4.2 Develop Project Management Plan

Slides:



Advertisements
Similar presentations
GRO Project Management Handbook
Advertisements

BSBPMG503A Manage Project Time 6.2 Sequence Activities Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
10.1 Identify Stakeholders
The Project Management Body of Knowledge (PMBOK)
Project Management – The Project Charter
Project Human Resource Management
BSBPMG506A Manage Project Human Resources 9.2 Acquire Project Team The process of confirming human resource availability and selecting the team members.
Certificate IV in Project Management Project Management Environment Course Number Qualification Code BSB41507.
BSBPMG506A Manage Project Human Resources 9.1 Develop Human Resource Plan The process of identifying and documenting project roles, responsibilities, required.
PMP® Exam Preparation Course
Chapter 3: The Project Management Process Groups: A Case Study
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
BSBPMG508A Manage Project Risk 11.4 Perform Quantitative Risk Analysis Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Certificate IV in Project Management Week 3 – Scope Management Course Number Qualification Code BSB41507.
Introduction PMBOK® © Whizlabs.
Apply Communication Management Techniques Project Communication Processes – Part 1 Certificate IV in Project Management Qualification Code BSB41507.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Human Resource Management Processes – Part 1 C ertificate.
BSBPMG502A Manage Project Scope 5.3 Create Work Breakdown Structure The process of sub dividing project deliverables and project work into smaller, more.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Diploma of Project Management Project Management Environment Course Number Qualification Code BSB51507.
BSBPMG403A Apply Cost Management Techniques Apply Project Cost Management Techniques Project Cost Processes C ertificate IV in Project Management
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Quality Assurance vs Quality Control
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
Project Management Process Groups and Knowledge Areas Source: PMBOK 4 th Edition Prepared
11.1 Plan Risk Management The process of defining how to conduct risk management activities for a project Detailed risk planning enhances the overall probability.
BSBPMG505A Manage Project Quality Manage Project Quality Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG505A.
BSBPMG505A Manage Project Quality 8.1 Plan Quality Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of identifying.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Project Time Processes – Introduction and Part 1 C ertificate IV in Project.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 1 C ertificate IV in Project Management
Lecture 2_2 The Project Management Process J. S. Chou, P.E., Ph.D. Assistant Professor.
BSBPMG504A Manage Project Costs 7.2 Determine Budget Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of aggregating.
Manage Project Human Resources Human Resource Management Processes – Part 1 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
BSBPMG504A Manage Project Costs Manage Project Costs Project Cost Processes Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
BSBPMG504A Manage Project Costs 7.3 Control Costs The process of monitoring the status of project expenditure Involves updating the project budget with.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Click on Next to continue Next Introductio n Inputs Tools and Techniques Outputs The process of managing procurement relationships, monitoring contract.
BSBPMG507A Apply Communication Management Techniques 10.3 Distribute Information The process of making relevant information available to project stakeholders.
11.2 Identify Risks The process of determining which risks may affect the project and documenting their characteristics This is an interactive process.
BSBPMG503A Manage Project Time 6.3 Estimate Activity Resources The process of estimating the type and quantities of material, people, equipment or supplies.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
BSBPMG407A Apply Risk Management Techniques Apply Risk Management Techniques Project Risk Processes Part 1 C ertificate IV in Project Management
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
4.5 Perform Integrated Change Control
BSBPMG502A Manage Project Scope 5.1 Collect Requirements The process of defining and documenting the needs of stakeholders Encompasses the requirements.
BSBPMG508A Manage Project Risk 11.6 Monitor and Control Risks Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
12.1 Plan Procurement: Introduction
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
The Project Management Process Groups
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit.
7.4 Control Costs The process of monitoring the status of the project costs and managing changes to the cost baseline. Involves updating the project budget.
Manage Project Time Project Time Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
5.5 Control Scope The process of monitoring the status of both the project and product scope Focuses on managing any changes to the scope baseline and.
4.4 Monitor and Control Project Work
7.3 Determine Budget The process of aggregating the estimated costs of individual activities or work packages in order to establish an authorised cost.
12.3 Control Procurements The process of managing procurement relationships, monitoring contract performance and making changes or corrections as needed.
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Project Management Processes
Project Integration Project integration management processes :
Presentation transcript:

