Horsley Witten Group, Inc. Public Workshop Typical Maintenance Costs January 19, 2011 Several Slides Courtesy of Center for Watershed Protection Rhode.

Slides:



Advertisements
Similar presentations
West Virginia Conservation Agency. Section 319 Non Point Source Program WVCA is the primary entity responsible for the implementation of the: Agriculture.
Advertisements

Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
OFFICE OF THE CHIEF FINANCIAL OFFICER CFO What the heck is C-W-I-P and Why should I care?
Future of the Construction and Post Construction Water Quality Program
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
Institutional Controls Pamela Elkow and Richard Fil.
NATURAL RESOURCE STEWARDSHIP FOR HOMEOWNER ASSOCIATIONS Presented by: (Leader’s Name/Agency)
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Antrim Township Stormwater Management Reviewing Engineer: Dewberry-Goodkind, Inc.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
12/2/2011WORKSHOPS & WATERSHED MANAGEMENT PLAN 1 ARRA 604B WATER QUALITY MANAGEMENT PLANNING GRANT Guam Environmental Protection Agency.
Low Impact Development Training Module 9: Maintenance Requirements Dennis Chestnut.
NJDEP Maintenance Guidance for Stormwater Management
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
Doug Brown October 23, Budget Overview A Budget Planning Process (Overland Park’s) Financial Management.
Neponset Watershed CIC Grant Task 7: Regional O&M Database Framework for a cloud-based tool for stormwater management operations & maintenance plan development,
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
SAGHA Annual Homeowners Meeting August 20, Agenda  Open Board Positions Resolution  Year in Review  Treasurer’s Report  Common Area Items.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Module 7: Construction Phase
MCM#6 Pollution Prevention/Good Housekeeping Part 2 Municipal Grounds & Park Maintenance.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Post Construction Stakeholder Involvement Charles Brown Town of Cary.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Andy Erickson, St. Anthony Falls Lab Watershed Summit March 12, 2011 Identify and Prioritize Treatment Solutions.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Low Impact Development (LID)
Phase II National Storm Water Regulations What’s in it for you?
Kurt Nabbefeld, Senior Planner Kim Weil, Environmental Planner Bill Reilly, SSWU Manager May 18, 2009 City Council Work Session.
From the Beginning Design Standards and Other Post-Construction Program Elements.
SAGHA Annual Homeowners Meeting August 28, Agenda  Collect ballots  Treasurer’s Report  Common Area Maintenance Presentation  Election Results.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Operation & Maintenance of Permanent Stormwater Controls Overview of Inspection Requirements Laura Prickett, AICP, CPESC EOA, Inc. Construction Inspection.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
1 Module 2: Enhanced Systems When it’s more than a straight pipe from the catch basin to the waterbody Stormwater System Maintenance: A 4-Part Workshop.
San Rafael, California November 12, 2015
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Part 5 - Good Housekeeping
Using the MS4 Program Evaluation Guide 1/28/20161 Using the MS4 Program Evaluation Guidance.
Stafford County, VA Stormwater Management Maintenance Inspections Program Steven Hubble Environmental Programs Manager Department of Public Works.
Killing Two Birds with One Stone: Building a local program to maintain your stormwater practices and prevent pollution from your municipal operations Presented.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Prevention not Intervention Developing a Sound Response to Erosion and Sediment Control Problems through the Planning Process.
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.
Hampden Township Stormwater Management Program
Asset Management and Stormwater? Please Explain!
WORKSHOP I: Green Infrastructure Overview and Maintenance
Chesapeake Bay Program Partnership’s Citizens Advisory Committee
Field Performance Assessment of
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Kickoff example Create a new file
MS4 OVERVIEW 2015.
Presentation transcript:

Horsley Witten Group, Inc. Public Workshop Typical Maintenance Costs January 19, 2011 Several Slides Courtesy of Center for Watershed Protection Rhode Island Stormwater Design and Installation Standards Manual

Horsley Witten Group, Inc. Major: Rehabilitation or reconstruction Non-routine: Cleanout trash and sediment, structural repairs, partial rehabilitation Routine: Visual assessment, mowing, litter & debris removal, vegetation management Stormwater BMP O& M Pyramid Source: Erickson, et. al, 2010

Horsley Witten Group, Inc. Audience Poll Who has primary responsibility for maintenance in your community? –Haven’t figured it out yet –Private landowners or homeowners associations –Local government or other public agency –Hybrid of public and private sector

Horsley Witten Group, Inc.

