0 2005. 5 Strategies for the security of electricity supply.

Slides:



Advertisements
Similar presentations
Damage and Loss Assessment The Electrical Sector J. Roberto Jovel.
Advertisements

Business Plan: Balancing the electrical grid load by remote control of electrical consumers Student: Gregor Androjna address student:
The Single Electricity Market in Ireland
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
STRATEGIC VALUE OF GEOTHERMAL ELECTRICITY AND THE IMPACT OF ITS PRICING Anang Yahmadi PT PLN (Persero) – Directorate of Construction and New/Renewable.
Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Presented By Robin Tayal Impact of Spot Trading on Project Finance.
2 PRESENTATION “ECONOMIC POLICY UNDER CONDITIONS OF REFORMING MARKET OF POWER AND ELECTRIC ENERGY AND IMPLEMENTATION OF INVESTMENT PROGRAM” Archangelskaya.
The Key Issues in the Korean Electric System
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
1 THE RATE CASE PROCESS A Blend of Science and Superstition Presentation to the Mongolian Energy Regulatory Board By Burl Haar Executive Secretary Minnesota.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
First Lecture: Part 2 Strategic Evolution of Competitive Electricity Markets Derek W. Bunn London Business School.
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
1 Argentine Power Sector Market operation - facing stress situations CAMMESA Compañía Administradora del Mercado Mayorista Eléctrico APEX Conference October.
Natural Gas Shortages in Developing Countries Natural gas: The bridging fuel in the next decades Bent Svensson World Bank ENERGY WEEK 2006.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.
Integrated Electrics Two Steps Forward…One Step Back Scott Pearl Integrated Utility Analyst The Institute for Regulatory Policy Studies’ Energy Markets.
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Chapter 3 Arbitrage and Financial Decision Making
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
BY: WALLACE M. MAYS W M MINING COMPANY. South Inkai under construction.
Economics of electricity production and competitiveness of nuclear energy Prof. Dr.-Ing. Alfred Voß Institute of Energy Economics and the Rational Use.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Information and communicationDirectorate-General for Energy and Transport European Commission Security of Electricity Supply in the EU Stefan Gewaltig.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
Promoting Gas-Interconnector Investment - Insights from Laboratory Experiments Bastian Henze Tilburg University, CentER & TILEC GRI Workshop Stockholm,
The Hub Power Company Ltd. China-Pakistan Economic Corridor Power Projects Round Table on Energy Serena Hotel, Islamabad September 29 th -30 th, 2015 Nazoor.
Energizing you, powering our communities. Dynegy Energy Services September 18, 2015.
Illinois Wholesale Market Update December 10, 2003.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Nuclear Energy 2016: Status and Outlook
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
INTRODUCTION OF THE SYSTEM OF ACCOUNTS AND SUB-ACCOUNTS ENERGY COMPANIES Mr. Armen Arshakyan Head of the Tariff Policy Department Public Services Regulatory.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Electricity Market Game Review 13ELP044&644 CREST, Loughborough University.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Nuclear Power Economics and Project Structuring 2017 Edition
Global Energy Problems and Counter Policies and Measures of Korea
Electricity & Regulatory Overview of Korea
GEORGIAN ELECTRICITY MARKET OPERATOR
UNIT-IV - PRODUCT PRICING Methods of Pricing
Rate-of-Return Regulation
Generation Expansion Daniel Kirschen
Long-term Capacity Market
Discussions about the Role of Nuclear Power for Achieving the Paris Agreement in Japan Yutaka Nagata and Sumio Hamagata Socio-economic Research Center.
Wholesale Electricity Costs
Presentation transcript:

Strategies for the security of electricity supply

1 Contents 1.Risk factors in the present Basic Plan of long term Electricity Supply & Demand, and Strategies 1.Risk factors in the present Basic Plan of long term Electricity Supply & Demand, and Strategies 2. Risk factors in the open market and countermeasures 2. Risk factors in the open market and countermeasures 3. The strategy for the stability of price in the open market 3. The strategy for the stability of price in the open market 4. Nuclear energy and governmental support

2 Contents 1.Risk factors in the present Basic Plan of long term Electricity Supply & Demand, and Strategies 2. Risk factors in the open market and countermeasures 3. The strategy for the stability of price in the open market 4. Nuclear energy and governmental support

The basic plan of long term electricity supply & demand  Electricity companies enjoy decent profitability considering the rules and policies set by the government  The government is responsible for the Basic Plan The government predicts electricity demands, and devises relevant policies  The basic plan covers 14 years, and is updated every two years  The basic plan reflects basic directions, demands prospects, and construction plan of grid lines Power companies refer to the basic plan, when they make decisions of new investments.

