PRACTICE OF COLLABORATION WITH LOCAL INDUSTRY IN PROJECTS OF NPP CONSTRUCTION WORLDWIDE L. Yanko Vienna, 9-10 February 2010 Technical Meeting on Topical.

Slides:



Advertisements
Similar presentations
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Advertisements

New opportunities for regional development through cross-border cooperation Ministry of Environmental Protection and Regional Development November 16,
June 2014 Bulgaria Investment climate and business opportunities.
Previous Efforts in the Electricity Sector to Improve Energy Efficiency On Supply Side  Maximum use of natural gas.  Increase of generation efficiency.
Nuclear Infrastructure Development Evaluation: Perspectives from the United States Dr. Marc A. Humphrey Office of Nuclear Energy, Safety and Security U.S.
Training Activity. The recent and significant technological evolution in the field of petroleum industry, has made it possible that many industrial installations.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
INTERNATIONAL COOPERATION IN EDUCATION AS A MEANS OF REACTING TO THE CHALLENGES OF GLOBALIZATION (report of the VSUES International Relations Vice-rector.
St Petersburg ATOMEXPO-2013 The IAEA recommendations for training of contractor personnel.
INTERNATIONAL CENTRE FOR SCIENTIFIC AND TECHNICAL INFORMATION (ICSTI) BUSINESS SUPPORTING ACTIVITIES AND PROJECTS.
Financial and Banking Association of countries-members of the Cooperation of Shanghai From trust to success.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
Euroheat & Power 21 October Heating Sector Institutional Reform in the Former Soviet Union Baku, 21 October 2005 Challenges in Liberalisation of.
EU – Russia Programme “Partnership for Modernization” and Its Role in the Technological Upgrade of the Russian Economy Elena Lenchuk (Institute of Economy,
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
National Seminar on Intellectual Property and its Impact on Economic Development Human Resource Development in the Field of Intellectual Property for Scientific,
ENERGY EFFICIENCY IN THE INDUSTRIAL SECTOR: PRACTICAL SOLUTIONS.
Дальневосточный федеральный университет The Concept of Applied Bachelor Degree Development on “Operation of NPP Heat and Power Equipment” for Personnel.
19-20 March 2009 IAEA, Vienna RER/9/096 Regional Planning Meeting "Strengthening National Infrastructures for the Control of Radiation Sources" (TSA-1),
1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.
Solution for Future Electrical Supply in the Middle Europe Nuclear Power Ivo Kouklík
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
International Atomic Energy Agency 1 International Partnerships in Managing INIS and Nuclear Knowledge Anatoli Tolstenkov Head, INIS Unit INIS & Nuclear.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
AREVA: Steps towards a global leadership in the energy industry
SOME ASPECTS OF NUCLEAR POWER INFRASTRUCTURE ASSESSMENT Technical Meeting / Workshop on Evaluation Methodology for Nuclear Power Infrastructure Development.
EPC EDUCATION AND TRAINING – Applications for Membership of the EU Turkey - April 1987 Cyprus - July 1990 Malta - July 1990 Hungary.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
Belgrade Investment Days September 2015 Belgrade.
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
JOINT STOCK COMPANY «ATOMTECHEXPORT» Creation Establishment Development Prospects.
Sergei Kondrat’ev Rector of the State Academy of Innovations Co-chairman-Coordinator of the Expert Council for innovation activities and intellectual properties.
1 Prospects of the Floating Nuclear Power Plant overseas projects State Atomic Energy Corporation “Rosatom” JSC “Concern Rosenergoatom” «Directorate for.
1 NRC Assistance for Emerging Nuclear Power Programs Jack Ramsey, Senior Level Advisor Office of International Programs March 11, 2009.
Interstate Statistical Committee of the Commonwealth of Independent States (CIS-STAT) On the implementation of the Project “ Program of personnel training.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E LashCIE Presentation 1/98 1 Recent Accomplishments and Future Directions Dan Giessing U.S. Department.
NUCLEAR INDUSTRY OF RUSSIA TODAY AND TOMORROW S.I. ANTIPOV NUCLEAR SOCIETY OF RUSSIA 15-th Conference of the Pacific Nuclear Society October 15-20, 2006.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
ROMANIAN EXPERIENCE IN TRAINING AND QUALIFICATION OF THE NPP OWNER/OPERATOR FOR UNIT 1 OF CERNAVODA NPP Dr. Ioan Rotaru TM/WS on Topical Issues on Infrastructure.
11 International Cooperation in the Nuclear Fuel Market as a factor of increasing the Security of Supply Moscow, 2009.
OPPORTUNITIES FOR CZECH COOPERATION WITH ROSATOM
El Cabril near surface disposal facility
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
POLISH DEFENCE INDUSTRY 2014 Polish Chamber of National Defence Manufacturers.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
ASTANA BENCHMARKING: International experts opinion and recommendations ,700 TWh According to international experts global energy resources.
UrFU, Ural energy institute. Institute today Institute was founded in 1930 and since that time was developed to meet challenges of energy industry and.
June 2016, Brussels Vladyslava Levakina
DDG Nuclear Energy: Mr Zizamele Mbambo
Challenges for BRICS International finance and Technology transfers
János Krutzler Hungarian Atomic Energy Authority
Project General Data Beneficiary: Rosenergoatom
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
JSC “ZAES” Activities Head of business development department
German-Uzbek STI Cooperation
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
PROGRESS AND CHANGES IN
Armenia Training and Tutoring Feedback
RCF Plenary Session 21 September 2018
Legal and Regulatory Framework for Nuclear Installations in IRAN
Belgrade Investment Days September 2015 Belgrade
Presentation transcript:

