January 2008 RAMP Retreat BEE3 Update Chuck Thacker John Davis Microsoft Research Chen Chang BWRC/BEECube 16 January 2008.

Slides:



Advertisements
Similar presentations
Router Internals CS 4251: Computer Networking II Nick Feamster Spring 2008.
Advertisements

XFEL Meeting, RAL 20 January 2011 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing XFEL 2D Pixel Clock and Control System.
By Sunil G. Kulkarni, SO/F, Pelletron-Linac Facility, BARC-TIFR. 21/01/2011 ASET.
Fast A/D sampler FINAL presentation
Press any key to continue by Marc Ruocco 1 High-Speed Interfaces: FPDP and RACEway RACE, RACEway and RACE++ are trademarks of Mercury Computer Systems,
StreamBlade SOE TM Initial StreamBlade TM Stream Offload Engine (SOE) Single Board Computer SOE-4-PCI Rev 1.2.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
1 RAMP Implementation J. Wawrzynek. 2 RDL supports multiple platforms:  XUP, pure software, BEE2 BEE2 will be the standard RAMP platform for the next.
June 2007 RAMP Tutorial BEE3 Update Chuck Thacker John Davis Microsoft Research 10 June, 2007.
ENGIN112 L38: Programmable Logic December 5, 2003 ENGIN 112 Intro to Electrical and Computer Engineering Lecture 38 Programmable Logic.
Ramp august 2008 retreat Xilinx RAMP donations Kees Vissers Paul Hartke Xilinx Research.
Parallel JPEG2000 Compression System Performed by: Dmitry Sezganov, Vitaly Spector Instructor: Stas Lapchev, Artyom Borzin.
t Popularity of the Internet t Provides universal interconnection between individual groups that use different hardware suited for their needs t Based.
Configurable System-on-Chip: Xilinx EDK
ASPLOS ’08 Ramp Tutorial BEE3 Update Chuck Thacker John Davis Microsoft Research 2 March 2008.
1 Fast Communication for Multi – Core SOPC Technion – Israel Institute of Technology Department of Electrical Engineering High Speed Digital Systems Lab.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
January 2007 RAMP Retreat BEE3 Update Chuck Thacker Technical Fellow Microsoft Research 11 January, 2007.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
1 RAMP Breakout 1 Question 3 What are the standard distribution target machines? In what form should they be distributed? or What kind of infrastructure.
CS 151 Digital Systems Design Lecture 38 Programmable Logic.
Eunil Won Harvard University April 11, 2003 for ZPD FDR 1 ZPD Prototype Tests and DAQ Implementation Introduction Prototype Tests - Electrical Signals.
FPGA-Based Systems Design Flow in Action By: Ramtin Raji Kermani.
General Purpose FIFO on Virtex-6 FPGA ML605 board midterm presentation
© 2011 Xilinx, Inc. All Rights Reserved Intro to System Generator This material exempt per Department of Commerce license exception TSU.
© 2011 Xilinx, Inc. All Rights Reserved This material exempt per Department of Commerce license exception TSU Xilinx Tool Flow.
DDR MEMORY  NEW TCEHNOLOGY  BANDWIDTH  SREVERS, WORKSTATION  NEXT GENERATION OF SDRAM.
General Purpose FIFO on Virtex-6 FPGA ML605 board Students: Oleg Korenev Eugene Reznik Supervisor: Rolf Hilgendorf 1 Semester: spring 2012.
31st July 2008AIDA FEE Report1 AIDA Front end electronics Report July 2008 Progress Virtex5 FPGA choice Milestones for prototype delivery.
® ChipScope ILA TM Xilinx and Agilent Technologies.
RSC Williams MAPLD 2005/BOF-S1 A Linux-based Software Environment for the Reconfigurable Scalable Computing Project John A. Williams 1
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
Power Supply Controller Architecture
SLAAC Hardware Status Brian Schott Provo, UT September 1999.
Engineering & Instrumentation Department, ESDG, Rob Halsall, 24th February 2005CFI/Confidential CFI - Opto DAQ - Status 24th February 2005.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
GBT Interface Card for a Linux Computer Carson Teale 1.
RAMPing Down Chuck Thacker Microsoft Research August 2010.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
Xilinx Programmable Logic Design Solutions Version 2.1i Designing the Industry’s First 2 Million Gate FPGA Drop-In 64 Bit / 66 MHz PCI Design.
집적회로 Spring 2007 Prof. Sang Sik AHN Signal Processing LAB.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
PRESENTED BY OUSSAMA SEKKAT Self-Healing Mixed-Signal Baseband Processor for Cognitive Radios.
Somervill RSC 1 125/MAPLD'05 Reconfigurable Processing Module (RPM) Kevin Somervill 1 Dr. Robert Hodson 1
PROCStar III Performance Charactarization Instructor : Ina Rivkin Performed by: Idan Steinberg Evgeni Riaboy Semestrial Project Winter 2010.
FPGAs for Temperature-Aware Microarchitecture Research Siva Velusamy, Wei Huang, John Lach, Mircea Stan and Kevin Skadron University of Virginia.
PRESENTED BY, SARANYA , GAYATHRI, II ECE-B.
Microelectronic Systems Institute Leandro Soares Indrusiak Manfred Glesner Ricardo Reis Lookup-based Remote Laboratory for FPGA Digital Design Prototyping.
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 3 – The Motherboard.
A Reconfigurable Accelerator Card for High Performance Computing Michael Aitken Supervisor: Prof M. Inggs Co-Supervisor: Dr A. Langman.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
BEE3 Updates June 13 th, 2007 Chuck Thacker, John Davis Microsoft Research Chen Chang UC Berkeley.
Spring 2007 W. Rhett Davis with minor editing by J. Dean Brock UNCA ECE Slide 1 ECE 406 – Design of Complex Digital Systems Lecture 1: Introduction.
4/19/20021 TCPSplitter: A Reconfigurable Hardware Based TCP Flow Monitor David V. Schuehler.
PROGRESS ON ENERGY SUM ELECTRONIC BOARD. VXS Backplane Energy Sum 18 fADC VME64 High Speed Serial VME64 16 CH Detector Signals Crate Sum to Trigger Energy.
This material exempt per Department of Commerce license exception TSU Xilinx On-Chip Debug.
Somervill RSC 1 125/MAPLD'05 Reconfigurable Processing Module (RPM) Kevin Somervill 1 Dr. Robert Hodson 1
Bob Hirosky L2  eta Review 26-APR-01 L2  eta Introduction L2  etas – a stable source of processing power for DØ Level2 Goals: Commercial (replaceable)
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
BARC-IIFC collaboration meet RF Solid-state Power Amplifiers at 325 MHz RFSS, TPD, BARC.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
Ewald Effinger, Bernd Dehning
LFD Correlator MWA-LFD Kick-off Meeting San Diego 5-June-2006
ASP/H – CRM Interface John DeHart Applied Research Laboratory Computer Science and Engineering Department
Ruggedized Camera Encoder
FEE Electronics progress
Presentation transcript:

