Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Effective Contract Management Planning
Commissioning. What is Commissioning? And the word Authority?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Ensure Vendor/Engineer of Choice Product Quality
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
Contractor Safety Management
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
Licensing of Nuclear Power Plants in Pakistan
Building Commissioning
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
EHS Management System Elements
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
Introduction to Software Quality Assurance (SQA)
Standards of Practice Course
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Basics of OHSAS Occupational Health & Safety Management System
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Scoping a Commissioning Job in Terms of Contractor Involvement ???
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Halcom Consulting llc Sustainability Consulting & Commissioning 2917 Carlisle NE Suite 109 Albuquerque, New Mexico p f
QUALITY MANAGEMENT STATEMENT
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
the Basic Commissioning (Cx) Process
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Steve Griffith February 28th, 2017
Software Quality Control and Quality Assurance: Introduction
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Software and Systems Integration
Projects Integrating Planning for Successful Occupancy, Operation, and Maintenance into your Capital Project.
Description of Revision
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
PSS verification and validation
DOE Review of the LCLS Project October 2006
Software Reviews.
Presentation transcript:

Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA

Fire Protection Engineering’s role in sustainability through Commissioning Fire Protection and Life Safety Systems are recognized as part of whole building systems. Sustainability is advanced through Commissioning as it pertains to Fire Protection and Life Safety Systems. Active and Passive Systems are included in this scope.

What is Commissioning?  Commissioning (Cx). A systematic process that provides documented confirmation that specific and interconnected fire and life safety systems function according to the intended design criteria set forth in the project documents and satisfy the owner’s operational needs, including compliance requirements of any applicable laws, regulations, codes, and standards requiring fire and life safety systems. A systematic process that provides documented confirmation that specific and interconnected fire and life safety systems function according to the intended design criteria set forth in the project documents and satisfy the owner’s operational needs, including compliance requirements of any applicable laws, regulations, codes, and standards requiring fire and life safety systems. Commissioning is initiated in the design phase by documenting the design intent and continues throughout construction, acceptance, and the occupancy period. Commissioning is initiated in the design phase by documenting the design intent and continues throughout construction, acceptance, and the occupancy period. Fundamental to Commissioning is Integrated Testing. Fundamental to Commissioning is Integrated Testing.

What is Commissioning?  Commissioning does not modify or supplant existing standard requirements for testing, rather its intended to complement these requirements by stressing integrated testing to ensure reliable functionality.  NFPA 72 National Fire Alarm and Signaling Code -SIG- TMS forms and requirements.  NFPA 25 ITM Water-Based Fire Protection Systems - forms and requirements.  Other NFPA Extinguishing System Standards - forms and requirements.  HVAC  Building Management

What is Integrated Testing?  An assessment of fire protection and life safety systems function and operation using direct observation or other monitoring methods to verify the correct interaction and coordination of multiple integrated systems in conformance with the fire protection and life safety objectives.

Integrated Systems  Commissioning applies to the functions of integrated systems, provided for fire protection or life safety, in the design phase, construction phase and occupancy phase of the commissioning process.

Owner’s Project Requirements (OPR)  The OPR should form the basis from which all design, construction, acceptance and operational decisions are made.  The OPR should be developed with input from the Owner and all key facility users and operators.  The development of the OPR begins with appointment of a Cx Team.

Cx Team (1)Owner (2)Commissioning Authority (3)Fire Commissioning Agent (FCxA) (4)Installation Contractor(s) (5)Manufacturer’s Representatives (6)Registered Design Professional(s) (7)Construction Manager/General Contractor (8)Owner’s Technical Support Personnel (9)Facility Manager or Operations Personnel (10) Insurance Representative (11) AHJ The Cx Team develops the OPR and initiate the Commissioning Process.

Key Cx Team Roles  Certain Cx team roles are important to successful Commissioning.  Fire Commissioning Agent (FCxA)  Registered Design Professional  Installation Contractor

Fire Commissioning Agent (FCxA) The FCxA represents the Owners interests and is responsible for the following: (1) Organize and lead the Cx Team, (2) Coordinate Cx Team meetings, (3) Facilitate the development of the OPR, (4) Verify Cx Process scope of work, (5) Integrate Cx into project schedule, (6) Prepare the Cx Plan, (12) Track and document issues, (7) Prepare Cx Process specs,(13) Prepare Cx Progress Reports, (8) Execute the Cx Process, (14) Witness system testing, (9) Review the plans and specs, (15) Review installation docs, (10) Attend pre-bid meeting, (16) Recommend acceptance, (11) Approve Systems Manual, (17) Track compliance with matrix.

