CSC Endcap Muon Port Card Status Mikhail Matveev Rice University.

Slides:



Advertisements
Similar presentations
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
12th Workshop on Electronics for LHC and Future Experiments Valencia Sept F. Loddo I.N.F.N. Bari An RPC-Based Technical Trigger for the CMS.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
The CCB, TTC and so forth Paul Padley, Mike Matveev.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
DAQMB Status – Onward to Production! S. Durkin, J. Gu, B. Bylsma, J. Gilmore,T.Y. Ling DAQ Motherboard (DMB) Initiates FE digitization and readout Receives.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
Radiation Tests Discussion 10 Feb 2014 Jason Gilmore TAMU Forward Muon Workshop.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
The CMS Modular Track Finder (MTF7) Trigger Board D. Acosta, G. Brown, A. Carnes, M. Carver, D. Curry, G.P. Di Giovanni, I. Furic, A. Kropivnitskaya, A.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
OTMB Development and Upgrade Plan for LS2
Irradiation Tests at UC Davis on May 5, 2017 M. Matveev, W
CSC Hardware Upgrade Status
DAQ and TTC Integration For MicroTCA in CMS
University of Wisconsin
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
CCB to OH Tests at Rice M.Matveev Rice University May 12, 2016.
CMS EMU TRIGGER ELECTRONICS
Jan Królikowski Warsaw University
University of California Los Angeles
A microTCA Based DAQ System for the CMS GEM Upgrade
Irradiation Test of the Spartan-6 Muon Port Card Mezzanine
Regional Cal. Trigger Milestone: Major Production Complete
CSC Trigger Update Specific issues:
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
Effect of an ALCT SEU Much-overlooked good stuff
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
University of California Los Angeles
Sector Processor Status Report
FED Design and EMU-to-DAQ Test
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

CSC Endcap Muon Port Card Status Mikhail Matveev Rice University

MPC Upgrade Goals ■ Be able to deliver up to 18 trigger primitives from the EMU peripheral crate to the upgraded Sector Processor ■ Preserve sorting capabilities of the Muon Port Card ■ Preserve 3 old 1.6Gbps optical links to the existing CSCTF 2CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Muon Port Card Status 3 ■ Received 90 optical pigtails from CERN in November ■ Fabricated 81 new front panels (we have 81 baseboards) ■ All 84 pluggable optical transmitters from Avago have been received (delayed by 1-2 months) ■ 85 assembled Spartan-6 mezzanines arrived from Pactron on Jan 6 3 ■ 85 optical transmitter boards have been fabricated and assembled in October. Based on Avago AFBR-810 transmitter CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

MPC Production Mezzanines 4CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Muon Port Card Testing Step 1 5 ■ Program two XCF32P PROMs via Xilinx JTAG cable ■ Check QPLL, clocks and other critical test points with a scope ■ Run basic VME write/read test CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Muon Port Card Testing Step 2 6 ■ Run “9 TMBs - to - MPC” data transmission test in the fully loaded EMU peripheral crate. Verify “safe window” of data latching. This test allows to check most of the FPGA inputs and outputs. CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Muon Port Card Testing Step 3 7 ■ Run optical data transmission tests of three old” and 8 “new” links (PRBS and random patterns, verification under VME control) TTCvi+TTCvx Optical DMB (receivers for the new links) Two OPTO160 boards (receivers for the old links) CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Progress and Issues Discovered 8 ■ Quality of PCB assembly is very good ■ 2 out of 84 Avago 12-channel optical transmitters had problems ■ 1 out of 85 QPLL3 was replaced ■ 42 out of 85 custom MHz crystals have been replaced (symptoms: QPLL doesn’t produce 40M/80M/160M clocks or/and doesn’t lock). All replacements work well. Seen similar problem with the UCSB ODMB ver.3 boards (3 out of 10 crystals were replaced). Response from Pactron: This part used on Rice and UCSB projects are very low MSL (Moisture Sensitivity Level) parts which are sturdy. We re-visited the thermal profile that was used to build these boards and they look very nominal. The part is a RoHS compliance part which can withstand 260°C peak max reflow temperature – our reflow peak temperature was about 235°C (reflow profile attached). Since we are seeing this failure across 2 projects and the parts came from the same source – it would be good to send the failed devices to the factory for failure analysis. CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

QPLL Locking Range 9CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Optical Tests US CMS Endcap Muon Meeting, TAMU 30 September - 1 October ■ New optical data transmission format ■ Bit Error Rates