4.2 Develop Project Management Plan This is the process of defining and documenting the actions necessary to prepare and integrate all subsidiary plans for each of the 8 key knowledge areas of project management. Good practice dictates that the Project Management Plan is baselined at the end of the Planning Phase, particularly in the areas of scope, cost and time It is progressively updated during project execution via the Perform Integrated Change Control process (PMBOK 4.5) It occurs during Planning Initiation Planning Execution Close Monitor Control Adapted from PMBOK 4th Edition

4.2 Develop Project Management Plan The planning processes for all project management key knowledge areas are normally performed at the same time as this process, or expanded upon shortly afterwards The relationship to Scope, Time and Cost is slightly different to the other areas of Communication, Risk, Human Resources, Quality and Procurement There are no stand alone Scope, Time or Cost Planning processes, they are contained within the Develop Project Management Plan process The other key knowledge areas have discrete processes for planning that are defined in their process groups Adapted from PMBOK 4th Edition

4.2 Develop Project Management Plan The Project Management Plan – can be composed of subsidiary plans for each of the 8 key knowledge areas or these planning elements can be included into one integrated end product can be either high level or detailed depending on the characteristics of the project and the project management methodology that is being applied Can only be changed via a Change Request once it has been baselined defines how all aspects of the project are to be undertaken through the Execution Phase establishes the mechanisms and processes to Monitor and Control the project defines how the project is to be Closed Initiation Planning Execution Close Monitor Control Adapted from PMBOK 4th Edition

4.2 Develop Project Management Plan Inputs into the Project Management Plan – Project Charter Subsidiary plans developed in other planning processes Industry standards and regulations Organisational policies and procedures Project management methodology Project management tools Planning templates Knowledge from past projects Expert judgement and advice Initiation Planning Execution Close Monitor Control Adapted from PMBOK 4th Edition

4.2 Develop Project Management Plan There are very limited tools and techniques to develop the Project Management Plan The primary area of assistance comes from experts who have specific skills and experience in the type of project being planned Consultants Project Management Office Professional Associations Focus groups Project Sponsor Stakeholders Industry Groups Research Other Project Managers Subject Matter Experts Customers Adapted from PMBOK 4th Edition

4.2 Develop Project Management Plan The major output of this process is the Project Management Plan and perhaps some form of official approval to proceed with the project Common inclusions in the Project Management Plan – Project lifecycle and project management processes Selected tools and techniques Project objectives and how these will be achieved Change Management Plan Baselines for Scope, Time and Cost Performance measurement and status reporting processes Governance structure Team structure Subsidiary plans if required Initiation Planning Execution Close Monitor Control Adapted from PMBOK 4th Edition

4.2 Develop Project Management Plan Procedures contained within the Project Management Plan - Detail of the lifecycle selected for the project and the processes for each phase, typically tailored specifically for each project Descriptions of tools and techniques to be used by the project management team How work will be executed via different resourcing, team structures and contractual arrangement Change Management Plan with detailed processes for integrated change control Configuration Management Plan – often for larger IT, Engineering and Construction projects Procedures for maintaining and amending baselines Communication mechanisms and tools Procedures for and timing of key management reviews, sign off and approval Initiation Planning Execution Close Monitor Control Adapted from PMBOK 4th Edition

4.2 Develop Project Management Plan Baselines contained within the Project Management Plan – Schedule baseline Cost baseline Scope baseline Scope Baseline produced during 5.4 Verify Scope Schedule Baseline produced during 6.5 Develop Schedule Cost Baseline produced during 7.2 Determine Budget Adapted from PMBOK 4th Edition