The constructions in the Basic plan  The basic plan includes A, B, C1, classified by the degree of uncertainty. A : under construction, imminent completion B : in pre-construction stage after being approved C1: in planning stage to construct, expected to be approved within 2years (executions and processes are less certain)  C2: in planning stage, not included in the basic plan, not expected to be approved within 2years (some issues such as linkage to power network need further study) Planning (no approval within 2years) Under construction Preparing to start construction Planning (approval within 2years) C2C1BA

The Plan of constructions by GenCos  State owned GenCos plan to commission 31,100 MW facilities (81% of total construction) from 2004 to 2017 they will construct nuclear power plants and coal power plants, which are very capital intnsive  Private GenCo plan to construct 7,100 MW facilities, 19% of capacity entries they prefer to construct LNG power plants, which require less investment 21,200 (55%) 4,000 (11%) 9,900 (26%) 3,100 (8%) 31,100 (81%) 7,100 (19%) State owned Genco Private GenCo In preparation Total Under construction Plan period : 2004~2017, unit : MW 25,200 13,000 38,200

Prospects of capacity reserve margin  Capacity reserve margin is expected to be more than 15~17%, the proper margin level to guarantee supply, when the planned constructions are successfully completed capacity reserve margin is expected to reach 15 ∼ 18% by 2006, afterwards 25%

Risk factors in the execution of the plan  C1 constructions may not be executed if market condition changes unfavorably The government cannot force the private companies’ construction. State owned GenCos 9,900MW, private GenCos, 3,100MW  The constructions of nuclear power plants have many barriers to overcome Low public acceptance (NIMBY) and opposition of NGOs while 6 nuclear power plants (6,000MW) are scheduled for commissioning over the plan period  Prospects of capacity reserve margin by uncertainties The delay of C1 may trigger a demand-supply emergency starting from 2015 The delay of 6 nuclear power plants may trigger an emergency starting from 2013

Strategies to execute the construction plan  The Government (KEPCO) promotes C1 by state owned GenCos to meet the capacity entries timeframe The processes of constructions are cautiously evaluated by KEPCO  State owned GenCos will replace private GenCos in constructing C1 if the private GenCos withdraw  No corporate investment risk exists in constructing nuclear power plants because KEPCO holds 100% shares of the nuclear power company.  However, opposition of NGOs and citizens require continuous promotion to increase public acceptance to nuclear power plants. safety first operation co-prosperity with regional community advertising the necessity of nuclear energy in Korea due to high dependence on imported energy resources

9 Contents 1. Risk factors in the present Basic Plan of long term Electricity Supply & Demand, and Strategies 2. Risk factors in the open market and countermeasures 3. The strategy for the stability of price in the open market 4. Nuclear energy and governmental support

Risk factors to secure electricity supply in the open market  Investment decisions are made upon the price signals and predictability in the open market, however, the price signals may not function well when irrational market system distorts the signals when price hike and abnormal volatilities are caused by manipulations of any participants’ market power  The GenCos may fail to secure proper profitability for re-investment when the market is interrupted by regulatory body for the purpose of price stabilisation

Strategies to secure stable supply of electricity Cost Based Pool (CBP) is the realistic best solution  CBP has proven to be the best way to keep the market stability in Korea until effective solution is found: effective promotion of competition for cost reduction reasonable market price stable supply of electricity less distortion of market signal by irrational market system less market manipulation by participants less interruption by regulatory bodies

Strategies to secure stable supply of electricity  CBP has evolved through improvements such as adoption of BLMP and A/S Adoption of Base Load Marginal Price (BLMP) In a signal market pool, the estimated market price set by System Marginal Price (SMP) used to be too high to be accepted resulting from the portfolio of fuel mix Nuclear power plants and coal power plants determine BLMP LNG and oil power plants determine SMP Payments for ancillary services for grid security and cycle maintenance to meet the market system  Promoting investments by continuously improving CBP system The CBP market system will be improved, i.e. differentiated capacity payment (CP) will be linked to reserve margin low reserve margin, high CP high reserve margin, low CP To Be CP paid on the Pari passu basis to all available capacity As Is

