Progress Report – Week 9 Section AC, Group 2 Presented by Andrew Amodei Teammates: David Bergsman, Michael Huang, Elizabeth Lam May 24 th, 2012.

Slides:



Advertisements
Similar presentations
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Advertisements

MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Planning Production Activity Preview Planning Manufacturing Facilities Quantitative Tools in Production Planning Production Planning and Control Flexible.
Heat Recovery for Commercial Buildings

1 Direct Reduction Iron Plant Group Golf Selimos, Blake A. Arrington, Deisy C. Sink, Brandon Ciarlette, Dominic F. (Scribe) Advisor : Orest Romaniuk.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
CM4120 Chemical Plant Operations Lab Safety Program PAWS program will provide structure for safety program  entire class is responsible for safe environment.
Kathryn Knopinski Kara Shelden Kim Fink Justin Sneed Mark Shreve
Raccoon Mountain Team Hydrogen Production Proposal
For Products and Services
PROJECT AND STUDY DRAWINGS & DIAGRAMS
Butch G. Bataller Lecture on ChE 192
Session Pooja patnaik.
CHAPTER 3 COST CONTROL What is revenue? (147) The income from sales before expenses.
Technologies and equipment for animal husbandry ISO 9001:2008.
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
SchedulingProducingControllingSchedulingProducingControlling.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Cyclohexane Production Unit
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Crimson Consulting Cyclohexane Production Facility Analysis and Design.
Profitability Analysis Our client is evaluating a number of scenarios How does our process compare with the others?
VisiMix Pipe Line VisiMix Ltd, PO Box 45170, Jerusalem, 91450, Israel Tel: Fax:
PRODUCTION OF HIGHLY PURIFIED BOVINE TRANSFERRIN Group 5B Arjun Goel, Connie Marcelli, Lianne Kark, Sara Dang, Vivien Tai Faculty Advisor Prof C.A. Mims.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
FE Exam Preparation Design
Simulation Of Bioprocess ERT 315
MATERI XI PRODUKSI & OPERASIONAL. 5 ISSUES That arise when trying to produce a product or service Capacity (How much can I produce) Scheduling (How am.
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Flow Rate and Capacity Analysis
Plant flexibility Market factors – Flexibility to produce alternative products – Produce multiple products simultaneously Societal trends – Utilization.
Team Yellow. Experiment 3 IRI Economics FCI and Annual Costs FCI is $4.63 million Annual product cost is $104 million Annual cash flow is -$77 million.
SchedulingProducingControllingSchedulingProducingControlling.
PIPE LINE SYSTEM Series Pipe Line System Class I Class II Class III
Recycling Packaging Materials The KnapZak System Your Plastic and Styrofoam Waste Collection System.
"Using Simulation with Scheduling Visualization to evaluate Change Initiatives in a Bio-Pharma Environment”
Business Policy & Strategy: Chapter Nine Production Murdick, Moor, Babson & Tomlinson Sixth Edition, 2000.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
ERT 213 PROCESS INSTRUMENTATION BY: ZULKARNAIN MOHAMED IDRIS
Capacity Planning Pertemuan 04
Nanofluidic Characterization David Sharp David West Justin Davis.
Fermentation Technology
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
04/06/2010 Production of Dimethyl Sulfoxide from Lignin Team Bravo is: Stan Das, Jeff Umbach, Russ Boyer, Krista Sutton, Mike Czepizak Project Lead: Jake.
无锡凯夫制药有限公司 Wuxi Kaifu Pharmaceutical Co., Ltd. 无锡风光 Beautiful Wuxi 厂区环境 Plant view 办公场所 Offices 设施设备 Facilities & Equipment 证书 Certificates.
Kraft Summer Intern 2015 Jacob Herbstritt.
WP 2 – Valorisation of Sludge
Biotechnology Plant Design:
Manufacturing Simulation Case Studies
Che 451 chemical engineering design PIPELINE DESIGN
Advisor: Dr. Shangchao Lin
Process Economics Factors that affect profitability
How to Select and Optimize Abrasive Blasting Equipment
Author: Nurul Azyyati Sabri
Strategic Capacity Management
Principles of Operations Management
ANSI/ASHRAE 52.2 A destructive test to measure minimum efficiency reporting value (MERV) Efficiency test aerosol is Potassium Chloride (KCl) particles,
With assistance from Deidra Garyk
AIChE Contest Organization
Production of Sesame Oil
Production of Sesame Oil
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Manufacturing Production Planning
Batch Production of Monoclonal Antibodies
Terry A. Ring Chemical Engineering University of Utah
U.S. Citizens Affected by Macular Degeneration
AICHE Contest Week 3 Last Lecture
Presentation transcript:

Progress Report – Week 9 Section AC, Group 2 Presented by Andrew Amodei Teammates: David Bergsman, Michael Huang, Elizabeth Lam May 24 th, 2012

Goals of the Week Finish individual design projects – Water for injection system – Facility layout – Downstream columns – Equipment and labor scheduling Finish debugging spreadsheet FEMA analysis Update stream tables and PFD Complete and submit Phase II report

Gantt Chart

Team progress Finished debugging spreadsheet Updated stream tables Updated PFD Finalizing individual design projects Finalizing FEMA analysis

Facility layout Color-coded rooms Clean steam, WFI, air, O 2, CO 2 lines Waste lines and neutralization tanks Additional holding tanks Personnel support space Sized raw material and product warehouse Added personnel and material flow arrows

Facility layout

Chromatography columns Finalized chromatography column parameters Determined pump, pipe, and valve requirements Chromatography column results CriteriaProtein AIEXHIC ResinMabSelectSepharose FF Phenyl Sepharose6 FF (high sub) Number222 Diameter [cm] Flow Rate [cm/hr] 100 Average Process Time [hr] Pump and pipe specifications PumpPipe Type Positive Displacement Material Stainless Steel Power [hp]1Diameter [cm]13 Capacity [L/min] 45.42Unit Cost [$/1.5m]100 Unit Price [$] 8,500 Pipeline Distance [m] 769 Number14Number of Valves53

Scheduling Optimization of scheduling complete Results: Optimized scheduling details CriteriaValueComment Number of seed train rooms 2 Increases flexibility/reduced operating time Downstream lot size31,000 L Upstream train number 6 Labor scheduling PositionNumber of personnel Seed train room2per room Bioreactor room2per room Media production2 Downstream process2per downstream process Mixing buffer solution2 Autoclave operation2 WFI system2 Shift mananager Seed train1 Bioreactor1 Primary recovery1 Chromatography/TFF1

Water for injection Compiled equipment inventory Calculated equipment and operating costs Added and sized holding tanks Determined pump types and number Sized and priced deionization unit Equipment type and cost EquipmentTypeNumberCost [$] Clean steam generatorSteris 450-T Deionization unitSiemens FlexTrex Holding tanksStainless steel PumpsPeristaltic Hose Vapor compression unitStilmas 4700-T Total:

Water for injection

Major results Process design and optimization completed Individual and Phase II reports nearing completion Economic analysis over 30 year plant life: Economic analysis ParameterBasecaseDisposable Fixed Capital Investment [billion $] Total Operating Costs [billion $] NPV [billion $] 158 EACF [billion $] 8.0 Future Worth of Profit [billion $] 383

Future goals Redesign facility layout for optimized case Separate number of seed trains from number of bioreactors. Set up seed train to handle arbitrary volume / cell sizes. Prepare for presentation Rest

Questions?

Team Questions Any other economic factors to consider aside from HVAC costs? Does my ethics report grade affect my team’s overall score?