Factors that impact maintenance costs Inspection frequency; Required routine maintenance (# of maintenance actions – function of type of practice); Required specialized equipment; Number of staff hours required for routine items; Required non-routine

Horsley Witten Group, Inc. Plan Review The Life Cycle Approach to Stormwater Maintenance The most successful programs recognize that effective stormwater BMP maintenance involves more than just maintenance

Horsley Witten Group, Inc. Maintenance Program Scoping Questions What are the local watershed protection and restoration objectives? How many stormwater BMPs are currently in place? How many more stormwater BMPs are expected? Where will they be located? Who will maintain them? What will be the level of service provided by the community? How can the program be funded?

Horsley Witten Group, Inc. Program Level of Service Complaint-driven /political program Regular inspection and maintenance schedule Inspection reports and record keeping Public vs. private maintenance Program funding

Horsley Witten Group, Inc. Maintenance Program Models Communities have several different options to consider when vesting maintenance responsibilities –Option 1: Private maintenance –Option 2: Public maintenance –Option 3: Hybrid

Horsley Witten Group, Inc. Maintenance Program Options Option 1: Private Maintenance Community responsible for public stormwater controls, homeowners or businesses have responsibility for private controls Reduces costs Good option for small communities with limited staff Community still responsible for education, tracking and enforcement

Horsley Witten Group, Inc. Key Considerations for Option 1 Who should conduct routine inspections? How to ensure that maintenance continues when properties change hands? When should enforcement be used?

Horsley Witten Group, Inc. Maintenance Program Options Option 2: Public Maintenance Community has full responsibility for maintenance of both public and private stormwater controls Uncommon due to costs Better control Requires dedicated staff and funding Avoids legal roadblocks and questions

Horsley Witten Group, Inc. Budgeting for a Local Maintenance Program Staff Equipment Administration Tracking/GIS Contractual Services Other

Horsley Witten Group, Inc. Maintenance LOS

Horsley Witten Group, Inc. Maintenance Manual Reference

Horsley Witten Group, Inc. Maintenance Checklists Appendix E

Horsley Witten Group, Inc. Annual O&M costs a function of capital cost Bioretention: $O&M% = 90.1($CC) Wet Basins: $O&M% = 230.9($CC) Open Channels: $O&M% = 2526($CC) For Example: Bioretention costing 50K O&M cost ~ 4% of CC Open Channel practice costing 50k O&M cost ~ 8% of CC CC = Cap Cost Source: Kang, Weiss: Univ of MN

Horsley Witten Group, Inc. Annual cost of sediment removal (2005) Source: Erickson, et. al, 2010

Horsley Witten Group, Inc. More cost data (2005)

Horsley Witten Group, Inc. More cost information Typical construction inspection costs for LID systems: 2-4% of Capital Construction Cost (HW personal experience) Source: Christina Basin Trib Team, DE, 2005

Horsley Witten Group, Inc. More cost data (2003)

Horsley Witten Group, Inc. More cost data (2003)

Horsley Witten Group, Inc. More data (2004+/-) (

Horsley Witten Group, Inc. More Data

Horsley Witten Group, Inc. Example Annual predicted maintenance costs Raingarden:$650 Infiltration chambers: $300/ system Site/landscaping: $2,000

Horsley Witten Group, Inc. Reduce Maintenance “Liability” During BMP Selection & Design Include low-maintenance, non- structural BMPs Thorough plan review ensures design standards are properly implemented Review the plan as if you were the maintenance crews…or have maintenance staff actually review the plans Get standards off the books and onto site plans!

Horsley Witten Group, Inc. Review site plans with maintenance in mind Require detailed maintenance plan –Inspection schedule –Maintenance frequency –Responsible party Require pretreatment Strive to make sediment removal operations quick and easy Design practices with gentle side slopes Include native vegetative “no mow” buffers around stormwater practices Require long-term vegetation management plan Plan Review Checklist Pretreatment Pretreatment Maintenance Access Maintenance Access Landscaping Plan Landscaping Plan Plan Review Checklist Pretreatment Pretreatment Maintenance Access Maintenance Access Landscaping Plan Landscaping Plan

Horsley Witten Group, Inc. Conduct Inspections During AND After Construction Use inspections to check progress and quality of installation, not just for erosion and sediment control Annual maintenance inspections Use detailed inspection checklists 1 FTE: 250 to 500 BMPs/year Third party inspections?

Horsley Witten Group, Inc. Routine and Thorough Inspections After Construction Annual inspections Detailed inspection checklists Measurements where available Mark problem areas (e.g. spray paint) Issue work orders to correct problems Third party inspections?

Horsley Witten Group, Inc. Synchronize Field Data and Office Data

Horsley Witten Group, Inc. Educate and Involve the Maintainers BMP “owner’s manuals” and other educational materials “Adopt-a-Pond” programs Volunteer cleanup events

Horsley Witten Group, Inc. Questions?