Neutron Electric Dipole Moment 1.D. Beck (Intro) 2.S. Williamson (He3 Services construction and testing) 3.L. Yang (Light collection) with J. Blackburn,

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Flex Circuit Design for CCD Application ECEN 5004 Jon Mah.
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.
Patricia Aguar Bartolomé Institut für Kernphysik, Universität Mainz PSTP 2013 Workshop, Charlottesville 11th September 2013.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Light Transport and Detection with VLPCs D. Dutta TUNL/ Duke University MEP group.
A Muon Veto for the Ultra-Cold Neutron Asymmetry Experiment Vince Bagnulo LANL Symposium 2006 Outline ● UCNA Experiment ● Muon background ● Proposed Veto.
Another Route to CP Violation Beyond the SM – Particle Dipole Moments Dave Wark Imperial/RAL WIN05 Delphi June 10, 2005.
The Effect of Temperature on the Dark Rate of the Silicon Photomultiplier By Jie Zhao Mentor: Dr. Richard Jones.
Daniel Lenz, University of Wisconsin, Madison 11/05/ APS DNP Cryogenic search for neutrinoless double beta decay Daniel Lenz on behalf of the CUORE.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 Light Collection  Once light is produced in a scintillator it must collected, transported, and coupled to some device that can convert it into an electrical.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Photon detection Visible or near-visible wavelengths
Test of Silicon Photomultipliers (SiPM) at Liquid Nitrogen Temperature Yura Efremenko, Vince Cianciolo nEDM CalTech Meeting 02/14/2007.
Electric Dipole Moment of Neutron and Neutrinos
Cryogenics for LCGT Technical Advisory Committee for LCGT ICRR SUZUKI, Toshikazu High Energy Accelerator Research Organization.
DHB, nEDM Collab. Mtg, 15/16 Apr 04 UIUC Test System (Beck, Chandler, Hertzog, Kammel, Newman, Peng, Sharp, Williamson, Yoder; Blackburn, Kenyon, Thorsland)
NEDM Collaboration Meeting, May 25-26, He Relaxation Steve Williamson UIUC.
Design study for ET 3rd generation Gravitational Wave Interferometer Work Package 2 Suspension, Thermal noise and Cryogenics Piero Rapagnani
Results from the HV Test System Review of current design and assembly J. Long, P. Barnes, J. Boissevain, J. Gomez, S. Lamoreaux, D. Mischke, S. Penttila.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Motivation Polarized 3 He gas target Solenoid design and test 3 He feasibility test Summary and outlook Johannes Gutenberg-Universit ä t Mainz Institut.
HD target.
Background from the NIST test The pencil neutron beam (1 mm 2 ) with intensity about 7000 n/sec The beam was completely absorbed in the beam stop with.
1 Preparation for the 3 He Injection Test 11/2007 MIT/BATES D. Dutta*, H. Gao, M. Busch, Q. Ye, X. Qian, W. Zheng, X. Zhu ( Duke University) ASU, BU, Caltech,
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
1 NEDM 4 He Purifier and Other Cryogenic Issues David G. Haase North Carolina State University Update on Cryovessel Engineering Evaporative Purification.
1 Update of the injection test 06/2007 nEDM H. Gao, M. Busch, Q.Ye, T. Mestler, X. Qian, W. Zheng, X. Zhu Duke University And others in nEDM collaboration.
Duke nEDM Collaboration Meeting The status of 3 He Relaxation Time Measurement at ~400mK Q. Ye, D. Dutta, H. Gao, W. Zheng, X. Zhu Duke University R. Golub,
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
G-2 accelerator and cryo needs Mary Convery Muon Campus Review 1/23/13.
Dressed Spin Simulations Steven Clayton University of Illinois nEDM Collaboration Meeting at Arizona State University, February 8, 2008 Contents 1.Goals.
DOE 2/11/05 #1 EDM R&D Progress Steve Lamoreaux, Los Alamos Co-spokesperson for the EDM Project for presentation to The Department of Energy Cost & Schedule.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
He3 dilution refrigerator
Preparation for the 3He Injection Test
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Study of T 1 relaxation time A proposal to test T 1 using a dilution fridge and SQUID NMA at Royal Hollow University,London.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Summary of Valve Design Status for nEDM L. Bartoszek BARTOSZEK ENGINEERING 6/20/05.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Valve Update  Study several stem/seat geometries (Feb)  Demonstrate He II leak tight for 3/8, 1 in. diameter with modest (~ few psi) pressure difference.
Transport of 3 He by heat flush measurement of 3 He concentration tests of heat flush George Seidel Brown University.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
Installation of the T600 at Fermilab CSN2, September 22,
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
KIT - The cooperation of Forschungszentrum Karlsruhe GmbH and Universität Karlsruhe (TH) Florian Fränkle EPS HEP 2009 Krakow 1 KATRIN: An experiment to.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
R&D Plan on Light Collection Takeyasu Ito Los Alamos National Laboratory.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
NEDM Cost and Schedule Review, February 11, 2005 Upper Cryostat and Valves Cost and Schedule for WBS 3.2, 3.3, 3.4, and 8.2 L. M. Bartoszek D. H. Beck.
Office of Nuclear Physics R&D 12/14/06 #1 Risk Based R&D Plan Martin Cooper Los Alamos.
Specifications for the Integrated Tests II Paul Huffman.
Teleconf ACS – FREIA 28th March 2017
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
Design of the Injection Can
Neutron and electron electric dipole moments
Update on He3 Services design since the ORNL meeting
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Renzo F. Parodi INFN-Genova
Presentation transcript:

