1 Texas Regional Entity Report December 2007. 2 Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – 118.38 Initial.

Slides:



Advertisements
Similar presentations
1 Compliance Report WECC Board of Directors Meeting December 7-8, 2006 Steve Rueckert Director, Standards and Compliance.
Advertisements

PER Update & Compliance Lessons Learned
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
FRCC Fall Compliance Workshop October , 2013
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Cyber Security 2005 ERCOT COMPLIANCE ROLLOUT Lane Robinson Reliability Analyst.
NERC Functional Model AND HOW IT RELATES TO THE ERCOT REGION
Talk With Texas RE Protocol Compliance Department February 21, 2013.
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
ERCOT’S COMPLIANCE ASSESSMENT and ENFORCEMENT PROGRAM March 23, 2005.
Texas Regional Entity Compliance Report TAC July 9, 2009.
Texas Regional Entity Compliance Report Board of Directors June 15, 2009.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
April 23 rd OWG UFLS Survey & Power Factor Review.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Assessing Compliance. 2 NERC Compliance Workshop 11/02/07 Documentation of Compliance with NERC Reliability Standards Jeff Whitmer.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Status Report for Critical Infrastructure Protection Advisory Group
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
1 Texas Regional Entity Compliance Update July 2007.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Texas Regional Entity Compliance Report Board of Directors May 19, 2009.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Texas Regional Entity Compliance Report Board of Directors February 16, 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.
Texas Regional Entity Report Mark Henry June 6, 2008.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
ERS Update – DSWG Presentation September 21, 2012.
1 Audit Preparation. 2 September 8 – 11, 2008 ERCOT will be audited as the Reliability Coordinator (RC) Transmission Operator ( TOP) Balancing Authority.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Compliance Update Larry Grimm ERCOT Compliance To The ERCOT Board of Directors September 20, 2005.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Compliance Program Update Lisa Milanes Manager of Compliance Administration.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Page 1 of 21 Texas Regional Entity ROS Presentation June 11, 2009 T EXAS RE ROS P RESENTATION J UNE 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
1 Commercial Operations Working Group Update to TAC April 7, 2005.
Texas Regional Entity Compliance Report Larry Grimm September 4, 2008 TRE TAC September 4, 2008.
MOPC Meeting Oct , 2016 Little Rock, AR
Compliance Report to ERCOT BOD December 2006
Updated ERO Enterprise Guide for Internal Controls
NERC Entity Registration and Certification in the ERCOT Region
ERCOT Technical Advisory Committee June 2, 2005
Compliance Report to ERCOT TAC February 2007
Presentation transcript:

1 Texas Regional Entity Report December 2007

2 Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial scores for October indicate 34 non-wind-only QSEs passed and 1 non-wind-only QSE failed the PRR 525 measure

3 Texas RE Monthly Summary For October……….  Protocol & Operating Guides violations 1 new alleged  NERC Standards violations 17 new alleged – all resulting from entity self- certifications  0 New events reported 2 Compliance Reviews in progress  Final on-site Compliance Audit completed for 2007  2 Registration appeals denied by NERC Board of Trustees Compliance Committee  1 Appeal remanded to the Texas RE for resolution  1 Pending registration appeal

4 Texas RE Developments October 18 th – FERC conditionally accepted the proposed 2008 NERC and Regional Entity Budgets and Business Plans  Allows Regional Entities to collect their budgets as provided in their income statements  December 14, 2007 – Compliance filing required to clarify Texas RE’s non-statutory cost for 2008  April 1, 2008 – File 2007 budget true-up comparing 2007 proposed budget to actual expenditures October 23 rd – NERC Board of Trustees approved the amended and restated Texas RE/NERC Delegation Agreement  October 30 th – Regional Delegation Agreements filed with FERC

5 Texas RE Fall Workshop Report November 2nd – Austin Met Center Updated participants on the 2007 Compliance Monitoring & Enforcement Program Provided a “sneak peek” at the 2008 Compliance Program Over 100 attendees + additional participants on WebEx Speakers included Texas RE and NERC Staff