13 Contents 1. Risk factors in the present Basic Plan of long term Electricity Supply & Demand, and Strategies 2. Risk factors in the open market and countermeasures 3. The strategy for the stability of price in the open market 4. Nuclear energy and governmental support

Whole sale market and securing the stability of price  Oil and LNG generators determine 75~80% of market pricing at around 5.7¢/kWh under System Marginal Price (SMP) system Oil and LNG generators produce 20% of annual generation volume.  KEPCO may suffer financial risks from high SMP and low tariff regulated at 6.5¢/kWh  Financial health of GenCos and KEPCO through price stabilization measures is essential. Load Duration Curve Nuclear Coal LNG / Oil 75~80% 8,760 hours Reserve Margin ( MW) 100%

Whole sale market and securing the stability of price  Introduction of BLMP has secured price stability The highest marginal price of base load generators is determined as BLMP The highest marginal price of peak load generators is determined as SMP The settlement prices have been maintained at around 4.2~4.4¢/kWh Nuclear Coal CP : 1.79 ¢/kWh Oil LNG CP : 0.63 ¢ Base Load Volume 78% (Variable Cost) 1.64 ¢ 3.44 ¢ 4.19 ¢ 4.80 ¢ 5.43 ¢ 0.35 ¢ BLMP SMP Introduction of Separate Settlement Peak Load 22%

Evaluation on the operation of the wholesale market  State owned GenCos have enjoyed significant increase of operating income ratio (16.5% before separation → 20.9% after separation). They own base load generators (nuclear, coal), and enjoy reasonable profits from market price.  Private GenCos in the market also have enjoyed reasonable profits. They own peak load generators (LNG), and are sufficiently compensated by the CP to recover fixed costs.  Private GenCos having PPA with KEPCO are guaranteed reasonable ROR(8%). ※ Operating income ratio of GenCos after separation classification average Operating income ratio19.1%21.7%21.9%20.9% ROR7.2%8.0%8.2%7.8%

17 Contents 1. Risk factors in the present Basic Plan of long term Electricity Supply & Demand, and Strategies 2. Risk factors in the open market and countermeasures 3. The strategy for the stability of price in the open market 4. Nuclear energy and governmental support

The status and the prospects of nuclear generation Prospects of nuclear generation  The further construction of nuclear power plants is necessary for securing stable supply of electricity as the demand is expected to highly increase in South Korea. Korea imports most of its generation fuel (99%), and the prices of fossil fuel rocketed recently (56%). ‘The basic plan of long term electricity supply & demand’ stipulates that nuclear power plant generation will stay at 30% of the total generation capacity.  Expanding public acceptance to safe of nuclear power plants and promoting timely constructions are required.

The status of nuclear generation Current status of nuclear energy in the electricity industry  20 nuclear generators (17,716MW) in operation compose 29% of total capacity in Korea.  The generation by nuclear power plants reached 39 % of total generation volume and 32% of the total traded amount in 2004, the highest shares among generation types.  The low generation costs of nuclear power plants helped Korea not to increase retail prices in spite of recent price hikes of oil and coal.

The status of nuclear generation The profitability of nuclear power plants in the market  The operating income ratio of nuclear power plants (22.4%) was higher than those of any thermal power plants. ROR of nuclear power (5.8%) was higher than the average ROR of GenCos (5.3%) in While thermal power companies suffer fuel cost increase by the coal price increase, the nuclear power company enjoyed market price increase without the increase of fuel costs.  No difficulty is expected in raising new investments in nuclear power plants with stable profitability under the current CBP market.

The governmental support to nuclear generation  Nuclear power plants need governmental support for securing construction site and disposal site, and for continuing operation More constructions of nuclear power plants are inevitable in order to secure electricity supply and stable market price of electricity in Korea  Institutional Support for constructions of nuclear power plants Economic benefits to local areas near power plants $9~14mn/year by “special laws for the support of local area accepting location of low-medium radio active waste $68mn/year by ‘special laws for the support of local area neighboring power plants Reduction of risk of nuclear energy business by ‘laws for nuclear damages’. Public relationship in support of nuclear power plants.