REINFORCED CONCRETE AND IRON RESTATING. Meeting 12 Study Program: S0673 / Building Construction II Year: 2007.

Slides:



Advertisements
Similar presentations
Concrete Technology Finishing Concrete Joints in Concrete Lecture 20
Advertisements

2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Reinforced Concrete Design-8
Lecture 9 - Flexure June 20, 2003 CVEN 444.
Commercial Framing C D Prints Unit 13.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
PICTURE IRON AND RESTATING Meeting 13 Study Program: S0673 / Building Construction II Period: 2007.
CHEMISTRY CONCRETE PERTEMUAN 05 Matakuliah: S0372 – Kimia Teknik Sipil Tahun: Ganjil 2007/2008.
LIGHT STEEL FRAME Meeting 11 Study Program: S0673 / Building Construction II Period: 2007.
ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Lecture Goals Slab design reinforcement.
CONCRETE STAIRS Meeting 6 Study Program: S0673 / Building Construction II Period: 2007.
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
Concrete
CTC 422 Design of Steel Structures
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
PILING FOUNDATION Meeting 3 Study Program: S0673/Building Construction II Period: 2007.
ROOF CONSTRUCTION Meeting 9 Study Program: S0673 / Building Construction II Period: 2007.
FLOOR Meeting 7 Study Program: S0673 / Building Construction II Period: 2007.
CONSTRUCTION.
METAL CORROSION PERTEMUAN 09 Matakuliah: S0372 – Kimia Teknik Sipil Tahun: Ganjil 2007/2008.
WOOD STAIRS Meeting 5 Study Program: S0673 / Building Construction Period: 2007.
Stairs Meeting 4 Study Program: S0673 / Building Construction II Year: 2007.
FOUNDATION Meeting 2 Study Program: S0673 / Building Construction II Period: 2007.
ROOF of WOOD CONSTRUCTION Meeting 10 Study Program: S0673 / Building Construction II Period: 2007.
1 Presentation 23 WINDOW AND DOOR. 2 Learning Outcomes By the end of this meeting, student will expected to be able to : Student can explain building.
FLOOR CONSTRUCTION Meeting 8 Study Program: S0673 / Building Construction II Period: 2007.
GAUGES Gauges perform an essential services in any scheme of quantity production on an interchangeable basis A gauge (or Limit Gauge) is a tool or instrument.
Slab Design.
Topic : MIX DESIGN OF CONCRETE Properties of concrete Submitted To: DR. AYUB ELAHI Submitted By: SOHAIB NASEER 2K9-scet-29/CIVIL M.ZAEEM FAKHAR 2K9-scet-03/CIVIL.
CRACK CONTROL IN CONCRETE MASONRY WALLS
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Intro to Concrete 18.0 & 19.0 Class notes.
University of Palestine
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Plain & Reinforced Concrete-1 CE-313
Reinforced Concrete Design
1.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
FORMS, SCAFFOLDING and STAGING
Concrete Slab Quality Requirements. Who Controls Concrete Quality Polishing contractors have to perform work on a concrete floor slab in which they had.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Fundamentals of Structural Detailing
The four basic types of structures are :
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Pipe Clips.
Er. Hiralal Agrawal EXECUTIVE ENGINEER.. Apparatus:  Concrete cube moulds of 15 cm size in required numbers.  Standard tamping bar (steel) of 16mm diameter.
Demonstrate Concrete Skills Form A wood or metal structure that confines concrete to the desired shape until it hardens.
Technological And Engineering EXPLAINS ERECTION PROCEDURE OF TIMBER BENCH AND RAILING TIMBER.
ENGINEERING PLUMBING AND SANITATION Applies Fire Company of Plumbing System.
ENGINEERING PLUMBING AND SANITATION
Framing Vocabulary Stud: upright beams in the framework of a building
TECHNOLOGY AND ENGINERRING
TECHNOLOGY AND ENGINERRING
DURABILITY OF CONCRETE STRUCTURES RURAL POLYTECHNIC TARIHAL
AQQABA SECONDRY SCHOOL Structural Design.
Introduction Used for covering spaces in the form of roof or floor
WORKABILITY TESTS OF CONCRETE
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
FOR 5TH SEMESTER DIPLOMA IN CIVIL ENGINEERING
Cast in Place 2 way Flat slabs Basically joists in both directions
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
Structural Drawing Chapter 19.
Building Construction I Sofia Sebastian 1
Design Ribbed and Flat Slabs
CONNECTION Prepared by : Shamilah
Presentation transcript:

REINFORCED CONCRETE AND IRON RESTATING. Meeting 12 Study Program: S0673 / Building Construction II Year: 2007

Bina Nusantara 3 Learning Outcome By the end of this meeting, expected student will be able to : Student can explain made building construction of concrete along with its picture.

Bina Nusantara 4 Outcome Items Items 1: Common Term of reinforced concrete. Items 2: Tables of concrete quality and class. Items 3: Bone and is thick of concrete blanket. Items 4: Execution of installation of restating.

Bina Nusantara 5 Construction Reinforced Concrete. Terms : Concrete : obtained materials by mixing smooth aggregate, harsh aggregate, water and cement. Reinforced concrete: concrete which consist of bone bar and planned pursuant to ascription that both the materials cooperate in shouldering styles. Prestressed concrete: reinforced concrete in which have been generated by tensions of intern in such division and value of aspect till tensions effect of burden can be neutralized until an wanted level.

Bina Nusantara 6 Preprint concrete: parts of reinforced concrete or spineless which printed in dimiciling is other the than dimiciling finally in construction. Light Concrete : concrete where its aggregate consist of light materialss. Spineless concrete: concrete which do not contain bone bar. Bone steel : steel type weared for the bone of concrete which must fulfill certain rules.

Bina Nusantara 7 Bar which is profile: bone bar with special surface form to enlarge juxtaposition with concrete. Artless bar : bone bar with slippery surface and in form of prismatis. Bone bundle : binding to consist of 2,3,4 or more bar which is bound profile along with slivering, so that all binding to work as one unity.

Bina Nusantara 8 Class and Quality Concrete Concrete for the construction of reinforced concrete divided into class and quality like in tables beside this : ClassQualityGoal IBNon Structural IIB1 K-125 K-175 K-225 Structural IIIK > 225Structural

Bina Nusantara 9 Bone Barb and Bend. full (of) Barb: Artless Bar. Bar which is profile. d= artless bar diameter. dp= diameter identification of bar which profile.

Bina Nusantara 10 Oblique barb: Artless Bar Bar which profile.

Bina Nusantara 11 Oblique Barb at Chock.

Bina Nusantara 12 For bone also have to be paid attention : Length channeling of bone depress. Length channeling of interesting bone. length of overlap. Distance between bone bar. etc

Bina Nusantara 13 Parts of Construction PLATE : Thick of plate may not be taken less than 7 cm for the plate of roof and 12 cm for the plate of floor. Plate bone, including divisor bone may not be taken less than needed to shoulder to dwindle and change of temperature. Wide of bone have to be taken minimum 0,25 % from wide of existing concrete. Wide bone divisor of minimum taken 20 % from wide fundamental bone. Bone diameter for the plate of fundamental bone minimum  8 mm, divisor bone  6 mm, when used soft steel and fundamental bone  5 mm, divisor bone  4 mm 4 mm for hard steel. Plate which thicker than 25 cm have to be attached. plate in places of momen maximum fulcrums and maximum field momen distance of[is each bone bar may not more than 20 cm or 2 thick times plate.