6 Texas Regional Entity Report Details

7 NERC CPS1 Performance ERCOT’s CPS1 Performance  October Performance Monthly comparison 2007: 2006: month rolling average comparison November 2006  October 2007: November 2005  October 2006: PRR 525 Performance  Scores for October indicate 34 non-wind-only QSEs passed and 1 non-wind-only QSE failed the measure  Scores posted on the ERCOT Compliance Website SCE Performance Scores

8 ERCOT CPS1 Performance Comparison

9 ERCOT CPS1 Year-to-Year Comparison

10 ERCOT’s CPS1 Monthly Performance

11 ERCOT CPS1 by Interval

12 QSE PRR Minute Interval Scoring

13 October 2007 – SCPS2 Scores

14 October 2007 Resource Plan Performance Metrics

15 Organization Registration Status Of 228 functions registered in the ERCOT Region, 9 entities have officially appealed their registration  4 appeals resolved by the Texas RE  3 appeals heard by NERC Board of Trustees Compliance Committee (BOT CC) 1 entity appealed their registration as a Transmission Owner – appeal denied 1 entity appealed their registration as a Transmission Owner/Planner – appeal denied 1 entity appealed their registration as a Generator Operator – appeal remanded to Texas RE for continued discussion and resolution with appealing entity  2 appeals pending and may go before the BOT CC for resolution 1 entity appealing their registration as a Generator Operator 1 entity appealing their registration as a Generator Owner

16 Registration Activities Purchasing-Selling Entity (PSE) Registration  Initially, registration notices sent to 33 entities  Registration criteria used Entity operates as a Qualified Scheduling Entity (QSE) in the ERCOT Market Entity shown on NERC TSIN (Transmission Service Information Network) List Entity schedules transactions across a HVDC tie ERCOT PSE registration being removed

17 NERC Functional Entity Types  DP – Distribution Provider  GO – Generator Owner  GOP – Generator Operator  TO – Transmission Owner  TP – Transmission Planner  RC – Reliability Coordinator  BA – Balancing Authority  TOP – Transmission Operator  PA – Planning Authority  TSP – Transmission Service Provider  RP – Resource Planner  PSE – Purchasing-Selling Entity

18 Compliance Process Flowcharts NERC Compliance Monitoring and Enforcement Program – Reliability Standards  Link to NERC Reliability Flowcharts Link to NERC Reliability Flowcharts ERCOT Compliance Process – ERCOT Protocols and Operating Guides  Link to Protocols & Guides Flowcharts Link to Protocols & Guides Flowcharts

Compliance Audits

Audit Schedule The 2008 Texas RE Audit Schedule is available here.here

21 Compliance Reviews of Events by Month

22 Violations of ERCOT Protocols

23 Violations of NERC Standards Reported by Month

24 NERC Standards Self-Certification NERC Registered Entities NOT audited in 2007 required to self-certify to the Actively Monitored Reliability Standards applicable to their Registration(s)  101 GOs  41 GOPs  23 TOs  165 Total Registered Functions

25 NERC Standards Self-Certification Self-Certifications were due October 1 st  95% overall response  18 Entities required second notice  8 responses outstanding 3 requested extensions which were granted 5 Entities will receive third notice Utilizing NERC escalation process for non-submittal of requested data

26 NERC Standards Self-Certification To date, 19 alleged violations identified (September & October)  6 FAC-008 – lack documented process 2 GOs  4 FAC-009 – lack documented process 2 GOs  4 CIP-001 – lack documented process 1 GOP  3 IRO-004 – lack documented process 2 GOs; 1 GOP  2 PRC-005 – relay maintenance delinquent 1 TO; 1 GO

27 NERC Standards Self-Certification Violation Details

28 NERC Standards Self-Reported Violations Pre-June 18 th

29 Risk Factors for Self-Reported NERC Standards Violations – Pre-June 18 th

30 NERC Standards Self-Reported Violation Categorization – Pre-June 18 th