Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/2015 1 The majority roads are public facilities built with tax money to serve the.

Slides:



Advertisements
Similar presentations
B/C Ratio Engr. Faisal-ur-Rehman CED N-W.F.P UET P.
Advertisements

Some Practice Questions in Engineering Economics
MER439- Design of Thermal Fluid Systems Engineering Economics Lecture 2- Using Factors Professor Anderson Spring 2012.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
Engineering Economy Practice Problems
Cost Estimation for Engineering Projects CIVE 4312 Hanadi Rifai.
Time Value Ch. 9.
Interest and Equivalence L. K. Gaafar. Interest and Equivalence Example: You borrowed $5,000 from a bank and you have to pay it back in 5 years. There.
Engineering Economics I
Exam 4 Practice Problems Douglas Rittmann, Ph.D., P.E.
TIME VALUE OF MONEY Prepared by Lucky Yona.
Engineering Economics Outline Overview
ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport, CT
Heating and Air Conditioning I Principles of Heating, Ventilating and Air Conditioning R.H. Howell, H.J. Sauer, and W.J. Coad ASHRAE, 2005 basic textbook/reference.
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
1 What is Engineering Economics?. 2  Subset of General Economics  Different from general economics situations - project driven  Analysis performed.
Life Cycle Cost Analysis
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Interest Formulas – Equal Payment Series
Physical Capital - Tangible goods purchased by the household that are used up over time. Such durable goods may serve as an investment or means of storing.
Economics of Power Generation Lecture 6. “”The art of determining the per unit (i.e., one kWh) cost of production of electrical energy is known as economics.
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
©The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin Chapter Ten Planning for Capital Investments.
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Summer Time Value of Money Session 2 07/02/2015.
Cost Estimating for Engineers Taxes & Cash Flow. Taxable Income + Gross Income - Depreciation Allowance - Interest on Borrowed Money - Other Tax Exemptions.
Copyright ©2004 Pearson Education, Inc. All rights reserved. Chapter 3 Applying Time Value Concepts.
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
CDAE Class 06 Sept. 14 Last class: Result of class exercise 1 2. Review of economic and business concepts Problem set 1 Quiz 1 Today: Result of Quiz.
ECE 7800: Renewable Energy Systems Topic 12: Economic Analysis of Renewable Energy Systems Spring 2010 © Pritpal Singh, 2010.
Engineering Economy Why is Engineering Economy important? Practical everyday questions –Should you finance your car or pay cash? Finance for $6995 –vs-
Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples.
Engineering Orientation Engineering Economics. Value and Interest The value of a dollar given to you today is of greater value than that of a dollar given.
Introduction to Economic Analysis Part 1 February 10, 2014.
Multiple/Continuous Compounding. Understand Effective Interest Rates Figure out how to use Inflation/Deflation in your decisions.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
CDAE Class 07 Sept. 18 Last class: Result of Quiz 1 2. Review of economic and business concepts Today: 2. Review of economic and business concepts.
Encouraging Transportation Investment Saginaw County Chamber of Commerce Percolator Breakfast May 2, 2013 Horizons Conference Center Rich Studley, President.
TM 661 Engineering Economics for Managers Unit 2 Multiple/Continuous Compounding.
First step is to identify cash flows as either benefits, disbenefits, or costs Benefits(B)--Advantages to the people Disbenefts--Disadvantages to the people.
Chapter 6 Investment Decision Rules
Why do engineers care about finance?  Projects often require an investment of money up front.  Often receive money back in later years after project.
Mer439 - Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Anderson Spring Term 2012.
TIME VALUE OF MONEY A dollar on hand today is worth more than a dollar to be received in the future because the dollar on hand today can be invested to.
Evaluating a Single Project
Maintenance & Rehabilitation Strategies Lecture 5.
Chapter 8 Long-Term (Capital Investment) Decisions.
1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT.
Capital, Investment, and DepreciationCapitalInvestment and DepreciationThe Capital MarketCapital Income: Interest and ProfitsFinancial Markets in ActionCapital.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
MER Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Bruno Winter Term 2005.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
Reporting and Interpreting Liabilities Chapter 9 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc.
Engineering Your Future Engineering Economics Economics Value and Interest The value of a dollar given to you today is of greater value than that.
©2006 Dr. Howard Godfrey – Extra File for Chapter 11 1 Chapter 11- B Extra PowerPoint Slides This file contains explanations of compound interest computations.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Equivalence Lecture No.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
LECTURE 6 Quiz #6 If you are going to finance the purchase of a car, would you want the interest on your loan be compounded daily, monthly, quarterly,
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
Accounting for Time In addition to computing all benefits and costs in money terms,… The monetary costs and benefits must be calculated at a single point.
1 Hypothetical Situation... Suppose you win the Publisher’s Clearinghouse Sweepstakes and are given a choice of taking $10,000 today or $12,000 three years.
Chapter 18 Financial Mathematics. Learning Objectives Explain why a dollar today is worth more than a dollar in the future. Define future value and present.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Interest Formulas – Equal Payment Series
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 7 Present Worth Analysis
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Presentation transcript:

Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the public. Economic analysis can form the basis upon which the pavement engineer can make his/her final judgment. User cost must be consider along with agency economic limitations and availability of resources.

