investment in the Project for NPC Ukrenergo

Cooperation in the frame of Kyoto Protocol  Ukraine is the party of Kyoto Protocol of the United Nations Framework Convention on Climate Change in accordance with which has the right for national quota of greenhouse gasses emission.  Nearly 75% of greenhouse gasses emissions in Ukraine are caused by power sector. During 1990-s the emission level has decreased as the result of economic recession and this led to significant surplus of emission quotas. Such surplus can be delivered to other parties of Kyoto Protocol. Such opportunity is a significant investment potential and can become a considerable source of Ukrainian budgetary recharge. Owing to execution of 750 kV Rivne-Kyiv High Voltage Line Construction Project eventuates the capacity of utilization of additional 1000 MW generated by NPS in lieu of HPS. Such capacity gain will result in reduction of pollutant emissions arising from power generation. The reduction of pollutant emissions has notable economic benefits for whole Power sector of Ukraine and meets the EU Directives. The major emission types are SOx, NOx, CH4 та CO2. Each fuel type has its own characteristics and emission level which can be expressed in g/kWh, or in tones of used fuel. The total volume of replaced power makes up MWh and gives opportunity of savings in the amount of tones of fuel equivalent not utilized by HPS. The volume of pollutant emission reduction is tones a year.  Based on the level of international prices of pollutants from above-mentioned fuel types the approximate amount of annual savings from emission reduction is USD M.