Introduction to PBN Seminar ICAO PBN Implementation 1.

Slides:



Advertisements
Similar presentations
Regional RAIM Prediction System – Progress Report
Advertisements

1 Summary of day 4 Performance Based Navigation The symposium fully supports the PBN concept. It acknowledges that it addresses the States current and.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Erwin Lassooij PBN Programme Manager 30 January 2014
PBN ICAO HQ Activities Overview
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN.
Performance based navigation: The ICAO PBN programme
The Way Forward for ICAO Nancy Graham Director, Air Navigation Bureau, ICAO Gdansk International Air & Space Law Conference – Poland in International Civil.
PBN Plan Development Aviation Industry Forum 18 November 2009.
International Civil Aviation Organization Performance Framework for Efficiency H. Sudarshan SIP/ASBU/2012 -WP/5 Workshop on preparations for ANConf/12.
ICAO Provisions for Safety Management
APAC PBN Seminar F.LECAT (ICAO)
APAC PBN Seminar, Bangkok, 8-10 June 2015 The Business Aviation Perspective presented by Captain Gabriel Thomas Boyda / MJETS* representing the International.
Area Nav: RNP Evolution
PBN IMPLEMENTATION IN THE SAM REGION
ATM Implementation Support by ICAO APAC RSO
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Performance Based Navigation
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
CANSO PBN Support Phil Rakena CANSO PBN SG co-Chair Regional PBN Champion [Airways New Zealand]
International Civil Aviation Organization GNSS SURVEY OUTCOME Secretariat ICAO APAC Office GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
Requirements - background
From RNP Divergence to Performance Based Navigation Convergence
International Civil Aviation Organization European and North Atlantic Office SAFETY MANAGEMENT The ICAO perspective Michel Béland ICAO Regional Safety.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, March Performance Based Navigation The Future Erwin Lassooij Manager.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
1 Dave VanNess Implementation and Resource Development Coordinator Performance Based Navigation Programme ICAO, Montreal Dave VanNess Implementation and.
1 Presented by Erwin Lassooij Presented by Erwin Lassooij The Future on RNAV and RNP NAM/CAR/SAM Regional Seminar on RNAV and RNP Implementation Mexico.
APAC PBN Seminar F.LECAT (ICAO)
Overview of the PBN Airspace Implementation Processes
Performance-Based Communication and Surveillance (PBCS)
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
ATM Implementation Support by ICAO APAC RSO
Performance Based Navigation The Future
Erwin Lassooij PBN Programme Manager 30 January 2014
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Presented by United Arab Emirates
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Global Air Navigation System ~ Planning Mechanisms ~
PBN Performance Based Navigation
SIP/2012/ASBU/Nairobi-WP/7
Performance Based Navigation: Navigation Specifications
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Regional RAIM Prediction System – Progress Report
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Workshop on preparations for ANConf/12 − ASBU methodology
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Session – 4: Existing ICAO Standards relating to Air Traffic Control
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Evaluation in the GEF and Training Module on Terminal Evaluations
AIM Global Strategy Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
Performance Based Navigation –Civil Aviation Authority Actions
PBN ICAO HQ Activities Overview
Presentation transcript:

Introduction to PBN Seminar ICAO PBN Implementation 1

Introduction to PBN Seminar ICAO PBN Implementation 2 Presentation Overview PBN – Goals PBN – Roles PBN – Plans PBN – Tools

Introduction to PBN Seminar ICAO PBN Implementation 3 GOO 5 : Optimized Airspace and Route Structures CO2 Emissions ? Demand vs. Capacity Cost ? Airspace Organization and Management Anx 6 Anx 11 PANS ATM GM ANP PCO/ PIRG Setting The Framework Implementation of a Global ATM System AFICAR/SAMASIA/PAC PBN RNP-4 North South RNAV 5 route structure in enroute airspace APV approachesRNP SIDs/STARs TCB Implementation Projects Global Operational Outcomes and KPI Programme Project by Region Accountability Section / Unit Chiefs Directors, RDs and Chief of Offices Section / Unit Chiefs RDs, TOs and ROs

Introduction to PBN Seminar ICAO PBN Implementation 4 Why Implement PBN? At a global level, To reduce controlled flight into terrain (CFIT) To increase efficiency To increase capacity To increase aerodrome access To address environmental issues

Introduction to PBN Seminar ICAO PBN Implementation 5 ICAO implementation goals States and/or regions develop an implementation plan by 2009 to achieve the following goals –where RNAV operations are required, enroute (oceanic and continental) and terminal ATS routes should be implemented according to PBN by 2016, and –all instrument runway ends should have an approach procedure with vertical guidance (APV), either as the primary approach or as a back-up for precision approaches by 2016

Introduction to PBN Seminar ICAO PBN Implementation 6 PBN implementation goals Enroute airspace (where RNAV ops required) Area of operation: Oceanic and remote airspace –Applicable navigation specifications: RNAV 10 and RNP 4 –Implementation strategy: 100% implementation by 2010 Area of operation: Enroute continental –Applicable navigation specifications: RNAV 5, 2, and 1 –Implementation strategy: 70% by 2010, 100% by 2014 Area of operation: Oceanic and remote airspace –Applicable navigation specifications: RNAV 10 and RNP 4 –Implementation strategy: 100% implementation by 2010 Area of operation: Enroute continental –Applicable navigation specifications: RNAV 5, 2, and 1 –Implementation strategy: 70% by 2010, 100% by 2014

