Cooling Channel Instrumentation Update M. Haney University of Illinois at Urbana-Champaign 6 February 2004.

Slides:



Advertisements
Similar presentations
Basic Jens Neigaard.
Advertisements

MTA Instrumentation M. Haney University of Illinois at Urbana-Champaign 25 February 2004.

Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Lecture 1: Safety and Protection. 1. A robot may not injure a human being or, through inaction, allow a human being to come to harm. 2. A robot must obey.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Slow controls and instrumentation of MICE 1.Physics and systematics 2.How the state of the cooling channel gets defined 3.Engineering for the signal readout.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002.
Laboratory 5: Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report / Presentation Closing.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Mucool LH2 Absorber Progress and Pauses Mary Anne Cummings FNAL August 12, 2002.
Feb Absorber/coil instrumentation and controls  Subsystems Absorbers RF Magnets  Monitoring/safety  Data acquisition: Information on system.
Computer Control. Computer Control Basics Input – (Sensors) Processing – (Black Box) Output – (Actuators)
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
The Interface Solution Experts Intrinsically Safe Design, TCM installs in: Class I, II, & III Div 1 and 2 (Zones 0/1 & 2) Up to 32 Channels.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
COMPUTER SYSTEM.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SCADA and Telemetry Presented By:.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
DATA ACQUISITION Today’s Topics Define DAQ and DAQ systems Signals (digital and analogue types) Transducers Signal Conditioning - Importance of grounding.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
15 March 2001Absorber Review Meeting at NIU1 DAQ for Pressure Test, and later... Michael J. Haney University of Illinois
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Computer Hardware Basics
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
CUE – Make Any Pump an E-Pump
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Introduction to LabVIEW
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
AGROFARM WEATHER MONITOR USING LabVIEW. INTRODUCTION Innovation in agriculture field Implementing instrumentation tech. in agricultural field The quantity.
ACT20X Ex isolator/ amplifier. Page 2 ACT20X (Ex isolators family) Overview - Connects to process equipment in Class/Div, or Zone 0 - Zone 2 areas - ACT20X.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
PCAR Precision In Practice 1 Precision In Practice Achieving the best results with precision Digital Multimeter measurements Paul Roberts Fluke Precision.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
S A Griffiths CM42 June 2015 Electrical & Control.
Rotor Pole Temperature Sensor Network
Calorimeter Mu2e Development electronics Front-end Review
ProtoDUNE SP – Slow control temperature readout setup test
SCADA for Remote Industrial Plant
New hardware and software were created to support the solid DT direct heating work A Cernox RTD thermometer was mounted inside the DT cell, 1 mm behind.
Linac Test Area Instrumentation
Electrical Safety Standards
MuCool Test Facility Instrumentation Update
Linac Test Area Instrumentation
SNS PPU Cryomodule Instrumentation
University of Illinois (UIUC)
SNS PPU Cryomodule Instrumentation
University of Illinois (UIUC)
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Cooling Channel Instrumentation Update M. Haney University of Illinois at Urbana-Champaign 6 February 2004

6 Feb 2004M. Haney2 Update Primary efforts on cable considerations –Since we have the electronics in-hand, as well as prototype DAQ software in-service Cabling inside the cryostat Cabling outside the cryostat

6 Feb 2004M. Haney3 Wire Considerations - inside QuadTwist –2-pair, 36 AWG phosphor bronze –Formvar insulated, color-coded –Compared to 32 AWG manganin QT is pre-twisted, color coded pairs, 0.63 smaller, yet 0.6 less DC resistance(!) But, QT has 1.9 greater thermal loss, and end-prep is (somewhat) delicate work –If I can do it, it can’t be that delicate…

6 Feb 2004M. Haney4 Manganin vs Phosphor Bronze

6 Feb 2004M. Haney5 Internal Shielding Stainless steel (36 AWG) drain, with foil around pairs –See next slide (foil+drain) Stainless steel braid around all –Easier to handle than stainless conduit

6 Feb 2004M. Haney6 Wire Considerations - outside Shielded twisted pair –We are using 2-pair foil-out, common drain –Recommend N-pair foil-in, drain-per-pair Consistent with Lakeshore 218 shielding –4-wire measurement, shield-per-pair Belden offers (up to) 32-pair cables –DigiKey has (up to) 6-pair

6 Feb 2004M. Haney7 Testing Lakeshore 218 monitor MTL7055ac (low level) and MTL7060ac (star-connected) –Intrinsically Safe Barriers 23m (75 ft) of shielded twisted pair –2-pair, 22 AWG, belfoil (out), common drain $76/500ft from Digikey 30  on each of the 4 wires, –to mimic 2m of 32 AWG manganin wire Lakeshore MW  /m at 4.2K, 14.3  /m at 77K 1000  load resistor –Compare to R =  ; dR/dT =  R =  ; dR/dT =  /K 218 barriers 75’, shielded, twisted 30 , times 

6 Feb 2004M. Haney8 Results Cleanliness is paramount! –10  A excitation, so nanoamps of leakage are significant! Worst-case deviation: 0.5  –1000  on back of 218, vs full test setup At dR/dT =  /K … K (systematic) error

6 Feb 2004M. Haney9 Other/Work in Progress Recently acquired –Keithley 7001 switch mainframe, 7013s isolated switch module Recently borrowed –Keithley ½ digit multimeter Goals –Confirm quantitative cleanliness (little/no leakage) –Confirm (non)effect of thermoelectric (junction) voltages

6 Feb 2004M. Haney10 Slides shown previously

6 Feb 2004M. Haney11 Instrumentation (1) Lakeshore 218S –8 channel cryo temperature monitor 20mV (diodes) or 50 m  (RTD) resolution –10’s of mK at 20K –16 readings/s (/channel) –GPIB interface (to PC) –4 units in-hand (and a spare) Will need to consider (re)calibration protocols –Annually?