PRACTICE OF COLLABORATION WITH LOCAL INDUSTRY IN PROJECTS OF NPP CONSTRUCTION WORLDWIDE L. Yanko Vienna, 9-10 February 2010 Technical Meeting on Topical Issues of Infrastructure Development: Managing the Development of a National Infrastructure for Nuclear Power

our references: NPP of Russian (Soviet) Design Worldwide Finland Czech Republic Ukraine Hungary Slovakia Bulgaria Germany Romania Poland Egypt Libya  Cooperation with the foreign countries since 1950s in the fields of NPP construction, establishing of nuclear research centres, exchange of scientific and engineering experience, training of engineering and scientific personnel  Wide references: Since 1960s more than 30 NPP units with VVER reactors and 10 nuclear research centres have been constructed abroad (in the Czech Republic, the Slovak Republic, Finland, Hungary, Germany, Bulgaria, Rumania, Poland, Libya, Egypt, China, etc.) Loviisa NPP with VVER type reactors in Finland was recognized as one of the best worldwide  Unite diversified infrastructure of scientific, engineering and production cooperation of the partner-countries within the framework of the Council for Mutual Economic Assistance (COMECON)  In the last ten years contracts for 7 NPP units construction Kazakhstan China India Iran 2

International Cooperation between Russia (former USSR) and the Countries of Eastern Europe in Nuclear Energy  Creation of nuclear scientific and research centers  Construction of manufacturing enterprises  Construction of pilot NPP  Exchange of scientific and engineering experience  Establishment of oint institute of nuclear research and joint activities of Russian and foreign specialists therein  Training of engineering, technical and scientific staff 3

INTERNATIONAL SPECIALIZATION The Agreement on multilateral international specialization and cooperation in the manufacture and mutual supplies of NPP equipment for the period of 1981 – 1990 (June 1979) Each country was specializing in manufacture of certain types of NPP equipment: CSSR – reactor plants, steam turbines, steam generators, pipelines of large diameters Bulgaria – biological shield, condensers, axial and artesian pumps Hungary – refueling machines, special water treatment equipment East Germany – bridge cranes, transport-technological equipment Poland – pressurizers, heat exchanging equipment, standby diesel generator plants, in-core instrumentation systems Rumania – accumulators of emergency core cooling system, MCP Yugoslavia – bridge cranes, feedwater and special pumps, equipment of forced multiple circulation and drums-separators for RBMK reactors 4

AGREEMENTS  The agreements were aimed at training of national staff, joint choice and testing of nuclear reactor option for industrial NPP from the physical and technological points of view  NPP «Reinsberg» became a center of scientific and research activities of the nuclear engineering industry in GDR, and when a simulator was put in operation in 1974 it turned at the same time into a center of training and skill raising of NPP personnel from GDR and other countries-COMECON members  On the basis of NPP «Bohunice» was formed a large scientific and engineering center of nuclear engineering industry of Czechoslovakia which included the Nuclear Power Plant Research Institute (VUJE), NPP V-1 and V-2 «Bohunice», as well as a scientific center for personnel training 5

SYSTEMATIC APPROACH TO CREATION OF NUCLEAR ENGINEERING INFRASTRUCTURE The large-scale cooperation with the countries of Eastern Europe during NPP construction was systematic and integrated provided regular activities starting with siting elaboration of design adapted for concrete conditions supply of complete plant for NPP and finishing with performance of specific installation works providing technical assistance by all equipment installation supervision NPP commencement works and putting in operation 6