Neutron Electric Dipole Moment 1.D. Beck (Intro) 2.S. Williamson (He3 Services construction and testing) 3.L. Yang (Light collection) with J. Blackburn, J. Nicholson, T. Rao, S. Sharma, P. Sobel, E. Thorsland

Status l Ongoing development project l Currently in year 2(of 4) of “Critical Component Demonstration” phase  Successful completion of Critical R&D phase in Dec  Continued Annual Reviews, Technical Review Committee meetings  15 critical component activities  GOAL: reduce risk, build from inside out l Equipment funding from NSF for He3 Services (UIUC), Magnet Systems (Caltech) at ~$1.4M/year l Equipment funding from DOE for Central Detector System, Cryogenics, Neutronics at ~$1.8M/year Lessons learned  modified design He3 services Central Detector 2

l Measure neutron precession frequency in NMR-style experiment Experiment Overview Concept: Golub and Lamoreaux, Phys. Rep. 237 (1994) 1 Measurement cell cutaway HV Ground Measurement Cells (7.6x10x40 cm) B E Scintillation signal (B/40) h =2(  B  dE)  (n + 3 He) ~ 0,  (n + 3 He) ~ 2 Mbarns l 3 He co-magnetometer 3

Experiment Statistics Incident neutron fluence  cold ~ 3x10 8 n/s:  ~ 0.3 Å FWHM UCN density at beginning of measurement n UCN ~ 100 cm -3 Polarized 3 He densityn 3 ~ cm -3, n 3 /n 4 ~ 5x Cell volumex·y·z = 7.6·10·40 cm 3 = 3100 cm 3 Holding fieldB 0 ~ 30 mG x Electric fieldE 0 ~ 50 kV/cm x Precession frequenciesf n ~ 100 Hz, |f n – f 3 | ~ 9 Hz Operating temperatureT op = 0.45 K Refrigeration~ K Official sensitivity (3 years)  d = 3-5x e·cm (90% CL) 4

nEDM Activities l UIUC responsible for “ 3 He Systems”  Getting the polarized 3 He both in and out Source is existing Atomic Beam Source Use “heat flush” to remove ( 3 He transported using phonons)  3 He enters some distance from measurement cells  plumbing including valves, etc. l He3 Services Critical Component Demonstration activities (Williamson)  Dilution Refrigerator  Injection System  Purification System l WLS fiber light system readout (Yang) Atomic Beam Source to Central Detector He3 Services System Dilution Refrigerator Injection system Purification system 5

nEDM Activities in Support (DHB) 1. Theory of transport coefficients of dilute solutions of 3 He in superfluid 4 He (heat flush)  Baym, Beck and Pethick Phys. Rev. B 88, (2013) ; JLTP 178 (2015) 200, and to be published 2. Design and performance of magnetic shielding for nEDM experiments (with TUM)  I. Altarev, et al. Rev. Sci. Instrum. 85, (2014) 3. Possible test nEDM experiment at ILL (Illinois student?)  CryoEDM cancelled at ILL 4. Development of external atomic vapor magnetometry for TUM experiment  Require array of magnetometers  Proof of principle of all-optical vector magnetometry (B. Patton, et al. PRL 113 (2014) ) 5. Development of cryogenic NV-diamond magnetic and electric field sensor  STTR DE-SC with Southwest Sciences & Sarvagya Sharma 6

l Introduction l Injection system  Film-burner test  The InjVol/IV1 conductance test  Radiation heat-load test l Purification system  Heat-flush test l Dilution refrigerator Steve Williamson Helium-3 Services 7