Registered Design Professional (1) Participate and assist in the development of the OPR. (2) Document the Basis of Design. (BOD) (3) Prepare Contract Documents. (4) Respond to the Commissioning Team design submission review comments. (5) Specify operation and maintenance of systems in the project specifications. (6)Review and incorporate the Commissioning Teams comments, as appropriate. (7)Review test procedures submitted by the installation contractor. (8)Review and comment on the Commissioning Process Progress Reports and Issues Log reports. (9)Review and accept record documents as required by the Contract Documents. (10) Review and comment on the final Commissioning Record. (11) Recommend final acceptance of the systems to the Owner.

Installation Contractor (1)Include all Commissioning Process requirements and activities in the scope of services. (2)Attend required Commissioning Team meetings. (3)Include Commissioning Process milestones in the project schedule. (4)Implement the training program as required by the Contract Documents. (5)Provide submittals to the RDP, Owner and Commissioning Team. (6)Develop individual system test plan, including acceptance and integrated testing. (7)Notify the General Contractor and FCxA when systems are ready for testing. (8)Demonstrate the performance of the systems, including integration. (9)Complete the Construction Checklists as the work is accomplished. (10) Continuously maintain the Record Drawings as required by the Construction Documents.

The Process Phases: Pre-Design Phase. Design Phase. Construction Phase. Occupancy Phase.

Pre-Design Phase During the pre-design phase of the project, the Commissioning Team should: (1)Develop the OPR. (2)Select the FCxA. (3)Identify the Commissioning scope. (4)Develop the preliminary Commissioning Plan. (5)Review the Pre-Design documents. (6)Develop regulatory code analysis. (7)Initiate the commissioning plan.

Design Phase The commissioning team should: The commissioning team should: (1) Document the scope for commissioning activities. (2) Document the Cx Procedures and create a Cx Activities Schedule. (3) Verify that the construction documents comply with the BOD. (4) Identify qualified specialists and their responsibilities. (5) Coordinate and document Cx Team Meetings and progress reports. (6) Document issues and changes and update the Cx Plan. (7) Create construction checklists. (8) Create required project testing requirements. (include check lists requiring when AHJ’s and Cx Team members are to be present during acceptance testing) (9) Develop project training requirements

Construction Phase The Fire Commissioning Team should: (1) Confirm that the commissioning schedule is still valid. (2) Verify submittals are in conformance with the BOD. (3) Verify materials, construction and installation comply with the BOD. (4) Confirm qualified specialists are performing Cx activities per plan. (5) Coordinate and document Cx team meetings and progress reports. (6) Document any issues and changes to the project and update the plan. (7) Perform Cx (QC) construction inspections with plan checklists. (8) Perform required observation procedures or cause them to be performed by the responsible party. (9) Record and adjust for any revisions and/or changes to plan documents. (10) Verify and document testing performed in the Construction Phase.

Occupancy Phase The minimum requirements for occupancy phase should include but not be limited to: (1) Acceptance testing and inspection completion and documentation. (2) Conduct testing for modifications made during the construction phase. (3) Delivery of system manual, operation and maintenance manuals, and vendor emergency contact list. (4)Training on the use and operation of the systems. (5) Record set drawings and documents. (6) Test and inspection records for the systems. (7) A digital copy of site specific software for systems that is current with the installed system. (8) Warranties for the systems and equipment. (9) Recommended preventative maintenance program for systems. (10) A list of required ITM for fire protection and life safety systems.

Passive Systems Commissioning plans should also identify the requirements for passive fire protection systems including: (1) Fire and Smoke Dampers (2) Fire and Smoke Doors (3) Through Penetration Fire Stops

Re-Cx, and RCx Commissioning Plans should also address Re-commissioning (Re-Cx) and Retro- commissioning (RCx) requirements of active and passive fire protection and life safety systems where installed in existing structures.

Periodic Integrated Testing Periodic integrated testing (PIT) should verify correct operation of fire protection and life safety systems in accordance with the established design criteria, BOD, OPR, equipment performance requirements or applicable codes and standards.

Periodic Integrated Testing Periodic Integrated Testing Fire protection and life safety systems that have been commissioned upon installation in accordance with the Commissioning Process should have periodic integrated testing performed at intervals according to the commissioning plan.

Other PIT Rules Integrated systems in structures that have not been commissioned in accordance with the Commissioning Process, should have Integrated Testing performed as follows: (1)Where new component fire protection and life safety systems are installed and interconnected to existing fire protection and life safety systems. (2)Where existing fire protection and life safety systems are modified to become component, interconnected systems. (3)Where the interconnections or sequence of operations of existing integrated fire protection and life safety systems are modified. Phased sequencing of periodic integrated testing should be permitted subject to the approval of the AHJ.

Forms Commissioning documents and forms should be used to record commissioning and integrated testing of fire and life safety systems. Basis of Design documents referenced in installation standards should be utilized. Testing and inspection documents referenced in installation standards should be utilized for individual system testing.

Forms Where required by the AHJ, jurisdictional forms should be incorporated. Where no form or checklist exists, the Registered Design Professional should be responsible for developing a form or checklist. The Authority Having Jurisdiction should approve all forms.

Cx Questions? Cx Questions?