Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
Louisiana Safe Routes To School Program
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Transportation Research Board October 20, City of Seattle Department of Transportation City of Seattle Challenging topography.
U.S. 33 Northern Connector Alternative
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Engineers and Planners responded with…  Traffic Calming  Context Sensitive Design.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
How Walkable and Bike-able Is UCLA ? Multi-Modal Level Of Service Analysis in the UCLA Campus HYERAN LEE CLASS OF 2014 MASTER OF URBAN AND REGIONAL PLANNING.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Design of Open Channels and Culverts
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
What Makes a Roadway Safe? ISLAND COUNTY PUBLIC WORKS DEPARTMENT Press key to advance this display.
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Civil Engineering About 8 Different Subsets 1. Structures
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
I-69 Team 3. Introduction History of project Proposed Route Challenges.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Trail Funding Sources & General Information
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
What does PWD do for our City?. Administrative Services Engineering Operations.
Alkali Creek Road Slope Stabilization and Stream Relocation The project scope changed after major rainfall caused slope failure jeopardizing safety and.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.
Highways and Airports Engineering Project Lecture 2 Highway Signs and Markings Cairo University Faculty of Engineering Public Works Department Dr. Dalia.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
Signs Signals and Pavement Markings
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
Highway and Road Projects: When to Treat Runoff William Fletcher Water Resources Program Coordinator Geo/Environmental Section ODOT.
Transportation Engineering Business Development Workshop Department M
The I-465 West Leg Reconstruction Project
Project Management Team Meeting #3
Interdisciplinary teams Existing or new roadway
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Rehabilitation Project WIN
Presentation transcript:

Response to RFP Dated March 9, 1999 Rhode Island DOT Project Reconstruction of Route 138 From Route 2 to Route 108

Personnel Profile – Mike King Manager: Administrative Manager: Administrative Planner: Organizational Planner: Organizational Web Page Administrator Web Page Administrator HTML HTML JScript JScript Management Experience Management Experience CADD Manager CADD Manager Standards development Standards development

Design Team Jeff Ley – Transportation, Paul Schofield – Geotech, Ron Hardy – Environmental Andrew Prezioso – Structures, Katherine Manchester – Hydraulics, Mike King - Planner

Project Goals Facilitate Roadway Sharing Pedestrians Bicycles Enhance Traffic Flow Improve Safety

Project Theme: Awareness Historic Districts Historic Districts Flow Gauging Station Flow Gauging Station Current flow Current flow Historic extreme flows Historic extreme flows Marked flood lines Marked flood lines Landmarks Landmarks University Entrances University Entrances Dynamic Signs (ITS) Dynamic Signs (ITS)

Challenge Coordinate the growing progressive needs of the University and new housing developments with the historic desires of residents

Personnel Profile – Katherine Manchester Assistant manager Assistant manager Hydraulics engineer Hydraulics engineer URI Cooperative Extension Water Quality Program URI Cooperative Extension Water Quality Program RIDOT Internship RIDOT Internship Undergraduate research assistant Undergraduate research assistant

Presentation Overview Bottom Up Approach Bottom Up Approach Geotechnics: Foundation of project Geotechnics: Foundation of project Structural: Supporting bodies Structural: Supporting bodies Transportation: Roadway Transportation: Roadway Environmental: Water quality Environmental: Water quality Hydraulics: Runoff / precipitation management Hydraulics: Runoff / precipitation management

Personnel Profile – Paul Schofield Geotechnical Engineer Geotechnical Engineer RIDOT Internship RIDOT Internship Geotechnical Engineering coursework Geotechnical Engineering coursework National Society of Collegiate Scholars National Society of Collegiate Scholars

Soil Analysis Borings Type of Soil Bearing Capacity Drainage Adequacy

Foundation Options Shallow Foundations Shallow Foundations Rectangular Footings Rectangular Footings Cantilever Footings Cantilever Footings Floating Foundation Floating Foundation Deep Foundations Deep Foundations Piles Piles Drilled Piers Drilled Piers

Retaining Walls Riverbanks Embankments Types Gravity Cantilever Backfill

Geosynthetics Erosion Control Erosion Control Soil Reinforcement Soil Reinforcement Drainage Control Drainage Control Suitable Types Suitable Types

Personnel Profile – Andrew Prezioso Structural Engineer Structural Engineer RIDOT Internship RIDOT Internship Site Engineering, Inc. Site Engineering, Inc. Structures Coursework Structures Coursework Structural Analysis Structural Analysis Foundation Engineering Foundation Engineering Analysis of Steel Structures Analysis of Steel Structures Concrete Design Concrete Design Future Plans: Grad School Future Plans: Grad School

Structural Objectives Minor Objective: Minor Objective: Widening of the following culverts Widening of the following culverts White Horn Brook White Horn Brook Chipuxet River Chipuxet River Chickasheen Brook Chickasheen Brook Reconstruction of Kingstown Station Railroad Bridge Reconstruction of Kingstown Station Railroad Bridge Insert Picture of kingstown RR bridge.