Firmware ■ Xilinx ISE 13.4 development system ■ ~40 minutes to implement the project ■ Present design occupies ~25% of the Spartan-6 resources, all 8 existing GTP links are used ■ Specification is available at ■ 2 XCF32P PROMs (direct access via JTAG); Master SelectMAP mode (clock provided by the FPGA) ■ It takes ~17 minutes to program mezzanine PROMs via the VME bus ■ FPGA reload from PROMs (dead time): milliseconds (FPGA internal 26MHz oscillator) milliseconds (external 40MHz oscillator on the mezzanine card) 11CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Optical Cables for P.5 ● Trunk cable with 4 connectorized cords (similar to one proposed for the DT upgrade). Each cord has 12 fibers. Need 36 cables for 60 peripheral crates, one spare cord per crate. All details in the Technical Note CERN EDMS No , Reference ELG-OPTFIB-EN-0007 ● Purchase order ($81.3K CHF) has been placed through CERN in April All cables ( m long cables and m ones) are at CERN. Installation by a CERN team is being planned. ● Example of the proposed labeling: CSC/MPC+/1/2-3/S1D05/X5U41 (YE+, Sector 1, Station ME2 and ME3, start rack S1D05 end rack X5U41) 12CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Plans 13 ■ Expect to get a uTCA hardware from UF next week. Purchased a new PC (same Dell PowerEdge R320 as being deployed at CERN). ■ Have 7 baseboards at Rice and received 5 MPCs from CERN (904) on January 31 st. We have 12 upgraded baseboards in total, 8 of them shipped to CERN on February 5. Full link test at this moment is possible only at Rice. ■ Run a slice test with 5 upgraded MPCs at p.5 (verify QPLL locking, old optical links) before full installation. Need to be able to read out the CSCTF. ■ Installation of all mezzanines at p.5 in late spring - early summer ■ Installation of 36 new optical cables in spring CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Backup Slides 14CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Optical Power Budget 15 ■ To calculate the worst-case estimate of power budget (P B ), one needs to subtract the minimum receiver sensitivity (P R ) from the transmitter power (P T ): P B = P T – P R. ■ For the Avago AFBR-810 transmitter the P T = -1.5dB and for the AFBR-820 receiver P R = -11 dB at 10Gbps rate. Our links operate at a lower rate of 3.2Gbps where the estimated P R = -13 dB. Then P B = -1.5dB – (-13dB) = 11.5dB ■ After calculating a link's power budget one can calculate the power margin (P M ), which represents the amount of power available after subtracting attenuation or link loss (LL) from the power budget (P B ). - The average LL values are 0.5dB for connector/splice; - Higher-order loss in MMF of 0.5dB; - Fiber attenuation of 1dB/km. We expect to have one either 2- or 4-way passive splitter along the optical distribution tree. 2-way splitter means 10log(0.5) = -3dB loss and a 4-way splitter means 10log(0.25) = -6dB loss. Assuming 6 connectors/splices in our link and one 4-way splitter we have: P M = P B – LL = 11.5dB – 0.5dB x 6 – 0.5dB – 0.1dB (100 m fiber) – 6dB = 1.9dB A P M greater than zero indicates that the power budget is sufficient to operate the link. CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014

Irradiation Tests (Summary) 16 ■ XCF32P PROM - Irradiated with 1 MeV equivalent fluence at ~10.5 *10 12 n/cm 2 at the TAMU cyclotron in April Equivalent to ~30kRad, or 30 years of LHC exposure in ME1/1 area - Device was read back; not a single bit change, as expected ■ XC6SLX-150T FPGA - Irradiated at the UC Davis 66 MeV proton cyclotron in April Irradiated with 1 kRad at a rate of ~1 Rad/sec (convenient to detect SEU): ● 5 to 15 seconds between SEU ● Average dose to get an error ~13 Rad. With the accumulated fluence of 3*10 11 protons/cm 2, the cross section of SEU is 75 / 3x10 11 = 2.5x10 -9 cm 2 ● Assuming 10-year fluence of ~10 11 neutrons per cm 2 [1] at full LHC design luminosity, the worst case SEU rate would be 2.5x10 -9 cm 2 x neutrons/cm 2 / 5x10 7 sec = 5x10 -6, or 1 SEU in ~ 5.5 hours per device [1] - Irradiated with 100 kRad at a rate 360 Rad/sec ● Many upsets ● FPGA survived the test ■ Avago AFBR-810 optical transmitter - Studied by the SMU group (Dallas TX) in , reports available ● Survived up to 150 kRad ● SEU rate was comparable with the one for SNAP12 devices (being used on ODMB and OTMB boards) CMS Endcap Muon Trigger Upgrade Meeting, TAMU 9 February 2014