1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
1 BROOKHAVEN SCIENCE ASSOCIATES Nick Simos NSLS2 Ground Motion and Vibration Studies.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Nick Simos NSLS2 Ground Motion and Vibration Studies.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Support Update Diane Hatton, Project Support Division Director NSLS-II Project Advisory Committee Meeting May 24-25,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Title II Design Status Ove Dyling Assistant Director for Design Conventional Facilities NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Experimental.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
CONVENTIONAL FACILITIES STATUS
Details supporting the increase
CONVENTIONAL FACILITIES
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
CF Scope, Management & Organization
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Current CF Scope CF Issues CR impacts Vibration Management Lab Support Organization Schedule Cost Risks Path Forward

3 BROOKHAVEN SCIENCE ASSOCIATES CF Technical Performance Goals Structurally stable facility with low vibration (<25nm Rms) Tunnel design that provides required shielding and accessibility Tunnel temperature stability of +/- 0.1 deg C Utility capacity for up to 3.6 GeV operation Utility services & expansion capability to support full beamline build-out Facility layout enabling future long beamlines Experimental Floor noise level <NC60 Design for LEED Certification to meet sustainability requirements (DOE likely to require LEED Gold Rating)

4 BROOKHAVEN SCIENCE ASSOCIATES NSLS LOB Typ 4 1 in Base Scoope, 3 Future RF-LINAC AREA Service Bldg Typ 4 CFN Ring Bldg Future JPsi Future Guest House Future Conf. Center Underpass Loading CLOB Scope at Previous Review

5 BROOKHAVEN SCIENCE ASSOCIATES Current NSLS II Facility Overview Access Tunnel LOB (1 of 3) JPSI NSLS CFN BLOC NSLS II Service Bldgs (1 of 5) CHW Plant Bldg 603 Substation Future LOB ’ s

6 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview cont ’ d NSLS II Floor Plan 1. BLOC – Booster/LINAC/ Operations Center 2. LOB – Lab Office Buildings (3 base scope up to 5 future) 3. Service Buildings (5) 4. RF Area 5. Tunnel Area 6. Electrical Mezzanine 7. Experimental Floor 8. Access Corridor

7 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview cont ’ d Access Corridor Lab-Office Bldg SR Tunnel Experimental Floor Service Bldg 1 st Floor (earlier concept) Electrical Mezzanine (above tunnel)

8 BROOKHAVEN SCIENCE ASSOCIATES Compact Booster 1 st Floor Plan Operations Center Entry Lobby Linac Injection to Booster Booster Injection to Storage Ring

9 BROOKHAVEN SCIENCE ASSOCIATES Compact Booster 2 nd Floor Plan Operations Center Viewing Gallery and Bridge to Control Room Area Linac Klystrons Booster RF, Magnet Power Supplies, Cooling Systems and HVAC Service Areal Control Room Area

10 BROOKHAVEN SCIENCE ASSOCIATES Revised LOB Program The 2 LOB ’ s (1 integrated in CLOB, the other standalone) in CDR were insufficient to support full beamline buildout Intended to support initial suite of beamlines (~10) Would require substantial additional construction to support future beamlines (at least 3 more larger LOB ’ s plus expansion of original LOBs) Revised plan will provide 3 larger LOB ’ s to support more rapid build out of beamlines and transfer of NSLS beamlines

11 BROOKHAVEN SCIENCE ASSOCIATES Facility Program

12 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Issues Reliance on NSLS lab/office space Reliance on BNL to; Complete replacement of Warehousing area Share in expansion of Central Chilled Water Plant Impacts of continuing resolution on design schedule How to support future upgrade paths Extra long beamlines Super long straights Cost vs Beam Stability Goals

13 BROOKHAVEN SCIENCE ASSOCIATES BNL Support Warehouse Demolition & Replacement –Must remove Bldgs 86, 100, 210, 211, and 481 before FY 09 –Warehouse facility replacement is underway as GPP project –Demolition planned for Spring FY08 Chilled Water Plant Expansion –NSLS II and Lab must share expansion cost as both need added capacity –A/E selected and ready to begin design –Lab planning $4.9 M GPP/IGPP project –Design to run concurrent with NSLS II ACD, T-I and T-II –Construction start in FY09 and complete early FY11.

