Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

1. We can’t promise all green lights… …but we can minimize the number of red lights, stops and delays.
Hillsborough County Metropolitan Planning Commission (MPO) Prepared for: Prepared by: Intelligent Transportation Systems Committee November 17, 2011 URS.
Presented by: SAGE KAMIYA, P.E., PTOE
Los Angeles County Metropolitan Transportation Authority (Metro) Metro’s Countywide Signal Priority Program T3 Webinar January 22, 2008.
Ronald B. Achelpohl, PE Operation Green Light Mid-America Regional Council.
KC REGIONAL TRAFFIC SIGNAL COORDINATION. Agenda  National Perspective  OGL Video Overview  Mid – America Regional Council  Program Elements  What.
SPUTNIC – Strategies for Public Transport in Cities Strategies for Public Transport in Cities Funded by the EU Project introduction.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
TRAFFIC SIGNAL MANAGEMENT. PURPOSE Purpose: Foster understanding through development of educational outreach materials Illustrate benefits and basic techniques.
Economic Analysis in Transportation Systems CE 7640: Fall 2002 Prof. Tapan K. Datta, Ph.D., P.E.
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Gresham Traffic Signal System Optimization A Comprehensive Evaluation of Corridor Performance After Deploying Adaptive Signal Control.
Transportation System Issues and Challenges
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
NATMEC JUNE 5, 2012 DALLAS, TEXAS Improving MPO Decisions With Better Data: Examples in Dallas-Fort Worth Michael Morris, P.E. Director of Transportation.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
May 22, 2003 ITSA Executive Networking Session #63 Hidden Text.
Michigan VII: Technology Improving Lives ITS Midwest Annual Meeting February 7, 2006 Gregory D. Krueger, P.E. Statewide ITS Program Manager Michigan Department.
Cross Town Improvement Project. Performance Metrics.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
4-1 Model Input Dollar Value  Dollar value of time  Accident costs  Fuel costs  Emission costs.
Transportation Services Budget February 4, 2010 Josh Davis, Director 1.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
The Fully Networked Car Geneva, 4-5 March Ubiquitous connectivity to improve urban mobility Hermann Meyer ERTICO.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
Think Regionally - Act Locally The Development and Evolution of the I-95 Corridor Coalition: Think Regionally - Act Locally John Baniak Executive Director,
September 6, 2011 Summerville Chamber Public Policy Committee.
Progress on Board Priorities Denver Regional Council of Governments February 23, 2007.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
Challenges and Choices San Francisco Bay Area Long Range Plan Therese W. McMillan Deputy Executive Director, Policy Metropolitan Transportation Commission.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
1 Adaptive Control Software – Lite (ACS-Lite) Eddie Curtis, P.E. FHWA Resource Center / HOTM NTOC Webcast March 27, 2008.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
Success with Miami-Dade County’s ATMS Upgrade Success with EMBEDDED INTEGRATORS Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Traffic Management System Status Update February, 2008.
KC REGIONAL TRAFFIC SIGNAL COORDINATION. ABOUT MARC  Council of Governments  Metropolitan Planning Organization  Programs Aging Services Early Education.
The Indiana Local Technical Assistance Program Local Agency Perspective Neal Carboneau, PE Research Manager.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
Alternate Work Schedule Update Presented by: Robbie Berg, HR Director On November 5, 2009.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Engineering College, Tuwa. Design Engineering 1 - B  Guided by, SUBMITTED BY, PRAGNESH PATEL SHAH HETAXI ( ) RAJPUT VIVEK ( ) SOLANKI.
Pacific Aviation Investment Program. US$125 m Adaptable Program Loan Phase 1 Phase 2, 3, 4 Objective: improve operational safety and oversight of international.
Beyond The Bus: HART Environmental Program
ITSVA Annual Conference and Exposition May 2016
The Business of Transportation
The Business of Transportation
ITE Midwestern District Conference June 20, 2017
Welcome to Newcastle – Newcastle Connected Corridor
Chicago to Council Bluffs-Omaha
TSMO – What Does It Mean for Planners?
Presentation transcript:

Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC

What is Operation Green Light? Operation Green Light is a project to improve the coordination of traffic signals on major routes throughout the Kansas City area.