Structural Objectives (Cont.) Primary Objective Primary Objective Freestanding pedestrian/bike bridge crossing Amtrak Freestanding pedestrian/bike bridge crossing Amtrak Emergency vehicle capability Emergency vehicle capability Safe bicycling environment Safe bicycling environment Low maintenance costs Low maintenance costs

Location Parallel with the current Kingstown Railroad Bridge. Parallel with the current Kingstown Railroad Bridge. Northeast Northeast Southwest Southwest pictures

Bridge Alternatives Steel Wood Wood Steel/Wood Steel/Wood

Bridge Alternatives (Cont.) Cast-in-Place Concrete Cast-in-Place Concrete Pre-stressed Concrete Pre-stressed Concrete

Design Considerations Span Span 2 Span or 3 Span 2 Span or 3 Span Width Width Possible Link to South County Bike Path (Ongoing Study VHB/RIDOT) Possible Link to South County Bike Path (Ongoing Study VHB/RIDOT) Possible link to West Kingston Park. Possible link to West Kingston Park. Insert Picture of West Kingston Park and picture of south county bike path (William O’niel)

Preliminary Cost Estimate Current Market Prices Current Market Prices Concrete (cy): $ Concrete (cy): $ Steel Grade 50W (pound): $1.75 Steel Grade 50W (pound): $1.75 New England Bulb Tee (NEBT): $ LF New England Bulb Tee (NEBT): $ LF A Concrete Bridge Deck Approx 150 ft x 14 ft x 8 in. = $31,000 A Concrete Bridge Deck Approx 150 ft x 14 ft x 8 in. = $31,000

Personnel Profile – Jeff Ley Transportation Engineer Transportation Engineer Highway Engineering Coursework Highway Engineering Coursework Undergraduate Research Undergraduate Research

Segment Safety Issues Larger Shoulder Stopping Sight Distance Left Turn Lanes Lower College Road Fraternity Circle Keaney Gym

Roadway Sharing Issues Shared Shoulder Shared Shoulder Sidewalk Issues Sidewalk Issues Repair Repair Replace Replace Construct Construct Crossing Options Crossing Options Pedestrian Bridge Pedestrian Bridge Signalized Crosswalks Signalized Crosswalks

Traffic Calming Issues Roundabouts Route 2 Route 110 Route 108 Design Speed

Other Considerations Use of RAP (Recycled Asphalt Pavement) Use of RAP (Recycled Asphalt Pavement) Coordination of Historic Districts Coordination of Historic Districts Right-of-way acquisition Right-of-way acquisition

Personnel Profile – Ron Hardy Environmental Engineer Environmental Engineer DOT Internship DOT Internship Environmental Engineering Coursework Environmental Engineering Coursework

Investigations Common Contaminants Common Contaminants Retention Times Retention Times Climate Climate Topography Topography

Treatments Vortechnics Vegetative Swales Swirl Concentrators

Other Considerations Mobil Station Gas Spill Mobil Station Gas Spill Wetland Delineation Wetland Delineation Permit Acquisition Permit Acquisition

Hydrology Drainage Areas Direct Runoff Indirect Runoff Design Storm Runoff Quantity

System Evaluation Investigations Increased Curbing Increased Curbing Existing Drains Existing Drains Existing Culverts Existing CulvertsDesigns Drain Locations Drain Locations System Capacity System Capacity Culvert Capacity Culvert Capacity

Ultimate Design Goals Respect the needs of the community Respect the needs of the community Create and maintain historic perspective Create and maintain historic perspective Meet growing needs of the University Meet growing needs of the University Help users recognize roadway features Help users recognize roadway features Maintain safe, efficient traffic flow Maintain safe, efficient traffic flow Enhance bicycle / pedestrian accessibility Enhance bicycle / pedestrian accessibility

The Ability to Succeed