Bina Nusantara 14 Wall : Thick taken vertical wall minimum 1 / 30 from unfolding wall cleanness or 12 cm for wall shouldering to flex and 10 cm for wall which not shoulder to flex. External walls of subterranean room minimum 20 cm. Installation of bone vertical wall thickly less than 12 cm, bone attached in the middle of, while wall of reservoir water, and other wall thickly >/ 30 cm have to be attached bone double. Wide minimum bone 0,25 % from wide existing concrete. Used bone diameter equal to plate bone.

Bina Nusantara 15 LOG : Wide minimum log body 1 / 30 times unfold cleanness. High log have to as according to is wide log and fulfill demarcation of restating. For high log, comparison between wide and high more than 2,5 for log to continue and more 4,5 for log to the 2 fulcrums. Interesting bone minimum to every surface of log. Width surface of minimum bone steel  12 mm. Distance each bone may not more than 15 cm and less than 3 cm. Distance wedge with chock maximum log 30 cm or 2 / 3 is high log.

Bina Nusantara 16 COLUMN : Column size measure of strukturil wide minimum = 15 cm. Wide minimum bone = 1 % from wide surface of column, with minimum 1 bone bar in each surface area angle. Long Bar bone diameter minimize  12 mm. Wide long bone of column may not be taken more than 6 % from wide of surface of concrete. If long bone of continued column, tip of bar may not give by barb. Distance wedge with chock maximum at long bone of column taken smallest from : - Smallest size measure from wide surface of column times smallest long bone diameter cm

Bina Nusantara 17 Thick Cover of Concrete Thick cover of minimum concrete have to be taken as according to Tabel.1. Thick cover of concrete have to as according to planning picture. If not there are in the plan is, thick cover of concrete can be taken according to Tabel.1, in the affirmative and pertinent planning. In Tabel.1. beside, which interpreted with “ in” is external area covert concrete of influences of weather ( rain, direct sun and others) and do not relate to water.

Bina Nusantara 18 Tabel.1. Thick Cover of Minimum concrete. TABLES OF COVER OF CONCRETE MINIMUM. (CM) Construction Parts InsideOutsideDo not Seen Plate and membrane Wall Log Column

Bina Nusantara 19 Which interpreted “ outside” is area when external area natural concrete influences of weather ( rain, direct sun, and others) and relate to water. While which interpreted “ do not seen” when external area concrete after concrete finish worked cannot be estimated again.

Bina Nusantara 20 B.At constructions and or parts of concrete construction of pre print, thick cover of concrete can be taken less than which determined like sentence ( a ) with minimum 1 coming from accuracy of printing; mould and way of moulding can guarantee thickly cover of the concrete and concrete cures is in such a manner so that can limit barstly effect dwindle.

Bina Nusantara 21 C.In all matter, thick cover of concrete may not less than which determined following : At artless bar. : d At bar which profile. : dp At binding bone. : de where d is artless bar diameter, dp is diameter identification of bar which profile according to Section 3.7 sentence ( 4 ) and de is diameter of equivalent bind bone according to section 3.7 sentence ( 6).

Bina Nusantara 22 D.Thick cover of concrete which determined in sentence ( a) up to ( c ) have to be added with minimum 1 cm if surface of the concrete located in in corrosive environment, like when: relate to sea water. getting influence of alkali sulphate of ground water or ground. relate to corrosive gass or vapour. In this case, hence before planning started is thick cover of the concrete have to be specified ahead by planner pursuant to study regarding the nature of corrosive the than that environment also take counsel with taskmaster.

Bina Nusantara 23 WORK AND INSTALLATION OF BONE Work of Amputation and Retortion. 1. Work Detail and installation have to be prepared as job picture which must be made by Contractor before execution of work and agreed by Board of directors Field.

Bina Nusantara 24 2.Barb have to be passed to each terminating of artless bone. Barb thread iron only required if fulfilling the following situation : Especial bone laying in every column angle and log which is not covert. Chock. Placement above two fulcrums. By the end of bone to the from cantilever beam and plate.

Bina Nusantara 25 Column