Configuration Management During Shutdown Picture of the Week Collider-Accelerator Department 6-26-12 Take 5 for Safety.

Slides:



Advertisements
Similar presentations
Energy Conservation Mike Klun Cargill. Getting Started (Planning) Why do I want to do this? – Cost reduction or environmental impact Will I be successful?
Advertisements

EMS Checklist (ISO model)
[Organisation’s Title] Environmental Management System
Environmental Management System (EMS)
Credited Controls at C-AD Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Ray Karol 3/4/2014. Yellow Ladder Use Ladders categorized as “Yellow” have minor safety issues and may be used by trained and authorized staff by satisfying.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
BRC Storage & Distribution Safety and Quality Management System Training Guide
Temporary Configuration Change Mike Hayes Exelon Nuclear.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
Safety Oversight for SLAC Accelerator Department Operations
Configuration Management
Take 5 for Safety Conduct of Operations – Control of Equipment and
Environmental Health and Safety Radiation Control and Radiological Services.
Breakout Group 2: Software Quality Assurance Outcome 8/18/10 1.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
4. Quality Management System (QMS)
4. Quality Management System (QMS)
SQF ISO FSSC GMP Programs
Safety Topic MOU with Facilities and Operations (F&O) Collider-Accelerator Department Time Meeting – March 9, 2010.
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Documents and Record Control Liu Xue Ning.
Maintaining Excellence Picture of the Week Collider-Accelerator Department Take 5 for Safety.
Overview of existing assessment schemes Rolf Bienert, John Lin.
Work Planning for Experiments P. Cirnigliaro Collider-Accelerator Department Take 5 for Safety.
Snow Collider-Accelerator Department Take 5 for Safety.
Safety Interlock Refresher Collider-Accelerator Department Take 5 for Safety.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Safety Review for Modifications Calling For Help Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
September 19-20, 2007 E. Lessard EBIS Safety EBIS Project Safety Ed Lessard September 19-20, 2007 DOE Annual Review.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
Why Do We Need The ASO? E. Lessard Collider-Accelerator Department (C-AD) Brookhaven National Laboratory DOE Accelerator Safety Workshop to
Building 801 Release of 25-day Sr-82 Collider-Accelerator Department Take 5 for Safety.
Internal Assessments at Argonne Accelerator Facilities S.W. Butala Presented at the DOE Accelerator Safety Workshop - BNL August 19, 2009.
SAD/ASE Lessons Learned A Safety Re-Assessment at Jefferson Lab in Accordance with DOE-O-420.2B Phil Mutton August 13, 2008.
Critical Design Review (CDR)
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
Take 5 for Safety E. Lessard January 13, Readiness for High Consequence Risks: Accelerator Operations  Implementing procedures tie responsible.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Accelerated Learning Update 4/14/2016 State Board of Education – HECC Joint Meeting Ben Cannon, Executive Director.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Conducting IH Exposure Assessments in CCA Operations Mike Cooley Eltaneice Bolden Bob Chapman.
Take 5 for Safety E. Lessard January 19, Credited Controls  Credited controls: controls determined through safety analysis to be essential for.
Ray Karol 2/25/2014. BNL Work Planning Subject Area Subject Area revision to come out soon which requires permitted and worker-planned work to evaluate.
1004E Posting Snow Clearing Picture of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
DOE Accelerator Safety Workshop 2017 Bob Lowrie
Planning for Succession
Accelerator Operations Department Readiness (Part 2)
Configuration Management and Layout Database ELENA Project
4.5 Checking and Corrective Action Monitoring and Measurement
E. Daly / K. Jordan / C. Hovater / T. Hiatt 03-AUG-2017
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

Configuration Management During Shutdown Picture of the Week Collider-Accelerator Department Take 5 for Safety

Configuration Management (CM)  The Accelerator Safety Order requires a CM program for accelerator safety  C-AD focuses on non-standard industrial hazards (radiation, ODH, large volume flammable gases) and maintains their corresponding Credited Controls identified in the ASE  Appropriate configuration management is considered necessary for mission and safety success, as is evidenced by documented cases attributed to CM inadequacies in several formal investigations, occurrences and mission delays at DOE accelerator laboratories 2

Configuration Management During Shutdown  C-AD follows an established procedure for changes to approved safety documents (the ASE and SAD)  See OPM  C-AD maintains a list of Credited Controls to control changes to key safety systems  Examples of Credited Controls are shielding, air handling systems, exhaust stacks, Access Control System…  See C-AD OPMs , 2.5.2, and  Boundaries related to specific Credited Controls at C- AD are defined in a checklist at: 3

Configuration Management During Shutdown  Ensure changes to accelerators and experiments are reviewed against the assumptions in the safety analyses  Changes are reviewed by C-AD RSC, ESRC and ASSRC since members are aware of assumptions in the safety analyses  Ensure changes to design limits (e.g., beam energy, beam current, etc.) are reviewed prior to making the changes  Ensure only the most recently approved versions of documents are used to maintain or calibrate Credited Controls  Document changes to the physical configuration of Credited Controls by updating the appropriate drawings  Ensure labeling for Credited Controls is maintained where applicable  Perform testing of Credited Controls after preventive or corrective maintenance 4

Picture of the Week - Self-Fulfilling Prophecy 5