Kansas City 1.7 million people 1.7 million people 3800 Sq. Miles 3800 Sq. Miles 8 Counties 8 Counties 115 cities 115 cities 2 states 2 states

Operation Green Light: Mission Reduce: Air Pollution Air Pollution

Operation Green Light: Mission Reduce: Air Pollution Air Pollution Vehicle Stops Vehicle Stops

Operation Green Light: Mission Reduce: Air Pollution Air Pollution Vehicle Stops Vehicle Stops Delays Delays

Operation Green Light: Mission Reduce: Air Pollution Air Pollution Vehicle Stops Vehicle Stops Delays Delays Driver Frustration Driver Frustration

Operation Green Light: Mission Reduce: Air Pollution Air Pollution Vehicle Stops Vehicle Stops Delays Delays Driver Frustration & Driver Frustration & Fuel Consumption Fuel Consumption

Context of Peer-to-Peer Visit Explore and research best practices in traffic signal timing optimization Explore and research best practices in traffic signal timing optimization Lessons learned by other cities Lessons learned by other cities Deploy best traffic signal optimization techniques in Kansas City area Deploy best traffic signal optimization techniques in Kansas City area

Operation Green Light: Vision Seamless Transportation System without Jurisdictional Boundaries

Operation Green Light Strategy Upgrade Hardware Upgrade Hardware Cooperative Relationships Cooperative Relationships Communication Networks Communication Networks Regionally Optimized Signal Timing Regionally Optimized Signal Timing

Project Structure Technical Committee Technical Committee Steering Committee Steering Committee User’s Group Public Works Directors Traffic Engineers Traffic Engineers/ Signal Technicians PolicyTechnical Procurement Workgroup MARC Board

Technical Challenges Technical Challenges Challenges Related to Multi-jurisdictional Cooperation Challenges Related to Multi-jurisdictional Cooperation BRW & Lee Engineering : Technical Feasibility Study BRW & Lee Engineering : Technical Feasibility Study Sheila Shockey: Internal Consensus Process Sheila Shockey: Internal Consensus Process

Project Challenges OPERATIONS OPERATIONS MANAGEMENT MANAGEMENT Technical Challenges, Project Management Technical Challenges, Project Management Inter-Agency Cooperation Inter-Agency Cooperation

Project Challenges: Technical Variety of Field Controllers Variety of Field Controllers Out-dated Technology Out-dated Technology Lack of Interconnect between Controllers Lack of Interconnect between Controllers Not Enough Resources Not Enough Resources

Project Challenges: Technical Variety of Field Controllers Variety of Field Controllers Out-dated Technology Out-dated Technology Lack of Interconnect between Controllers Lack of Interconnect between Controllers Not Enough Resources Not Enough Resources Central System Software Provide: Personnel Funds (14 Million in Phase 1 47 Million in latter Phases) Upgrade

Project Challenges: Inter-Agency Cooperation 20 Cities, 2 States 20 Cities, 2 States Technology Technology Philosophy Philosophy Mistrust Mistrust Fear Fear Turfism Turfism

Project Challenges: Inter-Agency Cooperation 20 Cities, 2 States 20 Cities, 2 States Technology Technology Philosophy Philosophy Mistrust Mistrust Fear Fear Turfism Turfism Training, Equipment Upgrades Training, Pilot Projects, Flexibility Systems Engineering, Management Principles

Communication Infrastructure Towers Water Tanks

Partnership for a Regional Communication Infrastructure Member Cities Member DOTS Public Safety Fire Stations

Licensed Backbone

Unlicensed Communication to Signals

Pilot Signal Optimization Project City of Olathe, KS 8 Signals 2 Miles ADT 50,000 VPD

Speed profile: Before

Speed Profile: After

Benefits: Travel Time Morning Peak – 26% reduction (74 sec) Morning Peak – 26% reduction (74 sec) Noon Peak – 37% reduction (137 sec) Noon Peak – 37% reduction (137 sec) $.44 savings per trip $.44 savings per trip

Benefits: Travel Speed Morning Peak – increased by 33% Morning Peak – increased by 33% Noon Peak – Increased by 58% Noon Peak – Increased by 58%

Benefits: Fuel Consumption Morning Peak – 18% reduction Morning Peak – 18% reduction Noon Peak – 26% reduction Noon Peak – 26% reduction $0.05 savings per trip $0.05 savings per trip

Benefits: Vehicle Emissions Morning Peak – 19% reduction Morning Peak – 19% reduction Noon Peak – 26% reduction Noon Peak – 26% reduction

Benefits: Vehicle Stops Morning Peak – 64% reduction Morning Peak – 64% reduction Noon Peak – 73% reduction Noon Peak – 73% reduction $0.14 savings per trip $0.14 savings per trip

Daily/Annual Savings Performance Measures Daily Benefits Annual Benefits Vehicle hours of travel ,028 hours reduction Fuel consumption ,688 gallons decrease Time and fuel costs $ 15,688 $ 15,688 $ 4,157,188 $ 4,157,188savings Total pollutant emissions ,531 Kilograms reduction *Assuming that 25,000 vehicles are impacted daily.

Operation Green Light Project Update Project Update The Future The Future

Partnerships KC SCOUT KC SCOUT Emergency Management System Emergency Management System

Maintenance Issues Cooperative Relationships Traffic Signal Timing Communication Network

Reggie Chandra