LCTPC WP Phone Meeting #71 – 26.11.2008Micromegas module1 D. Attié, P. Colas Analysis Meeting, DESY 11 February 2009 LP test beam Micromegas analysis -

Slides:



Advertisements
Similar presentations
20 January 2011R&D staf meeting - Jan T.1 Activities in 2010 at DESY test beam 4-chip/Ingrid tests in March; 3 days OK Single Ingrid tests in May combined.
Advertisements

Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Beam test of Linear Collider TPC Micromegas module with fully integrated electronics * D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris,
Linear Collider TPC R&D in Canada Madhu Dixit Carleton University.
Preliminary results from winter data D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (most of the plots from Yun-Ha) 28/05/2009 Analysis meeting1LP micromegas.
1 Micromegas TPC R&D P. Colas. 2 R&D in progress and to be planned for R&D in progress and to be planned for Present collaborations NIKHEF, CERN workshop,
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Micromegas TPC Large.
SLAC 7-10 Jan. 2004M. Ronan - Micromegas TPC1 Micromegas TPC Magnetic field cosmic ray tests Review of previous Micromegas studies Review of previous Micromegas.
IHEP, Bejing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
P. Colas on behalf of LCTPC. 2 detector concepts : ILD and SiD SiD: all-silicon ILD: TPC for the central tracking 15/05/2012P. Colas - LCTPC2 Both based.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
Preliminary Micromegas Data Analysis Results D. Attié, P. Colas, M. Dixit, M. Riallot, Yun-Ha Shin, S. Turnbull, W. Wang 20/05/20101Wenxin Wang - LC-TPC.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Micromegas Panels LP electronics P. Colas. Foreword We aim at 1 single system –Same DAQ : easier comparison, less duplicate work We have to keep in mind.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas, M. Riallot LCTPC WP Meeting #79 25 March 2008 News from Micromegas modules.
D. Attié CEA Saclay/Irfu RD51 – ALICE Workshop June 18 th, 2014 ILC-TPC Micromegas: Ion Backflow Measurements.
Snowmass, August, 2005P. Colas - Micromegas TPC beam tests1 A.M. Bacala, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, K. Fujii, A. Giganon, I. Giomataris,
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
Orsay, January 12, 2005P. Colas - Resistive anode Micromegas1 Dan Burke 1, P. Colas 2, M. Dixit 1, I. Giomataris 2, V. Lepeltier 3, A. Rankin 1, K. Sachs.
Nov. 11, 2009 WP meeting 94 1 D. Attié SINP, January 22 th, 2010 Beam tests of a Micromegas Large TPC Prototype.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
Micromegas TPC Results from beam tests 7-module design ILD TPC mechanics and integration D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot,
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
Micromegas TPC Beam Test Result H.Kuroiwa (Hiroshima Univ.) Collaboration with Saclay, Orsay, Carlton, MPI, DESY, MSU, KEK, Tsukuba U, TUAT, Kogakuin U,
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin, R. Woods TPC Tests Analysis Meeting, DESY 28 May 2009.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
29/09/2010 1Wenxin.Wang_EUDET annual workshop D. Attié, P. Colas, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang and all the LC-TPC collaboration.
Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.
IHEP, Beijing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
A TPC for ILC CEA/Irfu, Apero, D S Bhattacharya, 19th June Deb Sankar Bhattacharya D.Attie, P.Colas, S. Ganjour,
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Wenxin Wang 105/04/2013. L: 4.7m  : 3.6m Design for an ILD TPC in progress: Each endplate: 80 modules with 8000 pads Spatial Resolution (in a B=3.5T.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
D. Attié, P. Colas, M. Lupberger, M. Riallot LCTPC WP Phone meeting 109 July 15, 2010 News from “Octopuce”
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
P. Colas, Endplates 1 LP phone meeting, May 9, 2006 Large Prototype Endplate(s)
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
A. SarratILC TPC meeting, DESY, 15/02/06 Simulation Of a TPC For T2K Near Detector Using Geant 4 Antony Sarrat CEA Saclay, Dapnia.
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
Wenxin Wang (D. Attié, P. Colas, E. Delagnes, Yuanning Gao, Bitao Hu, Bo Li, Yulan Li, M. Riallot, Xiaodong Zhang)
Vienna Conference on Instrumentation – February 27, D. Attié, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, A. Giganon,
Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, Y-H Shin S. Turnbull, R. Yonamine (Carleton, KEK, Saclay)
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
Large Prototype TPC using Micro-Pattern Gaseous Detectors
Large TPCs for HEP ILC-TPC & Fast Neutron detector
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
Large Area Endplate Prototype for the LC TPC
Power pulsing of AFTER in magnetic field
TPC Large Prototype Toward 7 Micromegas modules
Recents Analysis Results From Micromegas TPC
Micromegas TPC D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang, and all the LC-TPC collaboration.
in a high intensity beam
7-Module beam test D. Attié, P. Colas, W. Wang,
News from Micromegas modules
Status of LCTPC beam test analysis in Canada
Large TPCs for HEP RD51 P. Colas Lanzhou U., Saclay, Tsinghua U.
Covering a Large Area ILC-TPC endplate
News from Micromegas modules
Presentation transcript:

LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas Analysis Meeting, DESY 11 February 2009 LP test beam Micromegas analysis - Data flow, content and quality -

Meeting - DESY, 11 February 2009 Data flow T2K electronics 1728 channels Back-end electronic (ML405) PC T2K DAQ on Linux ILC_DATA_01 ILC_DATA_02 ILC_BCKP_01 ILC_BCKP_02 Saclay 500 Go 1 To 500 Go NativeToLCIO (Yun-Ha Shin) Transfert done by K. Dehmelt TCP/IP via ethenet Optical fibre 1-hour automatic rsync backup Grid

Meeting - DESY, 11 February 2009 Data content summary RUNDate (2008)DetectorGasSourceContent 1-79July-Sept.Standard Pads in gas boxØ, …Ø, 55 Fe DAQ, routing test, Sept.-Oct.Standard Pads in gas boxP5Cosmics Electronic tuning Oct.Resistive Anode in gas boxP5Cosmics Electronic tuning Oct.Resistive Anode in gas boxT2KCosmics Electronic tuning Nov. Standard Pads in LP1 [B=0] T2KCosmics Gas improvment, electronic test Nov. Resistive Anode in LP1 [B=0] T2KCosmics ~ events Nov. Resistive Anode in LP1 [B=0] T2K E e- =5 GeV + Cosmics Nov. – 8 Dec. Resistive Anode in LP1 [B=0] T2KE e- =5 GeV –15 Dec. Resistive Anode in LP1 [B=1T] T2KE e- =5 GeV Many z values, electronic shaping & frequencies, electric field ~ events

Meeting - DESY, 11 February 2009 Z beam = 50 cm Standard conditions*Low drift conditions** ZS (~ evts)No ZS (~3 000 evts)ZS (~ evts)No ZS (~3 000 evts) peakingTime (ns) Run #event Run #event Run #event Run #event / / Z beam = 30 cm Standard conditions*Low drift conditions** ZS (~ evts)No ZS (~3 000 evts)ZS (~ evts)No ZS (~3 000 evts) peakingTime (ns)Run#eventRun#eventRun#eventRun#event Z beam = 40 cm Standard conditions*Low drift conditions** ZS (~ evts)No ZS (~3 000 evts)ZS (~ evts)No ZS (~3 000 evts) peakingTime (ns)Run#eventRun#eventRun#eventRun#event run Z beam = 10 cm Standard conditions*Low drift conditions** ZS (~ evts)No ZS (~3 000 evts)ZS (~ evts)No ZS (~3 000 evts) peakingTime (ns)Run#eventRun#eventRun#eventRun#event Z beam = 20 cm Standard conditions*Low drift conditions** ZS (~ evts)No ZS (~3 000 evts)ZS (~ evts)No ZS (~3 000 evts) peakingTime (ns)Run#eventRun#eventRun#eventRun#event * Standard conditions: 230V/cm divideScaClockBy0x4 nClocksBeforeStop0x780 V (V)I (µA) Mesh3800 Cathode th Strip3978,1 ** Low drift conditions: 140V/cm divideScaClockBy0x4 nClocksBeforeStop0x780 V (V)I (µA) Mesh3800 Cathode th Strip39031,9 Data content summary (B=1T) B=OT data 25 sampling frequency

Meeting - DESY, 11 February 2009 Bulk Micromegas gain in T2K gas

Meeting - DESY, 11 February 2009 Total number of events: ~5×10 6 Data taken for z=10 cm at several sampling frequencies: 10, 25, 33, 50 & 100 MHz Most of data taken for alignment, electronic tests and parameters tuning are for specialists Electronic logbook available at: LCIO data available on the grid accessible within the VO 'ilc' at: lfn:/grid/ilc/tpc/2008/t24/micromegas/LCIO/*.slcio (srm://dcache-se-desy.desy.de/pnfs/desy.de/ilc/tpc/2008/t24/micromegas/LCIO/*.slcio) Data content summary

Meeting - DESY, 11 February 2009 Here you have some very helpful web links: Generalities: First of all, get a Certification Authority (CA): - Example for France: How to get the Virtual Organization direct link to subscribe to ‘ilc’ VO: How to access to the data

Meeting - DESY, 11 February 2009 Beam data in T2K gas

Meeting - DESY, 11 February 2009 LCTPC WP Phone Meeting #71 – Micromegas module 9 Peaking time: 1 μs Frequency sampling: 100 MHz Cosmic ray data sample

10 Acknowledgement Thank you very much to all who help in data taking !!! Analysis Meeting – DESY, 11 February 2009