Polarized 3 He in l The experiment relies on efficient…  injection of polarized 3 He into isotopically purified 4 He  transport of the polarized 3 He to the measurement volumes  maintenance of polarization during the measurement  removal of unpolarized 3 He when a precession measurement is complete. Inject 3 He and n Move 3 He to Measurement Cell Measure Remove Unpolarized 3 He 8

Where are we? Critical Component Demonstration (CCD) l A working dilution refrigerator meeting the operational and material requirements l Critical components for the injection and purification systems individually tested at operating temperature l All testing, including full He3 services cryostat, at UIUC 2014 Pre FY12 Critical Component Demonstration Large Scale Integration Conventional Components R&D Data Collection Assembly and Commissioning … Helium-3 Services (He3S) CCD Goals 9

Injection System ABS Film- burner InjVol IV1 InjVol valve l Prepares polarized 3 He in isotopically purified 4 He for transport to the measurement cells. l Some of the CCD challenges :  Control superfluid film from bulk LHe in InjVol.  Cooling InjVol and IV1 Plastic (no metal), no sinter InjVol is coldest point in He3S (300 mK) IV1 must come to equilibrium quickly  Thermal isolation and seal of InjVol valve 10

l Evaporation of film into beam line must be prevented  Produces large heat load to injection volume (HeVAC)  4 He gas can block the beam ( 3 He- 4 He atomic scattering) l Film-burner concept  Evaporate the film with a heater.  Then re-condense it where … cooling is efficient and gas conductance to beam line is low Film-burner Heater Injection Volume LHe, T= 0.3 K Film- burner Assembly Baffle Beam line from Atomic Beam Source To IV1 and the rest of the experiment Superfluid Film Control 11

l Detect film (or its absence) to measure required heater power l Measure atomic “beam” transmission to be sure vapor is trapped. Superfluid Film Control Test Film- burner Heater Upper film sensor (dry if FB works) Thermal Link Dilution Refrigerator Mixing Chamber NTD Ge Bolometer LHe, T= 0.3 K Source ROX Injection volume assembly Film-burner Top flange assembly 12

l Detect film (or its absence) to measure required heater power l Measure atomic “beam” transmission to be sure vapor is trapped. Superfluid Film Control Test Injection volume assembly Film-burner Top flange assembly Mixing chamber of Silvera DR (Harvard) Film-burner assembly Injection volume assembly Top flange assembly 13

Transmission at K 14

Transmission at K 15

The InjVol/IV1 Conductance Test l The results:  Slope of each  T vs P curve is thermal resistivity  Extrapolates, for real geometry, to ~0.9 mW at T fridge = 250 mK l But what will the actual heat load be? Stainless outer wall Top flange bolted to MC 19.3 mm OD, 77 µm wall Kapton inner wall Heater bobbin LHe here Silver sinter ~11 cm Bottom flange assembly showing Kapton tube  T vs. Inside Heater Power l The problem:  Plastic injection volume (InjVol) and IV1 must be cooled to 0.3 K.  No metal or sinter allowed on InjVol  What is the maximum power that can be removed through the walls? l The test:  Double-walled volume; LHe thermal link to DR.  Temperature sensors in both volumes  Inner wall of seamless Kapton tubing  Heat inner volume  Measure  T vs heater power 16

Radiation Heat Load Test l Most of the InjVol heat load is from 300 K thermal radiation l Estimate is too uncertain  COMSOL FEA: mW  Ray-trace: 0.42 mW l A test would be prudent:  Simple geometry, an “upper limit” for the beam line. 1.Pull copper plug to 300K. 2.Measure absorber temperature (with radiation). 3.Push copper plug to thermally connect at 4.2K. 4.Adjust absorber heater to obtain the temperature of step 2. l Results  First test at ~15K  0.45 mW for the real geometry.  More analysis of this test is necessary.  Repeat test at lower temperature. ~115 cm Absorber Copper plug Radiation test insert (for standard LHe storage dewar) 17

Purification System l Removes depolarized 3 He from measurement cells; provides isotopically pure 4 He l CCD activities:  Heat-flush test New capacitor ( 3 He density sensor) design to be tested in early 2015  Adjustable Thermal Link (ATL) With greater DR cooling power, may be unnecessary Analysis in progress  Sequestration Volume (SV) Is 3 He dumped with bulk 4 He?  test SV ATLs 18

