Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.

Slides:



Advertisements
Similar presentations
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
Advertisements

NEW DESIGN FOR RF FINGERS C. Garion 5 June, 2012TE-VSC1 Acknowledgements to A. Lacroix and H. Rambeau for materials and help.
MINIATURE ENGINEERING SYSTEMS GROUP MINIATURE CENTRIFUGAL COMPRESSOR TESTING Presented by Dipjyoti Acharya.
Vacuum Vessel Production Readiness Review
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Chapter -9 WEB STIFFENERS.
R.Valbuena NBI March 2002 CNGS Decay Pipe Entrance Window Structural and Thermal Analysis A.Benechet, P.Cupial, R.Valbuena CERN-EST-ME.
CM 197 Mechanics of Materials Chap 20: Connections
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
 2005 Pearson Education South Asia Pte Ltd TUTORIAL-1 : UNIAXIAL LOAD 1 PROBLEM-1 1 m P A composite A-36 steel bar shown in the figure has 2 segments,
3.9GHz Coupler Cold End Robustness Study Will Couplers survive on-site and overseas shipping? D. Olis, G. Galasso, M. McGee.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
1 Coupling Design Section VII. 2 Coupling? Classifications of Coupling A) Rigid Coupling B) Flexible Coupling Analysis of Bolts Talking Points.
Superconducting Large Bore Sextupole for ILC
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
Kanwalpreet Kaur Communication subsystem & Integration subsystem.
First TBL PETS prototype tank development D. Carrillo, E. Rodríguez, F. Toral, CIEMAT N. Chritin, S. Doebert, I. Syratchev, CERN CERN, 24/01/2008 Courtesy.
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
 2005 Pearson Education South Asia Pte Ltd TUTORIAL-1 : UNIAXIAL LOAD 1 PROBLEM-1 1 m P A composite A-36 steel bar shown in the figure has 2 segments,
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Cavity support scheme options Thomas Jones 25/06/15.
9 Torsion.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
 2005 Pearson Education South Asia Pte Ltd TUTORIAL-1 : UNIAXIAL LOAD 1 PROBLEM-1 1 m P A composite A-36 steel bar shown in the figure has 2 segments,
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
ATC/ABOC days, 24 January 2007Edda Gschwendtner1 CNGS : Status and Outlook Edda Gschwendtner, AB/ATB Summary of CNGS 2006 Reflector Repair OPERA Brick.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
18/07/2005 S. Rangod PH/DT1 1 CNGS HORN Mini-review induced by the break of the insulating glass disk.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
S. Lassiter, P. Brindza, M. Fowler, E. Sun - Jefferson Lab G. Markham - NovaTech, B. Wands - Fermi Lab Abstract—Jefferson Laboratory is developing a set.
Cavity support scheme options Thomas Jones 25/06/15 1.
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
The integration of 420 m detectors into the LHC
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
XXXIX PANDA COLLABORATION MEETING GSI-DECEMBER 2011 B. GIRAUDO / D. ORECCHINI CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS FIRST APPROACH AND PRELIMINARY.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 17 th 2014.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
D. V. RAMANAREDDY VARDHAMAN COLLEGE OF ENGINEERING
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
LCWS11 WG4 Fully featured accelerating structure engineering design
New nTOF target: Design Issues
Coupled thermal-structural FEA of AS tooling for brazing of manifolds to disk stack R. Raatikainen, F. Rossi
Stress and cool-down analysis of the cryomodule
Material alternatives to limit activation of ZS
Section VII Coupling Design.
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Preliminary Y-chamber specifications – First draft
Phase II Collimators : design status
Overview of mechanical design & construction
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
CNGS horn / reflector in 2005: The story of the glass ring insulator
Cryomodule Assembly Plan
Presentation transcript:

Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis Guidelines for new design

Ans Pardons 30/11/2006CNGS Reflector Technical Review Introduction (1/1) Water flow: 50 l/min No pressure, flow by gravity Estimated 18 l/min in last (red) connection Reflector layout sprayers drain tube (behind frame)

Ans Pardons 30/11/2006CNGS Reflector Technical Review Drain connection (1/4) Evacuate water from outer conductor to drain tube Connection between different polarities (500V) 5 identical assemblies in reflector, idem for horn

Ans Pardons 30/11/2006CNGS Reflector Technical Review Drain connection (2/4) Installed on horn & reflector Ceramic for electrical insulation Brazing, seals and collars to ensure leak & vapor tightness Bellows to give (some) flexibility Overlap (2x1.5cm) to ensure leak tightness if seal corrodes  Compressing bellows (max 2cm) does not suffice for dismounting or installation of the piece Picture taken in assembly lab Cross section

Ans Pardons 30/11/2006CNGS Reflector Technical Review Drain connection (3/4) Brazing Titanium flanges carefully machined Ceramic machined for precise fit (but introduces stress concentration) Ceramic = alumina type AL300 (97,6 %) with MoMn and Ni deposit Brazing through AgCuPd and AgCu Thickness of flange reduced to minimize residual stresses in ceramic Titanium flange Ceramic (machined) (info and picture from S. Mathot)

Ans Pardons 30/11/2006CNGS Reflector Technical Review Drain connection (4/4) Observations: Ceramic broken over full section Gap of ~1mm Leak of 15% of flow Misalignment visible? Work remains to be done… Ceramic Titanium

Ans Pardons 30/11/2006CNGS Reflector Technical Review Event Analysis (1/4) Ceramic Titanium Reasons for stress/rupture of ceramic : Brazing Machining of ceramics Thermal cool down after brazing Alignment errors Pile up of tolerances Error during assembly Additionally, the geometry is very rigid: Collars for vapor tightness (seal) Insufficient flexibility of the bellows (Vibration) Accident during assembly?

Ans Pardons 30/11/2006CNGS Reflector Technical Review Event Analysis (2/4) Ceramic Titanium Brazing Machining of ceramics Stress concentration at “shoulder” Stress value unknown (tension & compression) Thermal cool down after brazing With thick flange (first design) Broken ceramic observed after cool down Stress estimated at 280 MPa With thin flange (final design, installed) Stress estimated at 190 MPa (mainly compr.) Material data of Al2O3 Yield strength (tension): ~300MPa Yield strength (compression): ~2000MPa Young modulus: 300GPa Shear modulus 150GPa Ceramic Titanium

Ans Pardons 30/11/2006CNGS Reflector Technical Review Event Analysis (3/4) Alignment errors - Rigid assembly Stainless steel collars leave no flexibility, alignment errors are transmitted as stress to the ceramic Space constraints limit the length of the bellows. The bellows is not sufficiently flexible to absorb alignment errors larger than 1mm Different types of alignment errors Displacement error vs Parallelism error (assume flexible bellows) Flange Ceramic Flange Ceramic Bellows Flange Ceramic Collar Bellows Flange Ceramic Collar

Ans Pardons 30/11/2006CNGS Reflector Technical Review Event Analysis (4/4) (Vibration) Extrapolation from vibration measurements: Displacement of drain connector estimated <0.1mm Unlikely to have contributed to failure Conclusion Failure due to sum of stresses from alignment errors and brazing procedure. Live to learn Guidelines for new design

Ans Pardons 30/11/2006CNGS Reflector Technical Review Guidelines new design (1/1) No brazing or machining of ceramic Ensure complete water tightness Ensure a certain level of vapor tightness Minimize effect of alignment errors Foresee gaps to absorb alignment errors Foresee flexible parts or soft materials Careful assembly Geometrical inspection before installation Proposal for new design Stephane’s Talk