14 BROOKHAVEN SCIENCE ASSOCIATES Existing Site Building 603 CCWF Bldg 100 Bldg 209 Bldg 86 Bldg 210 Bldg 481 Bldg 211

15 BROOKHAVEN SCIENCE ASSOCIATES Continuing Resolution Impacts Prior Schedule had CD-1 in February, now likely in June Result - Funding for T-I delayed and limited Goal – minimize schedule impacts Approach Establish basic ordering agreement contract with selected A/E [HDR] Issue tasks for Advance Conceptual Design (ACD) to progress investigation of design concepts and alternatives Revised T-I A/E scope to address specific T-I deliverables Result – maintained overall schedule goal of readiness for CD-2 in 1 st Qtr FY08 Lehman review and EIR scheduled for early November

16 BROOKHAVEN SCIENCE ASSOCIATES CF Program for Vibration Management Assessment of “ green-field ” conditions Active participation in Beam Stability Task Force Identification and mitigation of cultural sources (where feasible) FE Modeling of site and facility design Needed to understand & predict facility response Design optimization tool Analysis of other facilities (CFN, APS & SPring 8 thus far) Draw upon lessons learned Provide input for model Model performance verification During & after construction, implement monitoring and maintenance program

17 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Organization Conventional Facilities Director M. Fallier Design A/E T-I, I, III HDR Giffels [C] Asst. Director CF Design Management O. Dyling Commissioning Contractor TBD [C] PE Trade Shop Support – Various [M] Subconsultants Vita-tech Colin -Gordon VJ Assoc.[C] Construction Management PM Agent CM – TBD [C] I C & C Project Manager TBD Civil Construction Project Manager TBD Building Project Manager TBD Chilled Water Project Manager TBD [M] – Matrixed [C] - Contracted Asst. Director CF Construction Management TBD ESH Manager R. Casey Design Review Industrial Hygiene Health Physics Construction Safety Project Support Procurement Project Controls Document Mgt Human Resources Information Management NSLS II Project Director S. Dierker CF Advisory Committee J. Hands, Chair Construction Analysts [C] Project Schedulers [C] Field Inspectors [C] Cost Estimators [C] ASD & XFD Technical Interface Managers ASD - E. Johnson, EFD- L. Micelli Site Prep Contractor [C] Building Contractor [C] CHW Contractor [C] Construction Safety Specialists [C] IC&C Contractor [C] Project Architect T. McEvaddy [M] Mech. Engineer G. Leskody [M] Civil/Struct. Engr. T. Joos [M] Elect. Engineer D. Danseglio [M] Sr Mech. Engr. C. Channing [M] ECS Design Supervisor J. Mills [M] QA Manager C. Porretto

18 BROOKHAVEN SCIENCE ASSOCIATES CF Schedule (CDR funding profile) Title I Design CD-2 Title II Design CD-3 Site Prep. Const. Ring Bldg Bid & Award 1st Pentant RFE (Pentant 1) 2 nd Pentant RFE (Pentant 5) 3 rd Pentant RFE (Pentant 2) 4 th Pentant RFE (Pentant 3) 5 th Pentant RFE (Pentant 4) Booster/LINAC/Ops Ctr (BLOC) Lab/Office Bldg ’ s (LOB ’ s) CHW Plant Expansion Mech & Elect Utilities Integrated Ctrl & Comm. Standard Equipment Commissioning Activity FY07 FY08 FY09FY010FY11FY12 FY13 Begin Accelerator Installation Full Ring Bldg Available for Accelerator & Beamline Installation Control Room RFE LOB ’ s Complete BO for all CF Construction

19 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Site Preparation package at start of FY09 would head- off some schedule risk Likely scope to include Clearing trees and brush Rerouting of utilities Removal of old foundations and abandoned utilities Grading to cut the site and verify subsoil conditions

20 BROOKHAVEN SCIENCE ASSOCIATES Cost Estimate

21 BROOKHAVEN SCIENCE ASSOCIATES Risk Assessment Technical Risk Primarily building stability, vibration & temperature control Schedule Risks Title I & II Engineering are on the critical path Construction of Ring Building is critical path Cost Risks Technical and schedule risks can impact costs Construction and material markets are still volatile Risk registry has been prepared Risk assessment database integrated with cost estimate database Current Contingency allocated for Conventional Facilities ~ 40%

22 BROOKHAVEN SCIENCE ASSOCIATES CF Path Forward Continue driving ACD process to finalize concepts for T-I Freeze accelerator lattice design – Ring bldg footprint Confirm program requirements Confirm siteplan and geotechnical suitability Continue benchmarking study of other LS facilities Continue focused technical studies (vibration, thermal modeling) Expedite award of A/E T-I contract when CD-I is received Execute T-I design plan Expedite agent CM award for T-I, T-II support services Prepare supporting documents for CD-2