The Heat-flush Test l The concept:  Measure heat flush on “reasonably large” scale  Compare to theory (Baym, Beck, and Pethick)  Apply theory to the “real experiment” design l The test:  Use osmotic pressure to measure X100 concentration change For natural He, 0.45K, X100 concentration change, ΔP = Torr  Capacitive pressure sensor 0.5” diameter 25  m-thick Kapton diaphragm deflects by 0.57  m With 25  m gap, capacitance changes from to pF (0.77%) Heat-flush test assembly Section view of capacitive pressure sensor Solid electrode (diaphragm not visible on this scale) Superleak (not shown) 19

Dilution Refrigerator l Some characteristics  Magnetic field gradient specs  only non-magnetic materials allowed.  Close coupling with He3S  Hybrid operation as 3 He evaporation fridge  Optimized to run at 85 mW of cooling power (30% reserve) at ~200 mK l Ultimately 2 DRs are needed (one for He3S, one for CDS) l Build first DR for He3S  DR test bed at UIUC “barn” Space for large equipment LHe from UIUC Physics liquefier Helium recovery infrastructure Close to NPL technical support  DR will be critical to He3S component testing during last year of CCD CAD Model of the DR Test Stand setup in the NPL High Bay Area 20

Dilution Refrigerator CCD Activities l DR test-bed, 3 He gas panel, slow control, cryostat, helium supply Dewar and transfer line, He gas recovery, DR “Insert”  Substantial amount of commercial purchasing complete  Cryostat leak checked, fabrication tasks beginning l Low-temperature 3 He circulation components (the still, mixing chamber, heat exchangers, impedances)  Technically challenging  multiple prototypes l Testing The DR test-stand setup begins to take shape in the High Bay Area 21

In the next 3 years… l A working dilution refrigerator meeting the operational and material requirements  Used during last year for He3S component testing l Critical components for the injection and purification systems individually tested at operating temperature  Focus on most uncertain components first  The rest of the parts and assembly-level testing in the post-CCD phase 22

Measuring Neutron Precession using Helium Scintillation Neutron precesses at a slight different frequency than 3 He, ~ 10%. Neutron absorption on 3 He is highly spin dependent. Reaction products of n+ 3 He→p+T generates UV scintillation (80 nm) in LHe. The UV photons are down-converted before detection. Spin dependent n - 3 He absorption reaction measures the difference in precession frequencies between neutron and 3 He. L. Yang, UIUC 23

nEDM Light Collection R&D l Optimize the light collection using simulation given other system constraints on HV, magnetic field, neutron activation, etc. l Demonstrate the efficiency of the photon detection system with a full scale prototype. An early conceptual design of light collection system 24

Full Scale Test Apparatus A full scale prototype was constructed at ORNL to test light collection Detection efficiency of 80 nm scintillation light significantly lower than expected. Collection of UV photons from LED agree with expectation. Suspect that some down- converted blue photons are not trapped in the cell wall. 25

Alternative Detection Scheme Adding wavelength shifting fibers at the outside the cell wall significantly increased the light detection efficiency. Supports the model of reduced optical capture efficiency for blue photons. 26

Light Collection Simulation Light Guide, PMTs WLS fiber, SiPMs UIUC and Miss. State are collaborating on the development of GEANT4 simulation of the light collection. Use the experimental data and simulation to better understand the UV photon down-conversion process and light propagation. In the process of determining unknown parameters. 27

SiPM Testing Silicon photomultipliers (SiPMs) offer better quantum efficiency and distinct P.E. peaks. KETEK evaluation package stopped working at 110 K. UIUC is developing a front end readout package. KETEK SiPM Preamp Box Synergy with nEXO readout electronics R&D (Yang) and sPHENIX EMCal detector R&D (Sickles). 28

Future Light Collection R&D at UIUC Refine the light simulation and optimize WLS fiber readout. –Improve detector energy resolution to reduce background events from beta decay and environmental gammas. –Develop position reconstruction capability with fiber readout, a new handle on background reduction and systematics studies. Develop full scale readout with SiPMs –Low noise front end readout –Mechanical and thermal design for the SiPM system –Upgrade the DAQ to handle a large number of channels. 29

nEDM Summary l In demonstration/construction phase “CCD”  Strategy is still “design-build-test”, repeat as necessary  Build internal (less expensive) components first; beamline, large cryostats, magnetic shielding, infrastructure (more expensive) later l UIUC responsible for 1.He3 services: getting polarized 3 He to measurement cells, removing (de-)polarized 3 He Dilution refrigerator construction Injection volume prototype (film burner, vessel, radiation heat Heat flush test (demonstrate feasibility, compare to Need for postdoc to help manage and execute parallel activities 2.Fiberized light collection development (with ORNL, Miss. State) Synergy with development for nEXO 30