6 Feb 2004M. Haney12 Instrumentation (2) CX-1030-SD Cernox RTD sensors (12) –-10  /K at 20K (estimated from plots) –Better suited for lower temperatures –Recommended for use in magnetic fields (B<19T) –Rad hard CX-1050-SD Cernox RTD sensors (24) –-70  /K at 20K (estimated) –Fermi “favorite” Also –TG-120PL GaAlAs diodes (4) -180mV/K at 4.2 K for B < 5 T, but no longer claimed to be rad hard…

6 Feb 2004M. Haney13 Instrumentation (3) FISO Fiber-optic strain and temperature –BUS chassis, with 4 (up to 8) modules 1000 readings/s RS-232 interface (to PC) FOS-N strain sensors –+/  ; 0.01% full scale; 0.2mm O.D. FOT-L temp sensors –0.1 K resolution; 1.5mm x 32mm (10mm active) –Slow: 1.5 second response…

6 Feb 2004M. Haney14 Instrumentation (4) Gateway E-4000 PC –1.8 GHz, 1Gbyte RAM, 0.5Gbyte cache –120Gbyte disk, Windows 2000 –15” LCD flat panel display –640x480 CCD camera, microphone PCI-MIO-16E-1 –16 channel ADC, 1.25 Msample/s, 12 bits, +/-10 V Tripplite Internet Office UPS –500 VA –30 minutes (nominal) power for PC But mostly intended as power filter for Lakeshore 218’s

6 Feb 2004M. Haney15 Instrumentation (5) IRM –64 channel multiplexed ADC 16 bit, 100 Ksamples/s –ACNET network connection All PC data will be posted to IRM for ACNET access

6 Feb 2004M. Haney16 Instrumentation (6) MTL7055ac barriers –Low level AC 24  per line 3 V max MTL7060ac barriers –Star-connected AC 101  per line 8.5 V max

6 Feb 2004M. Haney17 Status Hardware acquired –PC, FISO, Lakeshore (temp) +sensors, IRM, etc. All major items in-hand Software written –IRM communications: to, from –Lakeshore readout –FISO readout All major elements written and integrated –For one Lakeshore 218… Intrinsically safe solutions (barriers)

6 Feb 2004M. Haney18 Open Issues Wire+Shielding Concerns –Cable plant into solenoid Shielded-twisted pairs (two pairs per Cernox) –Shield drains carried from Lakeshore(s) to sensors (not grounded) Grounding –Details depend on overall MuCool grounding scheme –Common mode (surges) due to magnets Need to protect electronics without burning barriers –Noise/sensitivity issues

6 Feb 2004M. Haney19 Open Issues (2) FISO temp/strain sensors –Qualification at cryogenic temps Software Concerns –System integration 3 more LakeShore 218’s –Remote control of PC PCAnyWhere vs VNC –Fermi network security policies…

6 Feb 2004M. Haney20 MTA Instrumentation: Data Paths: ACNET Perspective FISOLakeshore(s)PCIRM16 chan ADC Strain, temp temp Fast, local signals (e.g. piezo transducer) Slow, local signals (e.g. magnet current(s)) To ACNET consumers

6 Feb 2004M. Haney21 MTA Instrumentation: Data Paths: LabView Perspective FISOLakeshore(s)PCIRM16 chan ADC Strain, temp temp Fast, local signals (e.g. piezo transducer) Slow, local signals (e.g. magnet current(s)) From ACNET sources To PC/LabView consumers

6 Feb 2004M. Haney22 Two Safety Possibilities (1) Intrinsically safe UPS PC w/16 chan ADC FISO LakeShore(s) (temp) IRM Barrier(s) network ACNET Sealed Conduit(s) Intrinsically safe signal conditioners and transmitters (as needed) power Hazard Safe

6 Feb 2004M. Haney23 Two Safety Possibilities (2) Gas-purged box UPS PC w/16 chan ADC FISO LakeShore(s) (temp) IRM Barrier(s) network ACNET Sealed Conduit(s) power Hazard Safe

6 Feb 2004M. Haney24 (basic) Barrier Power + Signal Return Ground “safe circuit” fuse

6 Feb 2004M. Haney25 Signals inside (the cryostat) 32 (cryo) temperatures –16 inside absorber, 16 outside Front and back –readout via GPIB + LabView (PC) Multiple fibers –FISO strain, temperature (4) Pressure, flow? –Laser occlusion (2)? Edgar Black looking at a scheme using standard data fibers…

6 Feb 2004M. Haney26 (more) Signals inside Piezo vibration sensor (?) –via (16 chan/12 bit) ADC and LabView (PC) Local (64 chan/16 bit) IRM channels –via LabView

6 Feb 2004M. Haney27 Signals outside Many voltages, currents, temperatures, pressures –magnets, beam position monitors, etc. –Most available from ACNET or local IRM via LabView –or Quadlog-PLC

6 Feb 2004M. Haney28 End