Introduction to PBN Seminar ICAO PBN Implementation 7 PBN Implementation Goals Terminal airspace (where RNAV ops required) Area of operation: Terminal area –Applicable navigation specifications: RNAV 1, 2 and Basic-RNP 1 –Implementation strategy: 30% by 2010, 60% by 2014, 100% by 2016

Introduction to PBN Seminar ICAO PBN Implementation 8 PBN implementation goals Approach Area of operation: Approach (RNP) Applicable navigation specifications: –RNP APCH –RNP AR APCH (if normal straight-in approach is operationally not feasible) Implementation strategy: –All instrument runways:  APV to all runway ends by 2016  NPA where APV is operationally not possible

Introduction to PBN Seminar ICAO PBN Implementation 9 Implementation ICAO Leadership role Familiarization –States, Stakeholders, ICAO Implementation –Planning assistance –Execution assistance –Verification Development and maintenance of ICAO provisions

Introduction to PBN Seminar ICAO PBN Implementation 10 Implementation Role: ICAO Headquarters Organize seminars Website for info/FAQ on PBN ( Assist in PIRGs with setting PBN goals and developing regional PBN implementation plans “PBN Roadmaps” Coordinate and assist in PBN implementation planning and execution –(sub) Regions –States and other stakeholders Identify and address follow-on training needs and other potential obstacles to implementation

Introduction to PBN Seminar ICAO PBN Implementation 11 APANPIRG/18 Recommendations Conclusion 18/52 – Establishment of a Regional Performance Based Navigation Task Force (PBN/TF) Conclusion 18/53 – Development of State PBN Implementation Plans Conclusion 18/54 – Globally Harmonized SARPS and Guidance Material for PBN Conclusion 18/55 – Designation of Contact Person for PBN Implementation

Introduction to PBN Seminar ICAO PBN Implementation 12 Implementation Role: Regional Office Assist in organizing seminars Provide focal points for PBN at the RO Monitor implementation progress in the Region Coordinate development of Regional PBN implementation plan “PBN Roadmap” Manage regional PBN Task Force Coordinate implementation planning and execution for PBN enroute operations 1st level of assistance in Region for PBN implementation planning and execution for terminal and approach operations

Introduction to PBN Seminar ICAO PBN Implementation 13 Implementation Role: States Participate in development of Regional PBN implementation plan “PBN Roadmap” Develop State PBN implementation plan by the end of 2009 Provide focal point for PBN implementation Involve other stakeholders in PBN implementation Identify issues or “Showstoppers” that could delay implementation, and relay to ICAO WGS 84 is a “Showstopper” if not done

Introduction to PBN Seminar ICAO PBN Implementation 14 State PBN Implementation Plan This guidance to stakeholders should: Address the planned evolution of navigation, as one of the key systems supporting air traffic management, Describe the RNAV and RNP navigation applications that should be implemented in at least the short and medium term, in the State

Introduction to PBN Seminar ICAO PBN Implementation 15 State PBN Implementation Plan Why is the PBN Implementation Plan or Roadmap needed? To implement the regional PBN plans at the State level and address PBN implementation strategy at the national level To provide proper guidance and direction to the domestic air navigation service provider(s), airspace operators and users, regulating agency, as well as foreign operators who operate or plan to operate in the State –Assist the main stakeholders plan a gradual transition to the RNAV and RNP concepts –Assist the stakeholders in planning their investment strategies during the future transition

Introduction to PBN Seminar ICAO PBN Implementation 16 Implementation Role: Stakeholders Cooperate with States in their planning and implementation Commit the resources necessary to carry out their part of the strategy for regional and State implementation

Introduction to PBN Seminar ICAO PBN Implementation 17 Familiarization Tools: Web Based Training

Introduction to PBN Seminar ICAO PBN Implementation 18 Familiarization Tools: “Introduction to PBN” Seminars Bangkok September 2007 Montreal June 2007 New Delhi September 2007 Santo Domingo June 2008 Lima June 2008 Baku April 2008 Cairo November 2007 Abuja January 2008 Nairobi January 2008 Brussels April 2008

Introduction to PBN Seminar ICAO PBN Implementation 19 Implementation: Tools Final draft of PBN manual is finalized and posted on ICAO-NET State Letter with Navigation Specifications is on ICAO-NET –AN 11/45-07/22, 27 April 2007 State Letter with flight plan provisions –AN 11/ /35, 25 May 2007 State Letter with PBN terminology changes to Annexes 2, 3, 4, 6, 10, 11 and 15 –AN 11/45-07/52, 20 July 2007

Introduction to PBN Seminar ICAO PBN Implementation 20 Implementation: Tools ICAO RNP AR Procedure Design Manual (Draft) to be available by October 2007 ICAO Quality Assurance Manual for Flight Procedure Design- consists of four volumes (3 to be ready in draft form in October 2007: –Volume 1 – Flight Procedure Design Quality Assurance System; –Volume 2 – Flight Procedure Designer Training; –Volume 3 – Flight Procedure Design Software Validation; State implementation plan template Implementation checklist

Introduction to PBN Seminar ICAO PBN Implementation 21 Implementation: Tools For possible future development: Specialized training for Controllers, Regulators, Procedure Designers Flight Operational Safety Assessment (FOSA) guidance Model regulations and operational approval documents Helicopter-specific PBN nav spec provisions RNP 2 Nav spec for enroute, advanced RNP 1 for terminal, advanced RNP APCH

Introduction to PBN Seminar ICAO PBN Implementation 22 Summary ICAO must assume leadership role in implementation Commitment and active involvement required from States and other stakeholders State PBN implementation plans to be complete by end of 2009 The benefits of PBN only come with implementation