STABILITY OF CREATED INFRASTRUCTURE  The infrastructure, created under assistance of Russian (Soviet) organizations, demonstrated its stability to political and economical changes  Technical and economic performances of the power units constructed with participation of Russian (Soviet) specialists were and continue being one of the best globally  With participation of Russian organizations, modernization activities have been performed and are being performed presently at NPP power units in Bulgaria, Hungary, the Czech Republic, Slovakia 7

CURRENT RUSSIAN NPP PROJECTS ABROAD Busher NPP, Iran 1 Unit with VVER-1000 Kudankulam NPP, India 2 Units with VVER-1000 Tianwan NPP, China 2 Units with VVER–1000  Agreement on additional 4 Units  Additional construction site in Haripur district Belene NPP, Bulgaria 2 Units with VVER type reactors Form of open partnership and international cooperation Form of intergovernmental agreements New economic conditions – MARKET Siemens ASE Belene NPP utility  Commercial operation  Principal Agreement on units 3,4 - November 6,

TIANWAN NPP IN CHINA Russian side: design, equipment and materials supply Chinese personnel training Computer codes handover Contracted installation activities NPP commissioning technical responsibility for the project as whole JSC ASE Chinese side: Construction work Installation work in four buildings of the "nuclear island“ - 23rd Construction Corporation of China Nuclear Industry Electric and lighting equipment, instrumentation, laboratory equipment, part of the low-pressure pipelines and some pipe fittings Chinese design and research organizations were involved in work on the construction of TNPP, starting from the design stage 9

KUDANKULAM NPP CONSTRUCTION IN INDIA Russian side: Development of working documents Designer’s supervision over construction of buildings and structures Supply of equipment and materials Engineering support during installation and startup Indian personnel training Engineering support during guarantee operation period Indian side: Implementation of construction, installation and commissioning work at the NPP site technical responsibility for the project as whole JSC ASE 10

BELENE NPP CONSTRUCTION IN BULGARIA technical responsibility for the project as whole JSC ASE Russian side: Development of working documents NPP power units construction on “turn- key” basis Bulgarian personnel training Bulgarian side: According to the tender conditions participation of Bulgarian companies is up to 30% of construction costs 11

Open Partnership and Localization PROSPECTS OF COOPERATION 12 Implementation of joint reference NPP project – MIR-1200

SPECIFIC FEATURES OF NUCLEAR POWER PROJECTS  Higher capital costs  Prolonged process of permitting  Long construction period  Relatively low and constant operational costs  Significantly longer operational period (up to 60 years)  Risks related to nuclear fuel – for population, property, environment  Decommissioning costs and long term storage of spent fuel Different life cycles of projects (different evaluation and financing principles) of “expensive” nuclear plant with long operational period and cheap plant with short life cycle 13

L OCALIZATION GROWTH WITH NPP EXTENTION: step-by-step increase of national participation for subsequent units P ERSONNEL EDUCATION AND TRAINING S UBSTANTIAL USING OF LOCAL LABOR FORCES: maximum possible participation of domestic companies in civil works L ICENSING SUPPORT C OLLABORATION IN NPP MODERNIZATION C OLLABORATION IN PUBLIC ACCEPTANCE IMPROVING : exhibitions, seminars, workshops etc. OPTIONS OF THE SUPPLIER & USER INTERACTION 14

 Language of technical documentation, including procedures Russian – English – Official Language  Personnel training: general education in Russian VVER technologies (operated NPP, simulator) specific on-site simulator training (2 years before operation)  Differences in national regulatory requirements in user and supplier countries: supplier supports User’s collaboration with Regulatory Authority developed countries use IAEA recommendations FEATURES OF THE SUPPLIER & USER INTERACTION 15

Needs: workers’ township roads electricity transmission lines and grids social services setting up new and loading existing factories Building and installation staff rises up to people During the construction more than people should be employed INFRASTRUCTURE DEVELOPMENT 16

APPLICATION OF HUMAN RESOURCES EXPERIENCE IN HUMAN RESOURCES DEVELOPMENT – process of long duration – quite expensive – in some cases considered as correlations with specific technologies staffing/organization training/education work force planning recruitment/retention Critical factors to have an impact on training and education: The nuclear energy sector is characterised by long term horizons, technical complexities and need for knowledgeable and technically competent staff necessary for safe operations 17

THANK YOU FOR YOUR ATTENTION !