January 2008 RAMP Retreat BEE3 Update Chuck Thacker John Davis Microsoft Research Chen Chang BWRC/BEECube 16 January 2008

January 2008 RAMP Retreat Outline BEE3 board properties BEE3 gateware BEE3 schedule

January 2008 RAMP Retreat Lab

January 2008 RAMP Retreat John explains a tricky point to Chuck

January 2008 RAMP Retreat BEE3

January 2008 RAMP Retreat BEE3

January 2008 RAMP Retreat Bandwidths (per-FPGA) Memory –400 MT/s * 9B/T * 2 channels: 7.2 GB/s Ring –500 MT/s * 9 B/T * 2 channels: 9.0 GB/s QSH –400 MT/s * 10 B/T: 4 GB/s Ethernet –125 MB/s CX4 –1.25 GB/s * 2 directions * 2 channels: 5GB/s PCI Express –Same as CX4

January 2008 RAMP Retreat Initial Gateware Mostly things required for production testing and board characterization: Signal connectivity checks –Some are AC coupled, must test at speed –QSH tested with a crossover card Temperature and power supply monitoring DDR-2 Controller –Useful in other designs CX4 and PCI Express for at-speed tests Xilinx and others have lots of IP (alas, it either doesnt work very well, or is proprietary).

January 2008 RAMP Retreat Project Participants and Roles Microsoft Research (Silicon Valley) –Funds, manages system engineering, does some gateware Celestica (Ottawa and Shanghai) –Did main board engineering, prototype fabrication –Microsoft has a very deep relationship with Celestica BEECube –Builds and delivers functioning systems Function Engineering (Palo Alto) –Did thermal and mechanical engineering Xilinx (San Jose) –Provides FPGAs for academic machines –Provides FPGA application expertise Ramp Group (BWRC) –Control board, basic software Ramp Community –Uses the systems for research –Expanding to industrial users (e.g., us)

January 2008 RAMP Retreat Bring-up Status Most subsystems work: –Brought up a MicroBlaze on day 3 of bring-up –Ring wiring –10 Gbit channels Works, but requires respin to relocate MGTs –GB Ethernet –PCI Express

January 2008 RAMP Retreat Bring-up Status (2) DDR2 controller doesnt work (yet) –Largest piece of new IP –Works flawlessly in post-route simulation –Timing complete at 200 MHz. Problems: –Design is complex Six Verilog modules, including a 36-bit RISC Design turnaround is ½ hour (i.e., tools suck). Simulator is slow –Board testing uses ChipScope Which doesnt replace a scope Very difficult to probe

January 2008 RAMP Retreat Schedule Generate Specification – Done Schematic Entry – Done Board Layout – Done Thermal modeling, heat sink design – Done Chassis design -- Done Signal Integrity – Done Board Qualification – In progress Board Respin -- TBD Prototypes: Spring Production: Start Summer 08