Pavement Cost Agency Cost : Initial or Capital Cost Maintenance Cost Routine Major Rehabilitation Cost Liability Cost Road User Cost : Taxes and Fees Running Cost Vehicle Fuel Added User Cost Delay (Time is money) Fuel Accidents

Pavement Benefits VS Cost A.Positive (Benefits) In-coming 1. Salvage values of capital investment 2. User time 3. Saved vehicle costs 4. Saved accident costs? a. monetary value of property damage is traditionally estimated b. monetary value of lives lost and sometimes injuries is problematic

Pavement Benefits VS Cost B.Negative (Costs) Out-Going 1. Capital 2. Maintenance and Rehabilitation 3. Liability

Economic Analysis A. Compound Amount Factor (CAF): How much will X be worth after n at i per period CAF = (1 + i) n example: How much 300 million Dollars will equal after 10 years at 2%/yr compounded annually x = current value, and y = future value x = $300 M n = 10 years Solution: Y = 300 (1 +.02) 10 = 300 (1.22) = $365.7M

Economic Analysis B. Present Worth Factor (PWF): How much will X at i per period after n periods be worth today? PWF = example: salvage value of the pavement will be $100,000 at end of 12 year service life, interest or discount rate = 6% Present value = Y = = ( ) * = $

Economic Analysis C.Series Present Worth Factor (SPWF): What is X per period for n periods at i rate per period worth today? Example: The Ministry of Public Works & Housing is planning an annual maintenance strategy for Amman-Zarka Expressway equal JD1 million per year each of the next ten years. Assuming a 6% interest rate, how much will these payments equal as of today ? Answer: SPWF(6%,10 periods) = Present worth = Y = *JD1 million = JD7.36 million

Economic Analysis D.Capital Recovery Factor (CRF): What Y/period for n periods at i rate per period will equal X today? Example: Suppose i =6% compounded annually The Greater Amman Municipality is borrowing JD7.36 million in 2013 for new pavement overlays. How much money must it pay annually over the next 10 years to retire the debt? Answer: CRF (6%, 10 periods) = Annual payment = Y = (0.1359) * $7.36 million = $1 million

Economic Analysis Example: As a Pavement Engineer, you are hired by the Greater Amman Municipality to choose the most economical pavement alternatives shown in the table below. Suppose i =5% compounded annually, and the Salvage value at the end of pavement life is 30% of the first capital (initial) cost. Additionally, an annual routine maintenance will be conducted through the first 10 years of the pavement life for both alternatives at JD0.1/ m 2

Economic Analysis Alternative No.1 (20 years life) Alternative No. 2 (20 years life) Surface: 15 JD20/m 2 Surface: 10 JD14/m 2 Base: 25 JD5/m 2 Subbase: 40 JD3/m 2 10 years with JD2/m 2 Overlay, 5 10 years with JD20/m 2

Economic Analysis (Solution:) Computing the present value of the alternatives: JD6.6 JD22 JD0.1/yr JD20 n=20yr n=10yr n=0yr n=0 JD28 JD0.1/yr JD8.4 JD2 n=20yr n=10 Alt. No.1 Alt. No

Economic Analysis (Solution:) Alternative 1 Initial Cost = (20+5+3) = JD28/ m 2 Present Value = JD28 + JD0.1(SPWF,5%, 10 yr) + JD2(PWF,5%,10yr) – JD(28*0.3) (PWF,5%,20 yr) Present Value = JD28 + JD0.1(7.722) + JD2(0.614) –JD8.4(0.377) = JD /m 2 BETTER Alt Alternative 2 Initial Cost = (14+5+3) = JD22/ m 2 Present Value = JD22 + JD0.1(SPWF,5%, 10 yr) + JD20(PWF,5%,10yr) – JD(22*0.3) (PWF,5%,20 yr) Present Value = JD22 + JD0.1(7.722) + JD20(0.614) –JD6.6(0.377) = JD /m 2